Revision History

 

 

 

 

 

 

 

 

 

0

1st Submission

30 Aug 2021

Rev.

Description of Modification

Date

 

 


 

Content

 

Executive summary

1. basic project information …………………………………………1

2. Noise Monitoring……………………………………………………5

3. Waste Management ………………………………………………...5

4. Summary of Monitoring Exceedance, Complaints, Notification of Summons and Prosecutions…………………….5

5. EM&A Site Inspection………………………………………………6

6. Landfill gas monitoring ……………………………………..…....8

7. Conclusion and Recommendations……………………………….9

 

 

Appendix A

Overview of Mainlaying in TKO

Appendix B

Project Organization Chart

Appendix C

Construction Programme

Appendix D

Layout of Major Construction Works Undertaken during the Reporting Quarter

Appendix E

Waste Flow Table

Appendix F

Summary of Implementation Status of Environmental Mitigation

Appendix G

Action and Limit Level for Noise and Landfill Gas

Appendix H

Landfill Gas Monitoring Results

 

Appendix I

Complaint Log and Regulatory Compliance Proforma

 

Appendix J

Noise Impact Monitoring Results

Appendix K

Academic School Calander

Appendix L

Exceedance Report(s)

 

 


EXECUTIVE SUMMARY

 

A1.         Penta-Ocean - Concentric Joint Venture (POCJV) is contracted to carry out the Mainlaying in Tseung Kwan O under Contract No. 13/WSD/16 (hereinafter known as “the Project”).

A2.         In accordance with the Environmental Monitoring and Audit (EM&A) Manual for the Project, EM&A works should be carried out by Environmental Team (ET), Acuity Sustainability Consulting Limited (ASCL), during the construction phase of the Project.

A3.         The construction works of Mainlaying in Tseung Kwan O were commenced on 30 August 2018. This is the 12th quarterly Environmental Monitoring and Audit (EM&A) summary Report prepared by ASCL. This report presents the EM&A works carried out during the period of 1 May 2021 to 31 July 2021.

A4.         A summary of the monitoring activities undertaken in this reporting period is listed below:

Monitoring Activities

Frequency

Daytime Noise monitoring

13 times

Landfill Gas Monitoring

2230 times

Environmental Site Inspection

13 times

              

A5.         No project-related exceedance of the Action/Limit Level was recorded during the reporting quarter.

A6.         13 times of noise impact monitoring were conducted on 7, 13, 21 and 26/05/2021, 3, 10, 19 and 25/06/2021 and 2, 8, 16, 20 and 28/07/2021 at NSR4 Creative Secondary School since projected-related construction activities were undertaken within a radius of 300m from the monitoring location.

A7.         No exceedance of landfill gas monitoring was recorded during the reporting quarter.

A8.         One project-related environmental complaint was received in the reporting quarter and the site condition of the concerned area was reviewed by ET. ET noted that although there was no excavation works on-going or scheduled, clearance works and works that create disturbance to ground surface were previously conducted. To prevent the muddy water discharge from the construction site, the contractor has implemented and enhanced the mitigation measures to cater for any upcoming rainstorms or heavy precipitation from the site. Sandbags are placed along the site boundary and submersible pump is provided to direct the runoff to the wastewater treatment tank before reusing or discharging into the designated discharge point. Cement application to exposed earth within the site was also observed during the inspection on 13 August 2021, which was being implemented to prevent erosion caused by the precipitation. The temporarily exposed slope and areas were covered by tarpaulin.

A9.         No summons/ prosecutions were received in the reporting quarter.

A10.      There were no changes to be reported that may affect the on-going EM&A programme.


1   Basic Project Information

1.1.1        Background

1.1.2        The proposed Desalination Plant at Tseung Kwan O (DPTKO) will produce potable water with an initial capacity of 135 million liters per day (MLD), expandable to an ultimate capacity of 270 MLD in the future to provide a secure and alternative fresh water resource complying with the World Health Organization (WHO) standards. The plant will adopt the Seawater Reverse Osmosis (SWRO) technology, which dominates the market due to its reliability and progressive reduction in cost as the technology advances.

1.1.3        Pursuant to the Environmental Impact Assessment Ordinance (EIAO), the Director of Environmental Protection granted the Variation of Environmental Permit (No. EP-503/2015/A) to Water Supplies Department (WSD) for the Project on 26 January 2018.

1.1.4        The scope of the Contract may be considered in brief, to consist of the laying of about 10km long 1200mm diameter fresh water mains and the associated works along the alignment of the Project as shown with the overall view in Appendix A.

1.1.5        The Reporting Scope

1.1.6        This is the 12th Quarterly EM&A Report for the Project which summarizes the key findings of the EM&A programme during the reporting period from 1 May 2021 to 31 Jul 2021.

1.1.7        The Project Organization structure for the Construction Phase is presented in Appendix B.

1.1.8        Contact details of the key personnel are presented in Table 1.1 below:

Table 1.1 Contact Details of Key Personnel

Party

Position

Name

Telephone no.

Penta-Ocean -Concentric Joint Venture

Environmental Officer

Calvin Chik

9863-5630

Acuity Sustainability Consulting Limited

Environmental Team Leader

Jacky Leung

2698-6833

ANewR Consulting Limited

Independent Environmental Checker

James Choi

2618-2831

1.1.9        Summary of Construction Works

1.1.10     Details of the major construction works undertaken in this reporting quarter are shown in Table 1.2 and Appendix D. The construction programme is presented in Appendix C.

Table 1.2 Summary of the Construction Works Undertaken during the Reporting quarter

Location

Location

Works Conducted in the reporting month

Portion H of the Project Site

TKO 137 Pit B

·       Pipe jacking by TBM was conducted.

Portion J of the Project Site

Wan Po Rd – Workfront 1

·       Pipe trench excavation and pipe laying works were conducted.

Wan Po Rd – Workfront 2

·       Pipe trench excavation and pipe laying works were conducted.

Wan Po Rd – Workfront 3

·       Pipe trench excavation and pipe laying works were conducted.

Wan Po Rd – Workfront 4

·       Pipe trench excavation and pipe laying works were conducted.

Wan Po Rd – Pit A

·       Pit excavation and ELS works were conducted.

Wan Po Rd – Pit B

·        Drilling and re-grouting works were conducted.

·        Pit excavation works were conducted.

Wan Po Rd – Pit D

·        Pit excavation and ELS works were in-progress.

Landfill Stage 1 – Area A

·      Construction works for 900HSV chamber were conducted.

Landfill Stage 1 – Area B

·      Trench excavation and pipe laying were conducted.

Cycle Track – Workfront 1

·      Trench excavation and pipe laying were conducted.

Cycle Track – Workfront 2

·      Trench excavation and pipe laying were conducted.

Pung Loi Rd – Pit WPR1

·      Trial pit works and removal of abandoned CLP cable were conducted.

Velofrome – Pit J1A

·      Pit construction works were conducted.

·      Setting up work for trenchless works by hand-shield was conducted

Velodrome – Pit M

·      Pipe jacking preparation works were conducted.

·      Commencement of Micro Tunnel Boring Machine (MTBM) pipe jacking works

Velodrome – Pit O

·      Construction works for rescue pit for TBM were conducted.

Velodrome – Pit P

·        Pipe jacking preparation works.

·        Horizontal drilling ground treatment works were conducted.

Mau Wu Tsai – Workfront 1

·      Trench excavation and pipe laying works were conducted.

Po Lam Road (D2)

·      Trench excavation and pipe laying works were conducted.

·      Reinstatement works were conducted

Po Lam Road (A0)

·      Trench excavation and pipe laying works were conducted.

·      Trench backfilling and re-instatement works were conducted.

·      Concrete carriageway reinstatement works were conducted.

Po Lam Road (D1)

·      Trench excavation and pipe laying works were conducted.

Po Lam Road (B5)

·      Trench excavation and pipe laying works were conducted.

Tsui Lam Road

·      Trial pit works were conducted.

·      Reinstatement work of trial pit was conducted

TKO Primary Service Reservoir

·      Trench excavation and pipe laying works were conducted.

·      Trai pit excavation works were conducted.

1.1.11     Summary of Environmental Status

1.1.12     A summary of the valid permits, licences, and /or notifications on environmental protection for this Project is presented in Table 1.3.

 Table 1.3 Summary of the Status of Valid Environmental Licence, Notification, Permit and Documentations

Permit/ Licences/ Notification

Reference

Validity Period

Remarks

Variation of Environmental Permit

EP no.: EP-503/2015/A

Throughout the Contract

-

Notification of Construction Works under the Air Pollution Control (Construction Dust) Regulation (Form NA)

Ref no.: 423775

Throughout the Contract

-

Chemical Waste Producer Registration

WPN: 5213-839-P3287-01

Throughout the Contract

-

Billing Account for Disposal of Construction Waste

A/C no.: 7029491

Throughout the Contract

-

Water Discharge License

WT00032336-2018

Until 31 Dec 2023

-

Construction Noise Permit

(Hong Kong Velodrome)

GW-RE0961-20

From 20 November 2020 until 17 May 2021

-

Construction Noise Permit

(Hong Kong Velodrome)

GW-RE0494-21

From 17 May 2021 until 16 Nov 2021

 

Construction Noise Permit

(Tseung Kwan O Area 137, N.T.)

GW-RE0383-21

From until 1 May 2021 30 September 2021

 

Construction Noise Permit

(Wan Po Road, Wan O Road and Chun Yat Street)

GW-RE0277-21

From 31 March 2021 until 30 September 2021

-

1.1.13     The status for all environmental aspects is presented Table 1.4.

Table 1.4 Summary of Status for Key Environmental Aspects under the EM&A Manual

Parameters

Status

Noise

Baseline Monitoring

The baseline noise monitoring result has been reported in Baseline Monitoring Report and submitted to EPD under VEP Condition 3.4

Impact Monitoring

13 times of noise impact monitoring were conducted on 7, 13, 21 and 26/05/2021, 3, 10, 19 and 25/06/2021 and 2, 8, 16, 20 and 28/07/2021 at NSR4 Creative Secondary School since projected-related construction activities were undertaken within a radius of 300m from the monitoring location.

Waste Management

Mitigation Measures in Waste Monitoring Plan

On-going

Landfill Gas Monitoring

Mitigation Measures

On-going

Monitoring

On-going

Environmental Audit

Site Inspection

On-going

1.1.14     Other than the EM&A works by ET, regular environmental management meetings were conducted in order to enhance environmental awareness and closely monitor the environmental performance of the contractors.

1.1.15     The EM&A programme has been implemented in accordance with the recommendations presented in the approved EIA Report and the EM&A Manual. A summary of implementation status of the environmental mitigation measures for the construction phase of the Project during the reporting period is provided in Appendix F.


 

2                Noise Monitoring

2.1.1        Referring to EM&A manual Section 4.1.2, the impact noise monitoring should be carried out at all the designated monitoring stations when there are project-related construction activities undertaken within a radius of 300m from the monitoring stations.

2.1.2        13 times of noise impact monitoring were conducted on 7, 13, 21 and 26/05/2021, 3, 10, 19 and 25/06/2021 and 2, 8, 16, 20 and 28/07/2021 at NSR4 Creative Secondary School since projected-related construction activities were undertaken within a radius of 300m from the monitoring location.

2.1.3        NSR4 was appointed as a Hong Kong Diploma of Secondary Education Examination (HKDSE) examination centre from 03rd to 15th May, 2021 in the reporting period. Examinations were scheduled in the reporting month on 21st and 26th May, 2021. Hence the noise limit level was 65.0 dB(A) on 07th, 21st and 26th May, 2021. The noise limit level was 70 dB(A) for other impact monitoring dates. DSE examination schedule and Academic School Calendar can be found in Appendix K. No examinations were scheduled for NSR4 Creative Secondary School in June and July 2021. Academic School Calendar can be found in Appendix K.

2.1.4        Detailed monitoring results are presented in Appendix J. Academic School calander for the reporting quarter was presented in Appendix K.

2.1.5        No notification of summons and prosecution related to noise was received in the reporting quarter.

2.1.6        No noise project-related complaints were received in the reporting quarter.

 

3            Waste Management

3.1.1        A total of 6.285 m3 of inert C&D materials was collected to the Fill Bank, 0.011 m3 C&D waste and general refuse were disposed of at Landfill, 0.152 tonnes of paper/ cardboard packaging was recycled and 0 tonnes chemical waste collected by licensed contractor for disposal in the reporting quarter. Waste Flow Table is shown in Appendix E.

 

4        Summary of Monitoring Exceedance, Complaints, Notification of Summons and Prosecutions

4.1.1        One project-related environmental complaint was received in the reporting quarter and the site condition of the concerned area was reviewed by ET. ET noted that although there was no excavation works on-going or scheduled, clearance works and works that create disturbance to ground surface were previously conducted. To prevent the muddy water discharge from the construction site, the contractor has implemented and enhanced the mitigation measures to cater for any upcoming rainstorms or heavy precipitation from the site. Sandbags are placed along the site boundary and submersible pump is provided to direct the runoff to the wastewater treatment tank before reusing or discharging into the designated discharge point. Cement application to exposed earth within the site was also observed during the inspection on 13 August 2021, which was being implemented to prevent erosion caused by the precipitation. The temporarily exposed slope and areas were covered by tarpaulin.


 

5        EM&A Site Inspection

5.1.1        Site inspections were carried out on a weekly basis to monitor the implementation of proper environmental pollution control and mitigation measures under the Contract. In the reporting quarter, site inspections were carried out on 7, 14, 20 and 26 May 2021, 3, 11, 18 and 25 June 2021, and 2, 8, 16, 22 and 27 July 2021 at the site portions list in Table 5.1 below.

Table 5.1 Site Inspection Record

Date

Inspected Site Portion

Time

7, 14, 20 and 26 May 2021,

3, 11, 18 and 25 June 2021, and

2, 8, 16, 22 and 27 July 2021

Portion F, H and J

 

9:15 am – 12:30 pm 

5.1.2        Three joint site inspections with IEC was carried out on 26 May 2021, 25 June 2021 and 27 July 2021.

5.1.3        Minor deficiencies were observed during weekly site inspection. Key observations during the site inspections are summarized in Table 5.2.

Table 5.2 Site Observations

Date

Environmental Observations

Follow-up Status

07 May 2021

1.     Oil leakage was observed at 137 Pit B.

1.    Oil leakage was cleaned.

14 May 2021

1.      Chemicals were not placed on a drip tray at Mau Wu Tsai Abandoned Road.

2.      NRMM label was not observed at the NRMM at Pit X.

1.      Chemicals were removed.

2.      NRMM label was replaced.

20 May 2021

1.        Chemicals were not placed on a drip tray at CH.HE1+80~2+00, Section A0 and Po Lam South Road.

2.       NRMM label was not observed at the NRMM at Po Lam South Road, Pit X.

1.    Chemicals were removed.

2.    The NRMM was out of service and would be transported out from the working portion.

26 May 2021

No observations were recorded on the respective day.

03  June 2021

1.       Environmental permit was not observed at the vehicle entrance/exit at 137 Pit C.

2.       Gully was not protected by sandbags and geo-textile at Wan Po Road 2.

1.     Environmental permit was observed at the vehicle entrance/exit.

2.    Gully was protected by sandbags and geo-textile.

11 June 2021

1.      Chemicals were found not placed on a drip tray at CH.HE1+80~2+00.

2.      Dusty materials (temporary) were not covered by tarpaulin sheet to limit dust emission at CH.HE1+80~2+00.

1.      Chemicals were removed.

2.      Dusty materials (temporary) were covered by tarpaulin sheet to limit dust emission.

18 June 2021

1.        Gully was not protected by sandbags and geo-textile at Wan Po Road 2 and Wan Po Road 3.

2.        Construction boundaries were not protected by sandbags fully at Wan Po Road 3.

3.        Dusty materials were found directly next to the water barriers. These materials shall be removed to prevent these materials escape from the construction site at Wan Po Road 3.

1.    Gully was protected by sandbags and geo-textile.

2.    Construction boundaries were protected by sandbags.

3.    Dusty materials were cleaned.

25 June 2021

No observations were recorded on the respective day.

02 July 2021

1.       Chemicals were not placed inside a drip tray at Portion F, Wan Po Road 4, Landfill Stage 1 Area A and CH.FC 4+50.

2.     Environmental permit was not observed at the site entrance/exit at Wan Po Road 4, Pit A.

3.     Gully was not covered with geo-textile and sandbags at Wan Po Road 3.

4.     Untreated wastewater was observed discharging from the site area at Wan Po Road 3.

5.     Construction boundary was not protected by sandbags fully at Jacking Pit B.

1.    Chemicals were placed in the drip tray or removed.

2.    Environmental permit was observed.

3.    Gully was covered with geo-textile and sandbags.

4.    No water was discharged from the construction site.

5.    Construction boundary was protected by sandbags fully.

08  July 2021

1.    Environmental permit was not observed at the exit or entrance at Wan Po Road

2.    Untreated water was observed discharging from the site at Wan Po Road 3. A sedimentation tank or water treatment facilities should be added.

3.    Chemicals were not placed on a drip tray at Wan Po Road 3.

4.    Construction boundary was not fully protected by sandbags at Wan Po Road 3.

1.      Environmental permit was observed.

2.      No water was discharged from the construction site

3.      Chemicals were removed.

4.      Construction boundary was fully protected by sandbags.

16  July 2021

1.    Environmental permit was not observed at Pit L (Hong Kong Velodrome).

2.    Regular cleaning of drip tray should be conducted to prevent overflow of trapped materials at Pit O. (Hong Kong Velodrome).

3.    Regular cleaning of deposited materials in the water sedimentation tank to allow efficient drainage at Pit O should be conducted (Hong Kong Velodrome).

4.    Oil leakage was observed at Pit N (Hong Kong Velodrome).

1.    Environmental permit was observed.

2.    Drip tray was cleaned.

3.    Deposited materials in the water sedimentation tank was cleaned.

4.    Oil leakage was cleaned.

22  July 2021

1.      Environmental permit was not observed at the site entrance/exit at Pit Y.

2.      Chemical was not observed in a drip tray at Pit O.

1.      Environmental permit was observed.

2.      Chemical was removed.

 

27 July 2021

No observations were recorded on the respective day.

5.1.4        According to the EIA Study Report, Environmental Permit, contract documents and EM&A Manual, the mitigation measures detailed in the documents should be implemented as much as practical. An updated Implementation Status of Environmental Mitigation Measures (EMIS) is provided in Appendix F.

 

6            Landfill gas monitoring

6.1.1        In accordane with Section 11 of the EM&A Manual, monitoring of landfill gas is required for construction works within the 250m Consultation Zone. Part of the desalination plant and the indicative area of natural slope mitigation works fall within the SENT Landfill Extension Consultation Zone; and part of the 1,200 mm diameter fresh water mains along Wan Po Road falls within the SENT Landfill and SENT Landfill Extension Consultation Zones, TKO Stage II/III Restored Landfill and TKO Stage I Restored Landfill Consultation Zones. Monitoring was conducted from May 2021 to July 2021.

6.1.2        Monitoring of oxygen, methane and carbon dioxide was performed for excavations at 1m depth or more within the consultation Zone. In this reporting quarter, 2230 times of monitoring was recorded. Action and Limit Level is provided in Appendix G.

6.1.3        Monitoring Equipment used in the reporting quarter are summarised in Table 6.1.

6.1.4        In the reporting quarter, landfill gas monitoring was carried out by the Registered Safety Officer by the Contractor at the excavation locations for 2230 times. The monitoring results and Action Level are provided in Appendix H and Appendix G respectively.

Table 6.1 Landfill Gas Monitoring Equipment

Equipment

Model and Make

Calibration Expiry Date

Gas Detector

QRAE III

27 July 2021

Gas Detector

QRAE III

27 July 2022

 

7                Conclusion and Recommendations

7.1.1        This is the 12th quarterly Environmental Monitoring and Audit (EM&A) Summary Report prepared by ASCL. This report presents the EM&A works carried out during the period of 1 May 2021 to 31 July 2021 in accordance with the EM&A Manual and the requirement under EP-503/2015/A.

7.1.2        13 times of noise impact monitoring were conducted on 7, 13, 21 and 26/05/2021, 3, 10, 19 and 25/06/2021 and 2, 8, 16, 20 and 28/07/2021 at NSR4 Creative Secondary School since projected-related construction activities were undertaken within a radius of 300m from the monitoring location.

7.1.3        NSR4 was appointed as a Hong Kong Diploma of Secondary Education Examination (HKDSE) examination centre from 03rd to 15th May, 2021 in the reporting period. Examinations were scheduled in the reporting month on 21st and 26th May, 2021. Hence the noise limit level was 65.0 dB(A) on 07th, 21st and 26th May, 2021. The noise limit level was 70 dB(A) for other impact monitoring dates. DSE examination schedule and Academic School Calendar can be found in Appendix K. No examinations were scheduled for NSR4 Creative Secondary School in June and July 2021. Academic School Calendar can be found in Appendix K.

7.1.4        One project-related environmental complaint was received in the reporting quarter and the site condition of the concerned area was reviewed by ET. ET noted that although there was no excavation works on-going or scheduled, clearance works and works that create disturbance to ground surface were previously conducted. To prevent the muddy water discharge from the construction site, the contractor has implemented and enhanced the mitigation measures to cater for any upcoming rainstorms or heavy precipitation from the site. Sandbags are placed along the site boundary and submersible pump is provided to direct the runoff to the wastewater treatment tank before reusing or discharging into the designated discharge point. Cement application to exposed earth within the site was also observed during the inspection on 13 August 2021, which was being implemented to prevent erosion caused by the precipitation. The temporarily exposed slope and areas were covered by tarpaulin.

7.1.5        No landfill gas exceedance was recorded in the reporting quarter.

7.1.6        No project-related exceedance of the Action Level was recorded during the reporting period.

7.1.7        Weekly environmental site inspection was conducted during the reporting quarter. Minor deficiencies were observed during site inspection and were rectified. The environmental performance of the Project was therefore considered satisfactory.

7.1.8        According to the environmental site inspections performed in the reporting quarter, the Contractor is reminded to pay attention on maintaining site tidiness and proper materials storage. The Contractor is also reminded to consider capacity of water treatment facilities.

7.1.9        No notification of summons or prosecution was received since commencement of the Contract.

7.1.10     The ET will keep track on the construction works to confirm compliance of environmental requirements and the proper implementation of all necessary mitigation measures.

7.1.11     Statistics on complaints and regulatory compliance are summarized in Appendix I.


 

 

 

 

 

 

 

 

 

 

 

Appendix A

 

Overview of Mainlaying in TKO



                                Overview of Mainlaying in TKO


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Appendix B

 

Project Organization Chart

 

 

 


 

 

 

 

 

 

 

 

 

 

 

Appendix C

 

Construction Programme


 




 

 

 

 

 

 

 

 

 

 

 

 

 

 

Appendix D

 

Layout of Major Construction Works Undertaken during the Reporting Quarter


           Figure D1. Location Plan for Portion J - CH.A 0+00 to CH.A 0+78

                 Figure D2a. Location Plan for Portion J - CH.A 5+00 to CH.A 6+70

             Figure D2b. Location Plan for Portion J - CH.A 4+50 to CH.A 6+64

              Figure D3. Location Plan for Portion J - CH.A 12+30 to CH.A 12+50

  Figure D4. Location Plan for Portion J – CH. A13+50 to CH.A 14+00 (Pit A)

 

                 Figure D5. Location Plan for Portion J – CH. A15+50 to CH.A 16+50 (Pit B)

         Figure D6. Location Plan for Portion J – CH.A 19+15 to CH.A 19+50 (Pit C)

 

 

      Figure D7a. Location Plan for Portion J - Mau Wu Tsai 1 (Po Lam South Road 1)

 

     Figure D7b. Location Plan for Portion J - Mau Wu Tsai 2 (Po Lam South Road 2)

 

             Figure D7c. Location Plan for Portion J - Mau Wu Tsai 3 (Po Lam South Road 3)

 

 

                             Figure D8. Location Plan for Portion J - Jaking pit F

 

               Figure D9a: Location Plan for Portion J – Landfill Stage 1 (Area B01-B02)

          Figure D9b: Location Plan for Portion J – Landfill Stage 1 (FC0+50-FC0+92)

     Figure D9c: Location Plan for Portion J – Landfill Stage 1 (FC4+30-FC5+30)

                      Figure D9d. Location Plan – Landfill Stage 1 (Area FC8+38)

                          Figure D10a: Location Plan for Portion J – Pit L-M-N, J1A, K

                                       Figure D10b: Location Plan for Portion J – Pit N-O-P

                                    Figure D10c: Location Plan for Portion J – Pit Q

 

                           Figure D11: Location Plan for Portion J – Po Lam South Road

                                 Figure D12: Location Plan for Portion J – Area A02

 

              Figure D13: Location Plan for Portion J – Abandoned Mau Wu Tsai Road

 

                            Figure D14: Location Plan for Portion J – WPR IP1

 

 

                  Figure D15: Location Plan for Portion J – Jacking Pit D

                 Figure D16: Location Plan for Portion J – CE.HE0+80~1+60

 

                        Figure D17: Location Plan for Portion J – Pit K

 

                     Figure D18a: Location Plan for Portion J – Wan Po Road 4

 

                        Figure D18b: Location Plan for Portion J – Wan Po Road 4

Figure D19. Location Plan for Portion H– CH.C 7+40 (CH.CA 0+00) to CH.C 12+00 (CH.CA 04+25)

                  Figure D20a. Location Plan for Portion H: CH.CT 0+07 – 2+58

 

              Figure D20b. Location Plan for Portion H: CH.CT 2+58 – 2+66


          Figure D21a. Location Plan for Portion H – Pit 137 B

 

Figure D21b. Location Plan for Portion H– Pit 137A

              Figure D21c. Location Plan for Portion H– Pit 137C


 

 

 

 

 

 

 

 

 

 

 

 

 

Appendix E

 

Waste Flow Table


 

 


 

 

 

 

 

 

 

 

 

 

Appendix F

 

Summary of Implementation Status of Environmental Mitigation


 

EIA Reference

Recommended Environmental Protection Measures/ Mitigation Measures

Objectives of the recommended measures & main concerns to address

Implementation Agent

Implementation Stage

Implementation

status

Relevant Legislation & Guidelines

D

C

O

Air Quality

 

S4.8.1

Impervious dust screen or sheeting will be provided to enclose scaffolding from the ground floor level of building for construction of superstructure of the new buildings.

Land site/ During Construction

Contractor(s)

 

✔

 

N/A

Air Pollution Control (Construction Dust)

S4.8.1

Impervious sheet will be provided for skip hoist for material transport.

Land site/ During Construction, particularly dry season

Contractor(s)

 

✔

 

 N/A

 

S4.8.1

The area where dusty work takes place should be sprayed with water or a dust suppression chemical immediately prior to, during and immediately after dusty activities as far as practicable.

Land site/ During Construction

Contractor(s)

 

✔

 

Implemented

 

 

S4.8.1

All dusty materials should be sprayed with water or a dust suppression chemical immediately prior to any loading, unloading or transfer operation.

Land site/ During Construction

Contractor(s)

 

✔

 

Implemented

 

S4.8.1

Dropping heights for excavated materials should be controlled to a practical height to minimise the fugitive dust arising from unloading.

Land site/ During Construction

Contractor(s)

 

✔

 

Implemented

 

S4.8.1

During transportation by truck, materials should not be loaded to a level higher than the side and tail boards, and should be dampened or covered before transport.

Land site/ During Construction

Contractor(s)

 

✔

 

Implemented

 

S4.8.1

Wheel washing device should be provided at the exits of the work sites. Immediately before leaving a construction site, every vehicle shall be washed to remove any dusty material from its body and wheels as far as practicable.

Land site/ During Construction

Contractor(s)

 

✔

 

N/A

 

S4.8.1

Road sections between vehicle-wash areas and vehicular entrance will be paved.

Land site/ During Construction

Contractor(s)

 

✔

 

N/A

 

S4.8.1

Hoarding of not less than 2.4m high from ground level will be provided along the length of the Project Site boundary.

Land site/ During construction

Contractor(s)

✔

✔

 

N/A

 

S4.8.1

Haul roads will be kept clear of dusty materials and will be sprayed with water so as to maintain the entire road surface wet at all times.

Land site/ During construction

Contractor(s)

 

✔

 

Implemented

 

S4.8.1

Temporary stockpiles of dusty materials will be either covered entirely by impervious sheets or sprayed with water to maintain the entire surface wet all the time.

Land site/ During construction

Contractor(s)

 

✔

 

Implemented, rectified after observation

 

S4.8.1

Stockpiles of more than 20 bags of cement, dry pulverised fuel ash and dusty construction materials will be covered entirely by impervious sheeting sheltered on top and 3-sides.

Land site/ During construction

Contractor(s)

 

✔

 

N/A.

 

S4.8.1

All exposed areas will be kept wet always to minimise dust emission.

Land site/ During construction

Contractor(s)

 

✔

 

Implemented

 

S4.8.1

Ultra-low-sulphur diesel (ULSD) will be used for all construction plant on-site, as defined as diesel fuel containing not more than 0.005% sulphur by weight) as stipulated in Environment, Transport and Works Bureau Technical Circular (ETWB-TC(W)) No 19/2005 on Environmental Management on Construction Sites.

Land site/ During construction/ During Operation

Contractor(s)

 

✔

✔

Implemented

Environment, Transport and Works Bureau Technical Circular (ETWB- TC(W)) No 19/2005 on

Environmental Management on Construction Sites

S4.8.1

The engine of the construction equipment during idling will be switched off.

Land site/ During construction

Contractor(s)

 

✔

 

Implemented

 

S4.8.1

Concrete batching plant will be required on site. control measures recommended in the Guidance Note on a Best Practicable Means for Cement Works (Concrete Batching Plant) (BPM 3/2 (93)) will be implemented.  The control measures recommended in the Guidance Note on a Best Practicable Means for Cement Works (Concrete Batching Plant) (BPM 3/2 (93)) will be implemented.

Land site/ During construction

Contractor(s)

 

✔

 

N/A

Guidance Note on a Best

S4.8.1

Regular maintenance of construction equipment deployed on-site will be conducted to prevent black smoke emission.

Land site/ During construction

Contractor(s)

 

✔

 

Implemented

 

S4.10

To ensure proper implementation of the recommended dust mitigation measures and good construction site practices during the construction phase, environmental site audits on weekly basis is recommended throughout the construction period.

Land site/ During construction

Contractor(s)/ Environmental Team (ET) & Independent Environmental Checker (IEC)

 

✔

 

Implemented

 

Note:  D – Design stage  C – Construction  O – Operation


EIA Reference

Recommended Environmental Protection Measures/ Mitigation Measures

Objectives of the recommended measures & main concerns to address

Implementation Agent

Implementation Stage

Implementation

status

Relevant Legislation & Guidelines

D

C

O

Noise

S5.7

Only well-maintained plant will be operated on-site and plant will be serviced regularly during the construction phase.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

A Practical Guide for the Reduction of Noise from Construction Works,

S5.7

Silencers or mufflers on construction equipment will be utilised and will be properly maintained during the construction phase.

Noise control/ During construction

Contractor(s)

 

✔

 

NA

A Practical Guide for the Reduction of Noise from Construction Works,

S5.7

Mobile plant, if any, will be sited as far away from NSRs as possible.

Noise control/ During construction

Contractor(s)

 

✔

 

Implemented

A Practical Guide for the Reduction of Noise from Construction Works,

S5.7

Machines and plant (such as trucks) that may be in intermittent use will be shut down between work periods or will be throttled down to a minimum.

Noise control/ During construction

Contractor(s)

 

✔

 

Implemented

A Practical Guide for the Reduction of Noise from Construction Works,

S5.7

Plants known to emit noise strongly in one direction will, wherever possible, be orientated so that the noise is directed away from the nearby NSRs.

Noise control/ During construction

Contractor(s)

 

✔

 

Implemented

A Practical Guide for the Reduction of Noise from Construction Works,

S5.7

Material stockpiles and other structures will be effectively utilised, wherever practicable, in screening noise from on-site construction activities.

Noise control/ During construction

Contractor(s)

 

✔

 

N/A

A Practical Guide for the Reduction of Noise from Construction Works,

S5.7

Use of Quite Powered Mechanical Equipment (QPME).

Noise control/ During construction

Contractor(s)

 

✔

 

Implemented

A Practical Guide for the Reduction of Noise from Construction Works,

S5.7

Movable noise barriers of 3m in height with skid footing should be used and located within a few metres of stationary plant and mobile plant such that the line of sight to the NSR is blocked by the barriers. The length of the barrier should be at least five times greater than its height. The noise barrier material should have a superficial surface density of at least 7 kg m-2 and have no openings or gaps.

Noise control/ During construction

Contractor(s)

 

✔

 

N/A

A Practical Guide for the Reduction of Noise from Construction Works,

S5.7

The noise insulating sheet should be deployed such that there would be no opening or gaps on the joints.

Noise control/ During construction

Contractor(s)

 

✔

 

N/A

A Practical Guide for the Reduction of Noise from Construction Works,

S5.7

Construction activities (e.g. excavation/shoring, reinstatement (asphalt), and pipe jacking) will be planned and carried out in sequence, such that items of PME proposed for these activities will not be operated simultaneously.

Noise control/ During construction

Contractor(s)

 

✔

 

Implemented

A Practical Guide for the Reduction of Noise from Construction Works

S5.7

PMEs will not be used at the works areas near educational institutions with residual impact (ie the “influence area” within a radius of 40m) during school hours in order to reduce impact to the educational institutions.

Noise control / During construction

Contractor(s)

 

✔

 

Implemented

A Practical Guide for the Reduction of Noise from Construction Works

S5.7

Noise enclosures or acoustic sheds would be used to cover stationary PME such as generators.

Portable/Movable noise enclosure made of material with superficial surface density of at least 7 kg m-2 may be used for screening the noise from operation of the saw/groover, concrete.

Noise control/ Pre- construction/ During construction

Contractor(s)

✔

✔

 

N/A

 

S5.9

Sawcutting pavement, breaking up of pavement, excavation /shoring, pipe laying, backfilling, reinstatement (concrete) and pipe jacking shall be scheduled outside the examination period.

Noise control/ Pre- construction/ During construction

Contractor(s)

✔

✔

 

Implemented

 

S5.9

In view the duration of noise exceedance at Creative Secondary School, PLK Laws Foundation College,  TKO Kei Tak Primary School and School of Continuing and Professional Studies-CUHK is limited to 8 weeks, the construction work in the influence areas near the four schools shall be scheduled during long school holidays (eg summer holiday, Easter holiday or Christmas holiday,

etc) as far as practicable. Scheduling the construction work for the four schools.

Noise control/ Pre- construction/ During construction

Contractor(s)

✔

✔

 

Implemented

 

S5.10

A noise monitoring programme shall be implemented for the construction phase.

Designated monitoring stations as defined in EM&A Manual/During construction phase

Environmental Team (ET)

 

✔

 

Implemented

 

S5.10

The effectiveness of on-site control measures could also be evaluated through the regular site audits.

All facilities/ During construction

Contractor(s)/ Environmental Team (ET) & Independent Environmental Checker (IEC)

 

✔

 

Implemented

-

Note:  D – Design stage  C – Construction  O – Operation


EIA Reference

Recommended Environmental Protection Measures/ Mitigation Measures

Objectives of the recommended measures & main concerns to address

Implementation Agent

Implementation Stage

Implementation

status

Relevant Legislation & Guidelines

D

C

O

Water Quality

S6.9

Dredged marine sediment will be disposed of in a gazetted marine disposal area in accordance with marine dumping permit conditions of the Dumping at Sea Ordinance (DASO).

Marine Dredging/ During construction

Contractor(s)

 

✔

 

N/A

Dumping at Sea Ordinance (DASO)

S6.9

Disposal vessels will be fitted with tight bottom seals in order to prevent leakage of material during transport.

Marine Dredging/ During construction

Contractor(s)

 

✔

 

N/A

-

S6.9

Barges will be filled to a level, which ensures that material does not spill over during transport to the disposal site and that adequate freeboard is maintained to ensure that the decks are not washed by wave action.

Marine Dredging/ During construction

Contractor(s)

 

✔

 

N/A

-

S6.9

After dredging, any excess materials will be cleaned from decks and exposed fittings before the vessel is moved from the dredging area.

Marine Dredging/ During construction

Contractor(s)

 

✔

 

N/A

-

S6.9

All vessels should be well maintained and inspected before use to limit any potential discharges to the marine environment.

Marine Dredging/ During construction

Contractor(s)

 

✔

 

N/A

-

S6.9

All vessels must have a clean ballast system.

Marine Dredging/ During construction

Contractor(s)

 

✔

 

N/A

-

S6.9

No discharge of sewage/grey wastewater should be allowed. Waste water from potentially contaminated area on working vessels should be minimized and collected.   These kinds of wastewater should be brought back to port and discharged at appropriate collection and treatment system.

Marine Dredging/ During construction

Contractor(s)

 

✔

 

N/A

-

S6.9

No soil waste is allowed to be disposed overboard.

Marine Dredging/ During construction

Contractor(s)

 

✔

 

N/A

-

S6.9

Silt removal facilities such as silt traps or  sedimentation facilities will be provided to remove silt particles from runoff to meet the requirements of the TM standard under the WPCO.   The design of silt removal facilities will be based on the guidelines provided in ProPECC PN 1/94.   All drainage facilities and erosion and sediment control structures will be inspected on a regular basis and maintained to confirm proper and efficient operation at all times and particularly during rainstorms.   Deposited silt and grit will be removed regularly.

Land site & drainage/ During construction

Contractor(s)

 

✔

 

Implemented, rectified after observation and reminder

ProPECC PN 1/94 TM

Standard under the WPCO

S6.9

Earthworks to form the final surfaces will be followed up with surface protection and drainage works to prevent erosion caused by rainstorms.

Land site & drainage/ During construction

Contractor(s)

 

✔

 

Implemented

 

-

S6.9

Appropriate surface drainage will be designed and provided where necessary.

Land site & drainage/ During construction

Contractor(s)

 

✔

 

Implemented

 

-

S6.9

The precautions to be taken at any time of year when rainstorms are likely together with the actions to be taken when a rainstorm is imminent or forecasted and actions to be taken during or after rainstorms are summarised in Appendix A2 of ProPECC PN 1/94.

Land site & drainage/ During construction

Contractor(s)

 

✔

 

Implemented

ProPECC PN 1/94

S6.9

Oil interceptors will be provided in the drainage system where necessary and regularly emptied to prevent the release of oil and grease into the storm water drainage system after accidental spillages.

Land site & drainage/ During construction

Contractor(s)

 

✔

 

 N/A

-

S6.9

Temporary and permanent drainage pipes and culverts provided to facilitate runoff discharge, if any, will be adequately designed for the controlled release of storm flows.

Land site & drainage/ During construction

Contractor(s)

 

✔

 

N/A

-

S6.9

The temporary diverted drainage, if any, will be reinstated to the original condition when the construction work has finished or when the temporary diversion is no longer required.

Land site & drainage/ During construction

Contractor(s)

 

✔

 

N/A

-

S6.9

Appropriate numbers of portable toilets shall be provided by a licensed contractor to serve the construction workers over the construction site to prevent direct disposal of sewage into the water environment.

Land site & drainage/ During construction

Contractor(s)

 

✔

 

Implemented

-

S6.9 and S6.12

The sterilization water should be dechlorinated with total residual chlorine (TRC) level below 1 mg/L before discharge to public sewer. In situ testing of TRC should also be conducted for the discharge of chlorinated water for pipeline disinfection to ensure sufficient dechlorination before discharge to public sewer.

Sterilization of water mains prior to commissioning

Contractor(s)

 

✔

✔

N/A

Technical Memorandum for Effluents Discharged into Drainage and Sewerage Systems Inland and Coastal Waters

S6.9

The cleaning and flushing water should also be treated and desilted to the relevant discharge requirement stipulated in TM-DSS before discharging.

Sterilization of water mains prior to commissioning

Contractor(s)

 

✔

✔

N/A

Technical Memorandum for Effluents Discharged into Drainage and Sewerage Systems Inland and Coastal Waters

S6.9

Site drainage should be well maintained and good construction practices should be observed to ensure that oil, fuels, solvents and other chemicals are managed, stored and handled properly and do not enter the nearby water streams.

Land site & drainage/ During construction/ During operation

Contractor(s)

 

✔

✔

Implemented,

rectified after observation

-

S6.12

Regular site inspections will be carried out in order to confirm that regulatory requirements are being met and that contractors are implementing the standard site practice and mitigation measures as proposed to reduce potential impacts to water quality.

During construction

Contractor(s)/ Environmental Team (ET) & Independent Environmental Checker (IEC)

 

✔

 

Implemented

-

Note:  D – Design stage  C – Construction  O – Operation


EIA Reference

Recommended Environmental Protection Measures/ Mitigation Measures

Objectives of the recommended measures & main concerns to address

Implementation Agent

Implementation Stage

Implementation Status

Relevant Legislation & Guidelines

D

C

O

Waste Management

S8.5

Nomination of approved personnel to be responsible for standard site practices, arrangements for collection and effective disposal to an appropriate facility of all wastes generated at the site.

Contract mobilisation/ During construction

Contractor(s)

 

✔

 

Implemented

-

S8.5

Training of site personnel in proper waste management and chemical handling procedures. Training will be provided to workers on the concepts of site cleanliness and appropriate waste management procedures, including waste reduction, reuse and recycling at the beginning of the construction works.

Contract mobilisation/ During construction

Contractor(s)

 

✔

 

Implemented

-

S8.5

Provision of sufficient waste disposal points and regular collection for disposal.

All area/ During construction/ During operation

Contractor(s)

 

✔

✔

Implemented, reminder issued

DEVB TC(W) No. 8/2010, Enhanced Specification for Site Cleanliness and Tidiness.

S8.5

Appropriate measures to reduce windblown litter and dust transportation of waste by either covering trucks or by transporting wastes in enclosed containers.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

DEVB TC(W) No. 8/2010,

Enhanced Specification for Site Cleanliness and Tidiness.

S8.5

A waste management plan (WMP) as stated in the “ETWB TC(W) No. 19/2005, Environmental Management on Construction Sites”   for the amount of waste generated, recycled and disposed of (including the disposal sites) will be established and implemented during the construction phase as part of the Environmental Management Plan (EMP).   The Contractor will be required to prepare the EMP and submits it to the Architect/ Engineer under the Contract for approval prior to implementation.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

ETWB TC(W) No. 19/2005,

Environmental Management on Construction Sites

S8.5

Separation of chemical wastes for special handling and appropriate treatment at the Chemical Waste Treatment Centre at Tsing Yi.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

Chapters 2 & 3 Code of Practice on the Packaging, Labelling & Storage of Chemical Wastes published under the Waste Disposal Ordinance (Cap 354),

Section 35

S8.5

Regular cleaning and maintenance programme for drainage systems, sumps and oil interceptors.

Land site/ During construction

Contractor(s)

 

✔

 

Implemented, rectified after observation. Renubder issued.

Waste Disposal Ordinance (Cap 354)

S8.5

A recording system for the amount of wastes generated/ recycled and disposal sites.   The trip- ticket system will be included as one of the contractual requirements and implemented by the contractor(s).

Land site/ During construction

Contractor(s)

 

✔

 

Implemented

DEVB TC(W) No. 6/2010,

Trip Ticket System for Disposal of Construction & Demolition Materials

S8.5

Segregation and storage of different types of waste in different containers, skips or stockpiles to enhance reuse or recycling of material and their proper disposal.

Land site/ During construction/ During operation

Contractor(s)

 

✔

 

Implemented

WBTC 32/92, The Use of Tropical Hard Wood on Construction Site

S8.5

Encourage collection of aluminium cans and waste paper by individual collectors during construction with separate labelled bins provided to segregate these wastes from other general refuse by the workforce.

Land site/ During construction

Contractor(s)

 

✔

 

Implemented

ETWB TCW No. 33/2002,

Management of Construction and Demolition Material Including Rock

S8.5

Any unused chemicals and those with remaining functional capacity will be recycled as far as possible.

Land site/ During construction

Contractor(s)

 

✔

 

N/A

-

S8.5

Use of reusable non-timber formwork to reduce the amount of C&D materials.

All areas/ During construction

Contractor(s)

 

✔

 

N/A

WBTC 32/92, The Use of Tropical Hard Wood on Construction Site

S8.5

Prior to disposal of construction waste, wood, steel and other metals will be separated to the extent practical, for re-use and/or recycling to reduce the quantity of waste to be disposed of to landfill.

All areas/ During construction

Contractor(s)

 

✔

 

Implemented

DEVB TC(W) No. 6/2010,

Trip Ticket System for Disposal of Construction & Demolition Materials

S8.5

Proper storage and site practices to reduce the potential for damage or contamination of construction materials.

All areas/ During construction

Contractor(s)

 

✔

 

Implemented,

rectified after observation

-

S8.5

Plan and stock construction materials carefully to reduce amount of waste generated and avoid unnecessary generation of waste.

All areas/ During construction

Contractor(s)

 

✔

 

Implemented

-

S8.5

A Sediment Quality Report (SQR) for sampling and chemical testing of the sediment will be prepared and submitted to the EPD for approval.   The approved detailed sampling and chemical testing will be carried out prior to the commencement of the dredging activities to confirm the sediment disposal method.

Marine works/ During construction

Contractor(s)

 

✔

 

N/A

ETWB TC(W) No. 34/2002

and Dumping at Sea Ordinance (DASO)

S8.5

The management of dredged/ excavated sediment management requirement from ETWB TC(W) No. 34/2002 will be incorporated in the Specification of the Contract Documents.

Marine works/ During construction

WSD/ Contractor(s)

 

✔

 

I mplemented

ETWB TC(W) No. 34/2002 and Dumping at Sea Ordinance (DASO)

S8.5

The contractor will open a billing account with EPD in accordance with the Waste Disposal (Charges for Disposal of Construction Waste) Regulation for the payment of disposal charges.

Contract mobilisation/ During construction

Contractor(s)

 

✔

 

Implemented

Cap 354N Waste Disposal (Charges for Disposal of Construction Waste) Regulation

S8.5

A trip-ticket system will be established in accordance with DEVB TC(W) No. 6/2010 to monitor the reuse of surplus excavated materials off-site and disposal of construction waste and general refuse at transfer facilities/ landfills, and to control fly-tipping.

Contract mobilisation/ During construction

Contractor(s)

 

✔

 

Implemented

DEVB TC(W) No. 6/2010,

Trip Ticket System for Disposal of Construction & Demolition Materials

S8.5

The project proponent will also conduct regular inspection of the waste management measures implemented on site as described in the Waste Management Plan.

All area/ During construction

Contractor(s)/ Environmental Team (ET) & Independent Environmental Checker (IEC)

 

✔

 

Implemented

ETWB TC(W) No. 19/2005,

Environmental Management on Construction Sites

S8.5

A recording system (similar to summary table as shown in Annex 5 and Annex 6 of Appendix G of ETWB TC(W) No. 19/2005) for the amount of waste generated, recycled and disposed of (including the disposal sites) will be established during the construction phase.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

Annex 5 and Annex 6 of Appendix G of ETWB TC(W) No. 19/2005

S8.5

Inert C&D materials (public fill) will be reused within the Project as far as practicable.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

-

S8.5

Public fill and construction waste shall be segregated and stored in different containers or skips to facilitate reuse or recycling of materials and their proper disposal.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

-

S8.5

Specific areas of the work site will be designated for such segregation and storage if immediate use is not practicable.

All area/ During construction

Contractor(s)

 

✔

 

 Implemented

-

S8.5

To reduce the potential dust and water quality impacts of site formation works, C&D materials will be wetted as quickly as possible to the extent practice after filling.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

Air Pollution Control (Construction Dust) Regulation (Cap 311R); WPCO (Cap 358)

S8.5

Open stockpiles of excavated/ fill materials or construction wastes on-site should be covered with tarpaulin or similar fabric.

Land site/ During Construction, particularly dry season

Contractor(s)

 

✔

 

Implemented,rectified after observation

Air Pollution Control (Construction Dust) Regulation (Cap 311R)

S8.5

Chemical waste container shall be suitable for the substance they are holding, resistant to corrosion, maintained in a good condition, and securely closed.

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

Waste Disposal (Chemical Waste) (General) Regulation; Code of Practice on the Packaging, Handling and Storage of Chemical Wastes

S8.5

Chemical waste container shall have a capacity of less than 450 L unless the specifications have been approved by the EPD.

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

Waste Disposal (Chemical Waste) (General) Regulation; Code of Practice on the Packaging, Handling and Storage of Chemical Wastes

S8.5

A label in English and Chinese shall be displayed on the chemical container in accordance with instructions prescribed in Schedule 2 of the Regulations.

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

Waste Disposal (Chemical Waste) (General) Regulation; Code of Practice on the Packaging, Handling and Storage of Chemical Wastes

S8.5

Storage areas for chemical waste shall be enclosed on at least 3 sides.

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

Waste Disposal (Chemical Waste) (General) Regulation; Code of Practice on the Packaging, Handling and Storage of Chemical Wastes

S8.5

Storage areas for chemical waste shall have an impermeable floor and bunding, of capacity to accommodate 110% of the volume of the largest container or 20% by volume of the chemical waste stored in that area, whichever is the greatest.

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

Waste Disposal (Chemical Waste) (General) Regulation; Code of Practice on the Packaging, Handling and Storage of Chemical Wastes

S8.5

Storage areas for chemical waste shall have adequate ventilation.

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

Waste Disposal (Chemical Waste) (General) Regulation; Code of Practice on the Packaging, Handling and Storage of Chemical Wastes

S8.5

Storage areas for chemical waste shall be covered to prevent rainfall entering (water collected within the bund must be tested and disposed of as chemical waste, if necessary).

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

Waste Disposal (Chemical Waste) (General) Regulation; Code of Practice on the Packaging, Handling and Storage of Chemical Wastes

S8.5

Storage areas for chemical waste shall be arranged so that incompatible materials are appropriately separated.

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

Waste Disposal (Chemical Waste) (General) Regulation; Code of Practice on the Packaging, Handling and Storage of Chemical Wastes

S8.5

General refuse will be stored in enclosed bins or compaction units separately from construction and chemical wastes.

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

Waste Disposal (Chemical Waste) (General) Regulation; Code of Practice on the Packaging, Handling and Storage of Chemical Wastes

S8.5

Adequate number of waste containers will be provided to avoid over-spillage of waste.

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

DEVB TC(W) No. 8/2010

Enhanced Specification for Site Cleanliness and Tidiness.

S8.5

A reputable waste collector will be employed by the Contractor to remove general refuse from the site, separately from construction and chemical wastes, on a daily basis to minimise odour, pest and litter impacts.

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

-

S8.5

Recycling bins will be provided at strategic locations within the Site to facilitate recovery of recyclable materials (including aluminium can, waste paper, glass bottles and plastic bottles) from the Site.

Materials recovered will be sold for recycling.

All area/ During construction/ During operation

Contractor(s)/ WSD

 

✔

✔

Implemented

-

S8.5

To avoid any odour and litter impact, accurate number of portable toilets will be provided for workers on-site.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

-

S8.5

The burning of refuse on construction sites is prohibited by law.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

Air Pollution Control Ordinance (Cap 311)

S8.7

To facilitate monitoring and control over the contractors’ performance on waste management, a waste inspection and audit programme will be implemented throughout the construction phase.

All facilities/ During construction

ET/ IEC

 

✔

 

Implemented

-

Note:  D – Design stage  C – Construction  O – Operation


EIA Reference

Recommended Environmental Protection Measures/ Mitigation Measures

Objectives of the recommended measures & main concerns to address

Implementation Agent

Implementation Stage

Implementation Status

Relevant Legislation & Guidelines

D

C

O

 

Ecology

S9.7

For slope mitigation works within the Clear Water Bay Country Park, to avoid tree felling and damages to trees, the exact locations of the flexible barrier foundation plates, soil nails and rock dowels can be adjusted during detailed design, and a setback distance from existing trees is recommended to be maintained as far as practical.   A detailed specification describing the exact locations of the flexible barrier foundation plates, soil nails and rock dowels will be prepared to illustrate how the setback distance from existing trees would be implemented for tree avoidance.

Slope mitigation works area/ During detailed design/ During construction

Contractor(s)

✔

✔

 

Implemented

-

S9.7

Pruning of tree canopies along the alignment of the flexible barriers shall be limited to a minimum.

Slope mitigation works area/ During construction

Contractor(s)

 

✔

 

Implemented

 

S9.7

The alignment of flexible barriers shall be optimized to preserve all species of conservation interest and minimize the impact to the existing vegetation as far as practicable.   All individuals of Marsdenia lachnostoma within the slope mitigation areas shall be retained in- situ, by positioning the alignment of flexible barrier at a minimum 1.5m in a radius away from these individuals.

Slope mitigation works area/ During detailed design/ During construction

Contractor(s)

✔

✔

 

N/A

-

S9.7 and 9.10

At the detailed design stage prior to the commencement of the slope mitigation works, a vegetation survey shall be carried out at the slope mitigation areas within the Clear Water Bay Country Park to assess the condition and identify the location of each individual of Marsdenia lachnostoma and other flora species of conservation interest that may be directly affected by the construction works.

Slope mitigation works area/ During detailed design/ During construction

Contractor(s)

✔

✔

 

Implemented

-

S9.7

Temporary fencing will be installed to fence off the concerned species either in groups of individually within the works area and in the close proximity to prevent from being damaged and disturbed during construction. A sign identifying the site shall be attached to the fence and flagging tape shall be attached to the individuals to visualize their locations.

Slope mitigation works area/ During construction

Contractor(s)

 

✔

 

N/A

-

S9.7 and S9.10

A specification for fencing and demarcating individuals of Marsdenai lachnostoma (or other flora species of conservation interest, if found) adjacent to the proposed alignment of the flexible barriers will be prepared to protect the species.

Slope mitigation works area/ During construction

Contractor(s)

 

✔

 

N/A

-

S9.7

Induction training shall also be provided to all site personnel in order to brief them on this flora of conservation interest including the locations and their importance.

Slope mitigation works area/ During construction

Contractor(s)

 

✔

 

N/A

-

S9.7

The resident site supervisory staff will closely monitor the conditions of concerned individuals during construction of flexible barriers in the close proximity.

Slope mitigation works area/ During construction

Contractor(s)

 

✔

 

 N/A

-

S9.7

Erect fences along the boundary of the works area before the commencement of works to prevent vehicle movements and encroachment of personnel onto adjacent areas.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

-

S9.7

Regularly check the work site boundaries to ensure that they are not breached and that damage does not occur to surrounding areas.

All area/ During construction

Contractor(s)/ Environmental Team (ET)

 

✔

 

Implemented

-

S9.7

Avoid any damage and disturbance, particularly those caused by filling and illegal dumping, to the surrounding habitats through proper management of waste disposal.

All area/ During construction

Contractor(s)

 

✔

 

Implemented

-

S9.7

Reinstate temporarily affected areas, particularly the habitats of plantation and shrubland-grassland immediately after completion of construction works, through on-site tree/shrub planting. The tree/shrub species will be chosen with reference to those in the surrounding area.

All area/ During construction

Contractor(s)

 

✔

 

N/A

-

S9.7

Affected habitats within the Clear Water Bay Country Bay shall be reinstated by hydro-seeding and planting of climbers and native shrub seedlings where practical upon completion of the slope mitigation works.

All area/ During construction

Contractor(s)

 

✔

 

N/A

-

Note:  D – Design stage  C – Construction  O – Operation


EIA Reference

Recommended Environmental Protection Measures/ Mitigation Measures

Objectives of the recommended measures & main concerns to address

Implementation Agent

Implementation Stage

Implementation Status

Relevant Legislation & Guidelines

D

C

O

Landscape & Visual

S11.10 & 11.11

The construction area and area allowed for temporary structures, such as the contractor’s office, will be minimized to a practical minimum.   (MM1)

All area/ Detailed design/ During construction/ During operation

WSD/ Contractor(s)

✔

✔

✔

Implemented

-

S11.10 & 11.11

At the detailed design stage, the design team will seek to minimize the landscape footprint of the Project and above ground facilities, while satisfying all other requirements. (MM2)

All area/ Detailed design/ During construction/ During operation

WSD/ Contractor(s)

✔

✔

✔

Implemented

-

S11.10 & 11.11

Design principles will be adopted to take into account the surrounding area, particularly Clear Water Bay Country Park behind and the nearby waterfront, with due consideration given to:

-  green roofs where practical (ie without equipment on the roof);

-  roadside planting;

-  aesthetic treatment of all structures;

-  vertical greening;

screen planting along application site; and

- landscape enhancement with amenity planting where practical including planting along the edge (site boundary) fence with native shrubs where feasible,

-  to reduce their visual impact and blend them into the surrounding landscape.   (MM3)

All area/ Detailed design/ During construction/ During operation

WSD/ Contractor(s)

✔

✔

✔

Implemented

-

S11.10 & 11.11

All trees within the Project Site or the potential slope mitigation works area will be carefully protected during construction according to DEVB TCW No.

10/2013 – Tree Preservation (MM4)

All area/ Detailed design/ During construction/ During operation

WSD/ Contractor(s)

✔

✔

✔

Implemented.

ETWB TCW No. 3/2006 -

Tree Preservation.

S11.10 & 11.11

No tree within the Country Park will be felled.    Trees within the Site unavoidably affected by the works will be transplanted where necessary and practical.   For trees that need to be felled, compensatory planting will be provided to the satisfaction of relevant Government departments.

A compensatory tree planting proposal including locations of tree compensation will be submitted to seek relevant government department’s approval, in accordance with DEVB TC(W) No. 10/2013.   (MM5)

All area/ Detailed design/ During construction/ During operation

WSD/ Contractor(s)

✔

✔

✔

Implemented

DEVB TC(W) No. 10/2013

S11.10 & 11.11

Any slope mitigation works necessary to address natural terrain hazards, will be minimized to minimize any potential environmental impact to the Country Park e.g. soil nailing and rock stabilization will aim to avoid existing trees e.g. should any restoration of vegetation be necessary, the best planting matrix with native species will be established, with the aim of resembling the existing vegetation.                        (MM6)

All area/ Detailed design/ During construction/ During operation

WSD/ Contractor(s)

✔

✔

✔

N/A

 

S11.10 & 11.11

Dredging works for the installation of intake structures and outfall diffusers should be minimized to avoid or reduce any potential environmental impacts to as low as reasonably practicable (ALARP). The intake and outfall structures (e.g. intake openings and diffuser heads) will be prefabricated and transferred to site for installation.   (MM7)

All area/ Detailed design/ During construction/ During operation

WSD/ Contractor(s)

✔

✔

✔

N/A

 

S11.10 & 11.11

All night-time lighting will be reduced to a practical minimum both in terms of number of level and will be hooded and directional. (MM8) units and lux level and will be hooded and directional. (MM8)

All area/ Detailed design/ During construction/ During operation

WSD/ Contractor(s)

✔

✔

✔

Implemented

-

Note:  D – Design stage  C – Construction  O – Operation


EIA Reference

Recommended Environmental Protection Measures/ Mitigation Measures

Objectives of the recommended measures & main concerns to address

Implementation Agent

Implementation Stage

Implementation Status

Relevant Legislation & Guidelines

D

C

O

 

Landfill Gas Hazard

S12.7

During all works, safety procedures should be implemented to minimise the risks of fires and explosions, asphyxiation of workers and toxicity effects resulting from contact with contaminated soil and groundwater.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

Implemented

-

S12.7

During trenching and excavation as well as creation of confined spaces at near to or below ground level, precautions should be clearly laid down and rigidly Gas detection equipment and appropriate breathing apparatus should be available and used when entering confined spaces or trenches deeper than 1 metre.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

Implemented

 

S12.7

The Contractor should make the workers are aware of potential hazards of working in confined spaces (any chamber, manhole or culvert which is large enough to permit access to personnel).   Such work in confined spaces is controlled by the Factories and Industrial Undertakings (Confined Spaces) Regulations of the Factories and Industrial Undertakings Ordinance.

Following the Safety Guide to Working in Confined Spaces ensures compliance with the above regulations.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

Implemented

 

S12.7

Safety officers, specifically trained with regard to landfill gas and leachate related hazards and the appropriate actions to take in adverse circumstances, should be present on the site throughout the works, in particular, when works are undertaken below grade.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

Implemented

 

S12.7

All personnel who work on site and all visitors to the site should be made aware of the possibility of ignition of gas in the vicinity of the works, the possible presence of contaminated water and the need to avoid physical contact with it.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

Implemented

 

S12.7

Monitoring for landfill gas should be undertaken in all excavations, manholes, chambers (particularly during pipe jacking) and any confined spaces through the use of an intrinsically safe portable instrument, appropriately calibrated and capable of measuring the concentrations of methane. carbon dioxide and oxygen.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

Implemented

 

S12.7

Monitoring frequency and areas to be monitored should be specified prior to commencement of groundwork, either by the Safety Officer, or by an appropriately qualified person.   All measurements should be recorded and documented.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

Implemented

 

S12.7

Proceed drilling with adequate care and precautions against the potential hazards which may be encountered.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

Implemented

 

S12.7

Prior to the commencement of the site works, the drilling contractor should devise a 'method-of- working' statement covering all normal and emergency procedures (including but not limited to number of operatives, experience and special skills of operatives, normal method of operations, emergency procedures, supervisors responsibilities, storage and use of safety equipment, safety procedures and signs, barriers and guarding).   The site supervisor and all operatives must be familiar with this statement.

All area/ During construction/ During operation

Contractor(s)

✔

✔

✔

Implemented

 

S12.7

Where below ground service entries are necessary to the Incoming Switchgear Room, 132 kV Substation and Chlorine Store (I) and (II), the entry point should be sealed to prevent gas entry.   In addition, any below grade cable trenches entering the Incoming Switchgear Room and 132 kV Substation can become the pathway for landfill gas and hence grilled metal covers should be used.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

N/A

 

S12.7

It is recommended regular landfill gas monitoring should be carried out at the Incoming Switchgear Room, 132 kV Substation and Chlorine Store (I) and (II). The monitoring frequency will be monthly for the first year of operation. If the monitoring results show no sign of landfill gas migration, reduce the monitoring frequency to once every six months.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

N/A

 

S12.7

The manholes and utility pits within the Project Site and along the fresh water mains. Each manhole/ utility pit should be monitored with two measurements (at mid depth and base). Each measurement should be monitored for a minimum of 10 minutes. A steady reading and peak reading should be recorded at each manhole/ utility pit and for each measurement.   The need for venting the manhole/ utility pit and further monitoring will be reviewed after the initial monitoring.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

Implemented

 

S12.7

All construction, operation and maintenance personnel working on-site as well as visitors should be made aware of the hazards of landfill gas and its possible presence on-site. This should be achieved through a combination of posting warning signs in prominent places and also by access to detailed information on landfill gas hazards and the designs and procedural means by which these hazards are being minimised

on-site.

All area/ Detailed design/ During construction/ During operation

Contractor(s)

✔

✔

✔

Implemented

 

Note:  D – Design stage  C – Construction  O – Operation


 

 

 

 

 

 

 

 

 

 

 

Appendix G

 

Action and Limit Level for Noise and Landfill Gas


 

Action/ Limit Level for Noise Monitoring

 

Time Period

Action

Limit (dB(A))

0700-1900 on normal weekdays

When one documented complaint is received from any one of the noise sensitive receivers

·        70 dB(A) for school and

·        65 dB(A) during examination period

Notes:

(a)   Limits specified in the GW-TM and IND-TM for construction and operation noise, respectively.

 


 

Action Level for Landfill Gas Monitoring Equipment


 

 

 

 

 

 

 

 

 

 

 

 

 

Appendix H

 

Landfill Gas Monitoring Results

 

 

 

 

 

 

 

 

 

 


Date of Measurement

Sampling Location

Depth
(m)

Sampling time

Weather Condition

Balance Gas(%)

Flammable gas
(methane%)

Carbon Monoxide (%)

Oxygen
(%)

Temp (C)

Pressure
(m bar)

Measurement Equipment

Remarks

3/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

24

1014

PGM-2500P (QRAE III)

 

3/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

23

1011

PGM-2500P (QRAE III)

 

3/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

23

1011

PGM-2500P (QRAE III)

 

3/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

24

1012

PGM-2500P (QRAE III)

 

3/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

24

1012

PGM-2500P (QRAE III)

 

3/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

24

1012

PGM-2500P (QRAE III)

 

3/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

24

1011

PGM-2500P (QRAE III)

 

3/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

24

1011

PGM-2500P (QRAE III)

 

3/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

24

1011

PGM-2500P (QRAE III)

 

3/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

24

1011

PGM-2500P (QRAE III)

 

3/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

23

1011

PGM-2500P (QRAE III)

 

3/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

23

1011

PGM-2500P (QRAE III)

 

3/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

23

1014

PGM-2500P (QRAE III)

 

3/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

23

1011

PGM-2500P (QRAE III)

 

3/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

23

1013

PGM-2500P (QRAE III)

 

3/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

23

1011

PGM-2500P (QRAE III)

 

3/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

23

1013

PGM-2500P (QRAE III)

 

3/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

23

1011

PGM-2500P (QRAE III)

 

4/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

25

1012

PGM-2500P (QRAE III)

 

4/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

4/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

4/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

25

1012

PGM-2500P (QRAE III)

 

4/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

4/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

4/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

26

1011

PGM-2500P (QRAE III)

 

4/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

4/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

26

1011

PGM-2500P (QRAE III)

 

4/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

4/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

26

1011

PGM-2500P (QRAE III)

 

4/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

4/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

26

1011

PGM-2500P (QRAE III)

 

4/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

4/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

27

1011

PGM-2500P (QRAE III)

 

4/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

4/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

27

1011

PGM-2500P (QRAE III)

 

4/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

4/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

27

1011

PGM-2500P (QRAE III)

 

4/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

4/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

4/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

4/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

4/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

4/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

4/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

4/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

4/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

4/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

4/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

5/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

27

1014

PGM-2500P (QRAE III)

 

5/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1012

PGM-2500P (QRAE III)

 

5/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

5/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

27

1014

PGM-2500P (QRAE III)

 

5/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1012

PGM-2500P (QRAE III)

 

5/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

5/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

27

1013

PGM-2500P (QRAE III)

 

5/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

30

1012

PGM-2500P (QRAE III)

 

5/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

27

1013

PGM-2500P (QRAE III)

 

5/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

30

1012

PGM-2500P (QRAE III)

 

5/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

27

1013

PGM-2500P (QRAE III)

 

5/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

5/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

27

1013

PGM-2500P (QRAE III)

 

5/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

5/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

27

1013

PGM-2500P (QRAE III)

 

5/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

5/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

28

1013

PGM-2500P (QRAE III)

 

5/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

5/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

28

1013

PGM-2500P (QRAE III)

 

5/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

5/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

28

1013

PGM-2500P (QRAE III)

 

5/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

5/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

28

1013

PGM-2500P (QRAE III)

 

5/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

5/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

28

1013

PGM-2500P (QRAE III)

 

5/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

5/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

5/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

5/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

5/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

6/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

23

1018

PGM-2500P (QRAE III)

 

6/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

27

1018

PGM-2500P (QRAE III)

 

6/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

25

1013

PGM-2500P (QRAE III)

 

6/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

23

1018

PGM-2500P (QRAE III)

 

6/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

27

1018

PGM-2500P (QRAE III)

 

6/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

25

1013

PGM-2500P (QRAE III)

 

6/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

23

1018

PGM-2500P (QRAE III)

 

6/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

27

1015

PGM-2500P (QRAE III)

 

6/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

23

1018

PGM-2500P (QRAE III)

 

6/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

27

1015

PGM-2500P (QRAE III)

 

6/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

23

1018

PGM-2500P (QRAE III)

 

6/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

26

1014

PGM-2500P (QRAE III)

 

6/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

24

1018

PGM-2500P (QRAE III)

 

6/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

26

1014

PGM-2500P (QRAE III)

 

6/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

24

1018

PGM-2500P (QRAE III)

 

6/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

26

1014

PGM-2500P (QRAE III)

 

6/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

24

1018

PGM-2500P (QRAE III)

 

6/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

26

1014

PGM-2500P (QRAE III)

 

6/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

24

1018

PGM-2500P (QRAE III)

 

6/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

26

1014

PGM-2500P (QRAE III)

 

6/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

24

1018

PGM-2500P (QRAE III)

 

6/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

26

1014

PGM-2500P (QRAE III)

 

6/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

25

1018

PGM-2500P (QRAE III)

 

6/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

25

1014

PGM-2500P (QRAE III)

 

6/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

25

1018

PGM-2500P (QRAE III)

 

6/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

25

1014

PGM-2500P (QRAE III)

 

6/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

25

1018

PGM-2500P (QRAE III)

 

6/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

25

1014

PGM-2500P (QRAE III)

 

6/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

25

1018

PGM-2500P (QRAE III)

 

6/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

25

1014

PGM-2500P (QRAE III)

 

7/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

27

1016

PGM-2500P (QRAE III)

 

7/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

28

1013

PGM-2500P (QRAE III)

 

7/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

7/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

27

1016

PGM-2500P (QRAE III)

 

7/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

28

1013

PGM-2500P (QRAE III)

 

7/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

7/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

27

1015

PGM-2500P (QRAE III)

 

7/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

28

1013

PGM-2500P (QRAE III)

 

7/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

27

1015

PGM-2500P (QRAE III)

 

7/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

28

1013

PGM-2500P (QRAE III)

 

7/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

27

1015

PGM-2500P (QRAE III)

 

7/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

7/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

27

1015

PGM-2500P (QRAE III)

 

7/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

7/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

27

1015

PGM-2500P (QRAE III)

 

7/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

7/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

27

1016

PGM-2500P (QRAE III)

 

7/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

7/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

27

1016

PGM-2500P (QRAE III)

 

7/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

7/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

27

1016

PGM-2500P (QRAE III)

 

7/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

7/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

28

1015

PGM-2500P (QRAE III)

 

7/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

7/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

28

1015

PGM-2500P (QRAE III)

 

7/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

7/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

28

1015

PGM-2500P (QRAE III)

 

7/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

7/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

28

1015

PGM-2500P (QRAE III)

 

7/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

8/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

26

1012

PGM-2500P (QRAE III)

 

8/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

8/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

8/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

26

1012

PGM-2500P (QRAE III)

 

8/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

8/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

8/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

27

1012

PGM-2500P (QRAE III)

 

8/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

8/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

27

1012

PGM-2500P (QRAE III)

 

8/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

8/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

27

1012

PGM-2500P (QRAE III)

 

8/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

8/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

8/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

8/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

8/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

8/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

8/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

8/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

8/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

8/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

8/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

8/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

8/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

8/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

8/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

8/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

8/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

8/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

8/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

10/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

10/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

10/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

10/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

10/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

10/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

10/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

10/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

10/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

10/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

10/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

10/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

10/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

10/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

10/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

10/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

10/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

28

1011

PGM-2500P (QRAE III)

 

10/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

10/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

10/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

10/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

10/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

10/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

10/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

10/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

10/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

10/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

10/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

11/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

11/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

11/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

11/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

11/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

11/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

11/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

11/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

11/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

11/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

11/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

11/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

11/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

11/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

11/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

11/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

11/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

11/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

11/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

11/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

11/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

11/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

11/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

11/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

11/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

3

1010

PGM-2500P (QRAE III)

 

11/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

11/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

11/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

12/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1009

PGM-2500P (QRAE III)

 

12/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

12/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

12/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

12/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

12/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

12/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

12/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

12/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

12/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

12/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

12/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

12/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

12/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

12/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

12/5/2021

WPR1

1.5

10:15

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

12/5/2021

WPR1

1.5

15:15

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

12/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

12/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

12/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

12/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

12/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

12/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

12/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

12/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

12/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

12/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

13/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

13/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

13/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

13/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

13/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

13/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

13/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

27

1010

PGM-2500P (QRAE III)

 

13/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

13/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

13/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

13/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

13/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

13/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

13/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

13/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

13/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

13/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

13/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

13/5/2021

WPR1

1.5

10:15

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

13/5/2021

WPR1

1.5

15:15

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

13/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

13/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

13/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

13/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

13/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

13/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

13/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

13/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

13/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

13/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

14/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

14/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

14/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

14/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

14/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

14/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

14/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

14/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

14/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

14/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

14/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

14/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

14/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

14/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

14/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

14/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

14/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

14/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

14/5/2021

WPR1

1.5

10:15

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

14/5/2021

WPR1

1.5

15:15

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

14/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

14/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

14/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

14/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

14/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

14/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

14/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

14/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

14/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

14/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

15/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

15/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

15/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

15/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

15/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

15/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

15/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

15/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

15/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

15/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

15/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

15/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

15/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

15/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

15/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

15/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

15/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

15/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

15/5/2021

WPR1

0.6

10:15

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

15/5/2021

WPR1

0.6

15:15

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

15/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

15/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

15/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

15/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

15/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

15/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

15/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

15/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

15/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

15/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

17/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

17/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

33

1011

PGM-2500P (QRAE III)

 

17/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

17/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

17/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

17/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

17/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

17/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

17/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

17/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

17/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

17/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

17/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

17/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

17/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

17/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

17/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

17/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

17/5/2021

WPR1

0.6

10:15

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

17/5/2021

WPR1

0.6

15:15

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

17/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

17/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

17/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

17/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

17/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

17/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

17/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

17/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

17/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

17/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

18/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

18/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

18/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

18/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

18/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

18/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

18/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

18/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

18/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

18/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

18/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

18/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

18/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

18/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

18/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

18/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

18/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

18/5/2021

WPR1

0.6

10:15

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

18/5/2021

WPR1

0.6

15:15

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

18/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

18/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

18/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

18/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

18/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

18/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

18/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1010

PGM-2500P (QRAE III)

 

18/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

20/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

20/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

20/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

20/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

20/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

20/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

20/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

20/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

20/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

20/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

20/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

20/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

20/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

20/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

20/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

20/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

20/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

20/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

20/5/2021

WPR1

0.6

10:15

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

20/5/2021

WPR1

0.6

15:15

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

20/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

20/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

20/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

20/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

20/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

20/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

20/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

20/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

20/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

20/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

21/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

21/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

21/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

21/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

21/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

21/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

21/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

21/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

21/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

21/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

21/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

21/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

21/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

21/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

21/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

21/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

21/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

21/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

21/5/2021

WPR1

0.6

10:15

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

21/5/2021

WPR1

0.6

15:15

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

21/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

21/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

21/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

21/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

21/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

21/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

21/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

21/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

21/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

21/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

22/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

22/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

22/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

22/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

22/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

22/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

22/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

22/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

22/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

22/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

22/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

22/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

33

1005

PGM-2500P (QRAE III)

 

22/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

22/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

1005

PGM-2500P (QRAE III)

 

22/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

22/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

1005

PGM-2500P (QRAE III)

 

22/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

22/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

22/5/2021

WPR1

0.6

10:15

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

22/5/2021

WPR1

0.6

15:15

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

22/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

22/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

22/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

22/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

22/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

22/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

22/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

22/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

22/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

22/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

24/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

24/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

24/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

24/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

24/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

27

1009

PGM-2500P (QRAE III)

 

24/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

24/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

24/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

28

1009

PGM-2500P (QRAE III)

 

24/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

24/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

28

1009

PGM-2500P (QRAE III)

 

24/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

24/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

28

1009

PGM-2500P (QRAE III)

 

24/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

24/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

29

1009

PGM-2500P (QRAE III)

 

24/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

24/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

29

1009

PGM-2500P (QRAE III)

 

24/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

24/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

29

1009

PGM-2500P (QRAE III)

 

24/5/2021

WPR1

0.6

10:15

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

24/5/2021

WPR1

0.6

15:15

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

24/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

24/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

24/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

24/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

24/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

24/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

24/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

24/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

24/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

24/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

25/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

25/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

25/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

25/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

25/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

25/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

25/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

25/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

25/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

25/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

25/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

25/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

28

1010

PGM-2500P (QRAE III)

 

25/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

25/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

28

1009

PGM-2500P (QRAE III)

 

25/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

25/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

28

1009

PGM-2500P (QRAE III)

 

25/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

25/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

28

1009

PGM-2500P (QRAE III)

 

25/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

25/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

28

1009

PGM-2500P (QRAE III)

 

25/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

25/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

29

1009

PGM-2500P (QRAE III)

 

25/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

25/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

29

1009

PGM-2500P (QRAE III)

 

25/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

25/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

29

1009

PGM-2500P (QRAE III)

 

25/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

25/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

29

1009

PGM-2500P (QRAE III)

 

25/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

25/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

29

1009

PGM-2500P (QRAE III)

 

26/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

26/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

26/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

26/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

26/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

26/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

26/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

26/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

26/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

26/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

26/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

26/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

29

1009

PGM-2500P (QRAE III)

 

26/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

26/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

26/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

26/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

26/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

26/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

26/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

26/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

26/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

26/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

26/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

26/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

26/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

26/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

26/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

26/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

26/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

26/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

27/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

27/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

27/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

27/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

27/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

27/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

27/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

27/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

27/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

27/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

27/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

27/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

27/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

27/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

27/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

27/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

27/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

27/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

27/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

27/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

27/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

27/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

27/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

27/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

27/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

27/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

27/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

27/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

27/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

27/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

28/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1012

PGM-2500P (QRAE III)

 

28/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

28/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

28/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

28/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

28/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

28/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

28/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

28/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

28/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

28/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

28/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

28/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

28/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

28/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

28/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

28/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

28/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

28/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

28/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

28/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

28/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

28/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

28/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

28/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

28/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

28/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

28/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

28/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

28/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

29/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

29/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

29/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

29/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

29/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

29/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

29/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

29/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

29/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

29/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

29/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

29/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

29/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

29/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

29/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

29/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

29/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

29/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

29/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

29/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

29/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

29/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

29/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

29/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

29/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

29/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

29/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

29/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

29/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

29/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

31/5/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

31/5/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

31/5/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

1003

PGM-2500P (QRAE III)

 

31/5/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

31/5/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

31/5/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1003

PGM-2500P (QRAE III)

 

31/5/2021

CHFC 4+50

2.5

8:55

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

31/5/2021

CHFC 4+50

2.5

13:55

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

31/5/2021

CHFC O+90

2.5

9:00

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

31/5/2021

CHFC O+90

2.5

14:00

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

31/5/2021

Pit C

8

9:15

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

31/5/2021

Pit C

8

14:15

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

31/5/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

31/5/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

30

1003

PGM-2500P (QRAE III)

 

31/5/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

31/5/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

30

1003

PGM-2500P (QRAE III)

 

31/5/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

31/5/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1003

PGM-2500P (QRAE III)

 

31/5/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

31/5/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

1003

PGM-2500P (QRAE III)

 

31/5/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

31/5/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1003

PGM-2500P (QRAE III)

 

31/5/2021

WPR4

4

10:35

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

31/5/2021

WPR4

4

15:35

Fine

0

0

0

20.9

32

1003

PGM-2500P (QRAE III)

 

31/5/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

31/5/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1003

PGM-2500P (QRAE III)

 

31/5/2021

Pit A

5

10:55

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

31/5/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1003

PGM-2500P (QRAE III)

 

31/5/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

31/5/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1003

PGM-2500P (QRAE III)

 

1/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

26

1007

PGM-2500P (QRAE III)

 

1/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

1/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

26

1007

PGM-2500P (QRAE III)

 

1/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

1/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

1/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

1/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

1/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

1/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

1/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

27

1008

PGM-2500P (QRAE III)

 

1/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

27

1008

PGM-2500P (QRAE III)

 

1/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

1/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

1/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

1/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

1/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

1/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

2/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

26

1008

PGM-2500P (QRAE III)

 

2/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

2/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

2/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

26

1008

PGM-2500P (QRAE III)

 

2/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

2/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

2/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

2/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

3/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

3/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

3/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

3/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

3/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

3/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

3/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

3/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

3/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

3/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

3/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

3/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

3/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

3/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

3/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

3/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

3/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

3/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

4/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

4/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

4/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

28

1003

PGM-2500P (QRAE III)

 

4/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

4/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

4/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

28

1003

PGM-2500P (QRAE III)

 

4/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

4/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

4/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

4/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

4/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

4/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

4/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

4/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

4/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

4/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

4/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

4/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

4/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

4/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

4/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

28

104

PGM-2500P (QRAE III)

 

4/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

4/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

4/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

4/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

4/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

4/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

4/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

4/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

4/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

5/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

26

1005

PGM-2500P (QRAE III)

 

5/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

5/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

28

1003

PGM-2500P (QRAE III)

 

5/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

26

1005

PGM-2500P (QRAE III)

 

5/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

5/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

28

1003

PGM-2500P (QRAE III)

 

5/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

5/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

5/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

5/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

5/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

5/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

5/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

5/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

5/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

5/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

5/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

5/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

5/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

5/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

5/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

5/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

5/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

5/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

5/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

5/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

5/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

5/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

5/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

27

1005

PGM-2500P (QRAE III)

 

5/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

7/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

26

1007

PGM-2500P (QRAE III)

 

7/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

7/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

7/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

26

1008

PGM-2500P (QRAE III)

 

7/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

7/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

7/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

7/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

7/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

7/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

7/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

7/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

7/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

7/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

7/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

7/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

7/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

7/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

7/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

8/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

8/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

8/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

8/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

8/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

8/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

8/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

8/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

8/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

8/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

8/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

8/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

8/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

8/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

8/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

8/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

8/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

8/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

8/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

8/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

8/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

8/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

8/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

8/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

8/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

8/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

29

1009

PGM-2500P (QRAE III)

 

8/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

8/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

8/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

8/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

9/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

26

1008

PGM-2500P (QRAE III)

 

9/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

9/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

9/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

26

1008

PGM-2500P (QRAE III)

 

9/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

9/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

9/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

9/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

9/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

9/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

9/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

9/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

9/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

9/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

9/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

9/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

9/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

9/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

9/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

10/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

27

1006

PGM-2500P (QRAE III)

 

10/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

10/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

29

1003

PGM-2500P (QRAE III)

 

10/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

27

1006

PGM-2500P (QRAE III)

 

10/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

10/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

29

1003

PGM-2500P (QRAE III)

 

10/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

10/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

10/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

10/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

10/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

10/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

10/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

10/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

10/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

10/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

10/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

10/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

10/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

10/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

10/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

10/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

10/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

10/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

10/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

10/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

10/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

10/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

10/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

10/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

11/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

11/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

11/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

11/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

11/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

11/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

11/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

11/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

11/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

11/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

11/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

11/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

11/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

11/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

11/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

11/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

11/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

11/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

11/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

11/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

11/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

11/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

11/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

11/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

11/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

11/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

11/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

11/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

11/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

11/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

12/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

12/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

28

1009

PGM-2500P (QRAE III)

 

12/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

12/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

28

1008

PGM-2500P (QRAE III)

 

12/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

28

1008

PGM-2500P (QRAE III)

 

12/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

12/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

12/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

12/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

12/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

12/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

12/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

12/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

12/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

12/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

12/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

12/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

12/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

12/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

12/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

15/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

15/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

15/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

15/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

1003

PGM-2500P (QRAE III)

 

15/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

15/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

15/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1003

PGM-2500P (QRAE III)

 

15/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

15/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

15/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

15/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

15/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

15/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

15/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

15/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

15/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

15/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

15/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

15/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

15/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

15/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

15/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

15/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

15/6/2021

WPR4

4

10:35

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

15/6/2021

WPR4

4

15:35

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

15/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

15/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

15/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

15/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

15/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

15/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

16/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

16/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

16/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

16/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

16/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

16/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

16/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

16/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

16/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

16/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

16/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

16/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

16/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

16/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

1006

PGM-2500P (QRAE III)

 

16/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

16/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

16/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

16/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

16/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

16/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

16/6/2021

WPR4

0.6

10:35

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

16/6/2021

WPR4

0.6

15:35

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

16/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

16/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

16/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

333

1005

PGM-2500P (QRAE III)

 

16/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

16/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

16/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

17/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

17/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

17/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

17/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1008

PGM-2500P (QRAE III)

 

17/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

17/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

17/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

17/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

17/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

17/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

17/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

17/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

17/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

17/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

17/6/2021

WPR4

0.6

10:35

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

WPR4

0.6

15:35

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

17/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

17/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

17/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

17/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

18/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

18/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

18/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

18/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

18/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

18/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

18/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

18/6/2021

WPR2

2.8

10:25

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/6/2021

WPR2

2.8

15:25

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

WPR4

0.6

10:35

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/6/2021

WPR4

0.6

15:35

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

18/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

18/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

18/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

19/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

19/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

1002

PGM-2500P (QRAE III)

 

19/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

19/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1002

PGM-2500P (QRAE III)

 

19/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

WPR2

0.3

10:25

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

WPR2

0.3

15:25

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

WPR4

0.4

10:35

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

WPR4

0.4

15:35

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

19/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

19/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1004

PGM-2500P (QRAE III)

 

21/6/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

32

1003

PGM-2500P (QRAE III)

 

21/6/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

21/6/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

21/6/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

32

1003

PGM-2500P (QRAE III)

 

21/6/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

21/6/2021

CHFC 8+38

2.5

8:55

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

CHFC 8+38

2.5

13:55

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

21/6/2021

CHFC O+64

2.5

9:00

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

CHFC O+64

2.5

14:00

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

21/6/2021

Pit C

8

9:15

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

Pit C

8

14:15

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

21/6/2021

137 Pit C

7

9:45

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

137 Pit C

7

14:45

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

21/6/2021

137 Pit B

8.6

9:55

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

137 Pit B

8.6

14:55

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

21/6/2021

137 Pit A

8.3

10:05

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

137 Pit A

8.3

15:05

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

21/6/2021

WPR1

2.8

10:15

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

WPR1

2.8

15:15

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

21/6/2021

WPR2

0.3

10:25

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

WPR2

0.3

15:25

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

21/6/2021

WPR4

0.4

10:35

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

WPR4

0.4

15:35

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

21/6/2021

WPR3

2.8

10:45

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

WPR3

2.8

15:45

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

21/6/2021

Pit A

5

10:55

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

Pit A

5

15:55

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

21/6/2021

Pit B

3.6

11:05

Rain

0

0

0

20.9

31

1004

PGM-2500P (QRAE III)

 

21/6/2021

Pit B

3.6

16:05

Rain

0

0

0

20.9

32

1002

PGM-2500P (QRAE III)

 

22/6/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

24

1006

PGM-2500P (QRAE III)

 

22/6/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

26

1005

PGM-2500P (QRAE III)

 

22/6/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

22/6/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

24

1006

PGM-2500P (QRAE III)

 

22/6/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

26

1005

PGM-2500P (QRAE III)

 

22/6/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

22/6/2021

CHFC 8+38

2.5

8:55

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

CHFC 8+38

2.5

13:55

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

22/6/2021

CHFC O+64

2.5

9:00

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

CHFC O+64

2.5

14:00

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

22/6/2021

Pit C

8

9:15

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

Pit C

8

14:15

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

22/6/2021

137 Pit C

7

9:45

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

137 Pit C

7

14:45

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

22/6/2021

137 Pit B

8.6

9:55

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

137 Pit B

8.6

14:55

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

22/6/2021

137 Pit A

8.3

10:05

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

137 Pit A

8.3

15:05

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

22/6/2021

WPR1

2.8

10:15

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

WPR1

2.8

15:15

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

22/6/2021

WPR2

0.3

10:25

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

WPR2

0.3

15:25

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

22/6/2021

WPR4

0.4

10:35

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

WPR4

0.4

15:35

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

22/6/2021

WPR3

2.8

10:45

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

WPR3

2.8

15:45

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

22/6/2021

Pit A

5

10:55

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

Pit A

5

15:55

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

22/6/2021

Pit B

3.6

11:05

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

22/6/2021

Pit B

3.6

16:05

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

23/6/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

27

1006

PGM-2500P (QRAE III)

 

23/6/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

25

1006

PGM-2500P (QRAE III)

 

23/6/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

25

1005

PGM-2500P (QRAE III)

 

23/6/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

25

1006

PGM-2500P (QRAE III)

 

23/6/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

25

1005

PGM-2500P (QRAE III)

 

23/6/2021

CHFC 8+38

2.5

8:55

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

CHFC 8+38

2.5

13:55

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

23/6/2021

CHFC O+64

2.5

9:00

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

CHFC O+64

2.5

14:00

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

23/6/2021

Pit C

8

9:15

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

Pit C

8

14:15

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

23/6/2021

137 Pit C

7

9:45

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

137 Pit C

7

14:45

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

23/6/2021

137 Pit B

8.6

9:55

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

137 Pit B

8.6

14:55

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

23/6/2021

137 Pit A

8.3

10:05

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

137 Pit A

8.3

15:05

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

23/6/2021

WPR1

2.8

10:15

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

WPR1

2.8

15:15

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

23/6/2021

WPR2

0.3

10:25

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

WPR2

0.3

15:25

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

23/6/2021

WPR4

0.4

10:35

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

WPR4

0.4

15:35

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

23/6/2021

WPR3

2.8

10:45

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

WPR3

2.8

15:45

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

23/6/2021

Pit A

5

10:55

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

Pit A

5

15:55

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

23/6/2021

Pit B

3.6

11:05

Rain

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

23/6/2021

Pit B

3.6

16:05

Rain

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

24/6/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

25

1006

PGM-2500P (QRAE III)

 

24/6/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

25

1005

PGM-2500P (QRAE III)

 

24/6/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

26

1004

PGM-2500P (QRAE III)

 

24/6/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

25

1006

PGM-2500P (QRAE III)

 

24/6/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

25

1005

PGM-2500P (QRAE III)

 

24/6/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

26

1004

PGM-2500P (QRAE III)

 

24/6/2021

CHFC 8+38

2.5

8:55

Rain

0

0

0

20.9

26

1005

PGM-2500P (QRAE III)

 

24/6/2021

CHFC 8+38

2.5

13:55

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

CHFC O+64

2.5

9:00

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

CHFC O+64

2.5

14:00

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

Pit C

8

9:15

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

Pit C

8

14:15

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

137 Pit C

7

9:45

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

137 Pit C

7

14:45

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

137 Pit B

8.6

9:55

Rain

0

0

0

20.9

26

1007

PGM-2500P (QRAE III)

 

24/6/2021

137 Pit B

8.6

14:55

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

137 Pit A

8.3

10:05

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

137 Pit A

8.3

15:05

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

WPR1

2.8

10:15

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

WPR1

2.8

15:15

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

WPR2

0.3

10:25

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

WPR2

0.3

15:25

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

WPR4

0.4

10:35

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

WPR4

0.4

15:35

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

WPR3

2.8

10:45

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

WPR3

2.8

15:45

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

Pit A

5

10:55

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

Pit A

5

15:55

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

Pit B

3.6

11:05

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

24/6/2021

Pit B

3.6

16:05

Rain

0

0

0

20.9

26

1006

PGM-2500P (QRAE III)

 

25/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

27

1006

PGM-2500P (QRAE III)

 

25/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

27

1006

PGM-2500P (QRAE III)

 

25/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

27

1005

PGM-2500P (QRAE III)

 

25/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

27

1006

PGM-2500P (QRAE III)

 

25/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

27

1005

PGM-2500P (QRAE III)

 

25/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

WPR2

0.3

10:25

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

WPR2

0.3

15:25

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

WPR4

0.4

10:35

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

WPR4

0.4

15:35

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

25/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

27

1007

PGM-2500P (QRAE III)

 

25/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

26/6/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

25

1008

PGM-2500P (QRAE III)

 

26/6/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

26

1007

PGM-2500P (QRAE III)

 

26/6/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

26/6/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

25

1008

PGM-2500P (QRAE III)

 

26/6/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

26

1007

PGM-2500P (QRAE III)

 

26/6/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

26/6/2021

CHFC 8+38

2.5

8:55

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

CHFC 8+38

2.5

13:55

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

26/6/2021

CHFC O+64

2.5

9:00

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

CHFC O+64

2.5

14:00

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

26/6/2021

Pit C

8

9:15

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

Pit C

8

14:15

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

26/6/2021

137 Pit C

7

9:45

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

137 Pit C

7

14:45

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

26/6/2021

137 Pit B

8.6

9:55

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

137 Pit B

8.6

14:55

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

26/6/2021

137 Pit A

8.3

10:05

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

137 Pit A

8.3

15:05

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

26/6/2021

WPR1

2.8

10:15

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

WPR1

2.8

15:15

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

26/6/2021

WPR2

0.3

10:25

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

WPR2

0.3

15:25

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

26/6/2021

WPR4

0.4

10:35

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

WPR4

0.4

15:35

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

26/6/2021

WPR3

2.8

10:45

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

WPR3

2.8

15:45

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

26/6/2021

Pit A

5

10:55

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

Pit A

5

15:55

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

26/6/2021

Pit B

3.6

11:05

Rain

0

0

0

20.9

28

1007

PGM-2500P (QRAE III)

 

26/6/2021

Pit B

3.6

16:05

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

28/6/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

24

1006

PGM-2500P (QRAE III)

 

28/6/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

26

1005

PGM-2500P (QRAE III)

 

28/6/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

28/6/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

24

1006

PGM-2500P (QRAE III)

 

28/6/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

26

1005

PGM-2500P (QRAE III)

 

28/6/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

28/6/2021

CHFC 8+38

2.5

8:55

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

CHFC 8+38

2.5

13:55

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

28/6/2021

CHFC O+64

2.5

9:00

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

CHFC O+64

2.5

14:00

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

28/6/2021

Pit C

8

9:15

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

Pit C

8

14:15

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

28/6/2021

137 Pit C

7

9:45

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

137 Pit C

7

14:45

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

28/6/2021

137 Pit B

8.6

9:55

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

137 Pit B

8.6

14:55

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

28/6/2021

137 Pit A

8.3

10:05

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

137 Pit A

8.3

15:05

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

28/6/2021

WPR1

2.8

10:15

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

WPR1

2.8

15:15

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

28/6/2021

WPR2

0.3

10:25

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

WPR2

0.3

15:25

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

28/6/2021

WPR4

0.4

10:35

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

WPR4

0.4

15:35

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

28/6/2021

WPR3

2.8

10:45

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

WPR3

2.8

15:45

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

28/6/2021

Pit A

5

10:55

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

Pit A

5

15:55

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

28/6/2021

Pit B

3.6

11:05

Rain

0

0

0

20.9

28

1006

PGM-2500P (QRAE III)

 

28/6/2021

Pit B

3.6

16:05

Rain

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

29/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

29/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

29/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

29/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

29

1004

PGM-2500P (QRAE III)

 

29/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

29/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

29/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

29/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

29/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

29/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

29/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

29/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

29/6/2021

WPR2

2

10:25

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

WPR2

2

15:25

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

29/6/2021

WPR4

0.4

10:35

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

WPR4

0.4

15:35

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

29/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

29/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

29/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

29/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

30/6/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

30/6/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

30/6/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

30/6/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

30/6/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

30/6/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

30/6/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

30/6/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

30/6/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

Pit C

8

9:15

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

Pit C

8

14:15

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

30/6/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

30/6/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

30/6/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

30/6/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

WPR4

0.4

10:35

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

30/6/2021

WPR4

0.4

15:35

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

30/6/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

30/6/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

30/6/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

2/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

2/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

2/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

2/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

2/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

2/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

2/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

2/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

2/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

2/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

2/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

2/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

2/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

2/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

2/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

2/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

3/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

3/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

3/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

3/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1007

PGM-2500P (QRAE III)

 

3/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

3/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1005

PGM-2500P (QRAE III)

 

3/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

3/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

3/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

3/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

3/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

3/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

3/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

3/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

3/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

3/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

3/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

3/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1005

PGM-2500P (QRAE III)

 

5/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

28

1008

PGM-2500P (QRAE III)

 

5/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

5/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

5/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

28

1008

PGM-2500P (QRAE III)

 

5/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

31

1007

PGM-2500P (QRAE III)

 

5/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

5/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

5/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

5/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

5/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

5/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

5/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

5/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

5/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

5/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

5/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

5/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

5/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

5/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

5/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

5/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

5/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

5/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

5/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

5/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

5/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

5/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1008

PGM-2500P (QRAE III)

 

5/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

6/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

6/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

6/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1006

PGM-2500P (QRAE III)

 

6/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

31

1006

PGM-2500P (QRAE III)

 

6/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

28

1005

PGM-2500P (QRAE III)

 

6/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

6/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

6/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

6/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

6/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

6/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

6/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

6/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

6/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

6/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

6/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

6/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

1005

PGM-2500P (QRAE III)

 

7/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

27

1009

PGM-2500P (QRAE III)

 

7/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

7/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

7/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

27

1009

PGM-2500P (QRAE III)

 

7/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

7/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

7/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

7/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

7/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

7/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

7/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

7/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

7/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

7/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

7/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

7/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

7/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

7/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

7/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

7/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

7/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

7/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

7/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

7/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

7/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

7/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

7/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

7/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

8/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

8/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1012

PGM-2500P (QRAE III)

 

8/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

8/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

28

1012

PGM-2500P (QRAE III)

 

8/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1012

PGM-2500P (QRAE III)

 

8/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

8/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

8/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

8/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

8/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

8/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

8/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

8/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

8/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

8/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

8/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

8/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

8/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

8/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

8/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

8/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

8/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

8/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

8/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

8/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

8/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

101

PGM-2500P (QRAE III)

 

8/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1012

PGM-2500P (QRAE III)

 

8/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

9/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

9/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

9/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

9/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1011

PGM-2500P (QRAE III)

 

9/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

9/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

9/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

9/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

9/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

9/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

9/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

9/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

9/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

9/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

9/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

9/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

9/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

9/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

9/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

9/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

9/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

9/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

9/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

9/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

9/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

9/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

9/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

32

1011

PGM-2500P (QRAE III)

 

9/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

10/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

10/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

10/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

10/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1010

PGM-2500P (QRAE III)

 

10/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1010

PGM-2500P (QRAE III)

 

10/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

10/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

10/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

10/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

10/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

10/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

10/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

10/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

10/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

10/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

10/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

10/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

10/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

10/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

10/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

10/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

10/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

10/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

10/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

10/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

10/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

10/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

10/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1012

PGM-2500P (QRAE III)

 

12/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

33

1010

PGM-2500P (QRAE III)

 

12/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

12/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1012

PGM-2500P (QRAE III)

 

12/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

33

1010

PGM-2500P (QRAE III)

 

12/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

12/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

Pit D

1

9:15

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

Pit D

1

14:15

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

12/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1011

PGM-2500P (QRAE III)

 

12/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

33

1009

PGM-2500P (QRAE III)

 

13/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

13/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

13/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

13/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

13/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

1008

PGM-2500P (QRAE III)

 

13/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

13/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

13/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

13/7/2021

Pit D

1

9:15

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

Pit D

1

14:15

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

13/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

13/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

13/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

13/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

13/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

13/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

13/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

13/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

13/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

13/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

14/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

14/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

14/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

14/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

14/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

14/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1006

PGM-2500P (QRAE III)

 

14/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

14/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

14/7/2021

Pit D

1

9:15

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

Pit D

1

14:15

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

14/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

14/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

14/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

14/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

14/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

14/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

14/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

14/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

14/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

14/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

33

1007

PGM-2500P (QRAE III)

 

15/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

15/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

15/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

15/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

31

1009

PGM-2500P (QRAE III)

 

15/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

33

1008

PGM-2500P (QRAE III)

 

15/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

15/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

15/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

15/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

15/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

15/7/2021

Pit D

1

9:15

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

15/7/2021

Pit D

1

14:15

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

15/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

15/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

15/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

15/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

15/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

15/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

15/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

15/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

15/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

15/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

15/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

15/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

34

1007

PGM-2500P (QRAE III)

 

15/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

32

1009

PGM-2500P (QRAE III)

 

15/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

34

1009

PGM-2500P (QRAE III)

 

15/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

15/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

34

1009

PGM-2500P (QRAE III)

 

15/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

32

1007

PGM-2500P (QRAE III)

 

15/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

34

1009

PGM-2500P (QRAE III)

 

16/7/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

16/7/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

16/7/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

16/7/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

29

1010

PGM-2500P (QRAE III)

 

16/7/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

30

1008

PGM-2500P (QRAE III)

 

16/7/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

16/7/2021

CHFC 8+38

2.5

8:55

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

CHFC 8+38

2.5

13:55

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/7/2021

CHFC O+64

2.5

9:00

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

CHFC O+64

2.5

14:00

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/7/2021

Pit D

1

9:15

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

Pit D

1

14:15

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/7/2021

Pit C

8

9:25

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

Pit C

8

14:25

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/7/2021

137 Pit C

7

9:45

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

137 Pit C

7

14:45

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/7/2021

137 Pit B

8.6

9:55

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

137 Pit B

8.6

14:55

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/7/2021

137 Pit A

8.3

10:05

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

137 Pit A

8.3

15:05

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/7/2021

WPR1

2.8

10:15

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

WPR1

2.8

15:15

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/7/2021

WPR2

3.5

10:25

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

WPR2

3.5

15:25

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/7/2021

WPR3

2.8

10:45

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

WPR3

2.8

15:45

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/7/2021

Pit A

5

10:55

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

Pit A

5

15:55

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

16/7/2021

Pit B

3.6

11:05

Rain

0

0

0

20.9

30

1009

PGM-2500P (QRAE III)

 

16/7/2021

Pit B

3.6

16:05

Rain

0

0

0

20.9

30

1007

PGM-2500P (QRAE III)

 

17/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

17/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

17/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

29

1005

PGM-2500P (QRAE III)

 

17/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

28

1004

PGM-2500P (QRAE III)

 

17/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

21

1006

PGM-2500P (QRAE III)

 

17/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

17/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

17/7/2021

Pit D

1

9:15

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

Pit D

1

14:15

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

17/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

17/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

17/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

17/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

17/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

17/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

17/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

17/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

17/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

29

1006

PGM-2500P (QRAE III)

 

17/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

30

1004

PGM-2500P (QRAE III)

 

19/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

26

1002

PGM-2500P (QRAE III)

 

19/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

25

1002

PGM-2500P (QRAE III)

 

19/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

25

1001

PGM-2500P (QRAE III)

 

19/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

26

1002

PGM-2500P (QRAE III)

 

19/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

25

1002

PGM-2500P (QRAE III)

 

19/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

25

1001

PGM-2500P (QRAE III)

 

19/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

19/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

19/7/2021

Pit D

1

9:15

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

Pit D

1

14:15

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

19/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

19/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

19/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

19/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

19/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

19/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

19/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

19/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

19/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

19/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

20/7/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

25

1003

PGM-2500P (QRAE III)

 

20/7/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

24

1003

PGM-2500P (QRAE III)

 

20/7/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

25

1001

PGM-2500P (QRAE III)

 

20/7/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

25

1003

PGM-2500P (QRAE III)

 

20/7/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

24

1002

PGM-2500P (QRAE III)

 

20/7/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

25

1001

PGM-2500P (QRAE III)

 

20/7/2021

CHFC 8+38

2.5

8:55

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

CHFC 8+38

2.5

13:55

Rain

0

0

0

20.9

26

1001

PGM-2500P (QRAE III)

 

20/7/2021

CHFC O+64

2.5

9:00

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

CHFC O+64

2.5

14:00

Rain

0

0

0

20.9

26

1001

PGM-2500P (QRAE III)

 

20/7/2021

Pit D

1

9:15

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

Pit D

1

14:15

Rain

0

0

0

20.9

26

1001

PGM-2500P (QRAE III)

 

20/7/2021

Pit C

8

9:25

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

Pit C

8

14:25

Rain

0

0

0

20.9

26

1001

PGM-2500P (QRAE III)

 

20/7/2021

137 Pit C

7

9:45

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

137 Pit C

7

14:45

Rain

0

0

0

20.9

26

1001

PGM-2500P (QRAE III)

 

20/7/2021

137 Pit B

8.6

9:55

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

137 Pit B

8.6

14:55

Rain

0

0

0

20.9

26

1001

PGM-2500P (QRAE III)

 

20/7/2021

137 Pit A

8.3

10:05

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

137 Pit A

8.3

15:05

Rain

0

0

0

20.9

26

1001

PGM-2500P (QRAE III)

 

20/7/2021

WPR1

2.8

10:15

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

WPR1

2.8

15:15

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

WPR2

3.5

10:25

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

WPR2

3.5

15:25

Rain

0

0

0

20.9

26

1001

PGM-2500P (QRAE III)

 

20/7/2021

WPR3

2.8

10:45

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

WPR3

2.8

15:45

Rain

0

0

0

20.9

26

1001

PGM-2500P (QRAE III)

 

20/7/2021

Pit A

5

10:55

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

Pit A

5

15:55

Rain

0

0

0

20.9

26

1001

PGM-2500P (QRAE III)

 

20/7/2021

Pit B

3.6

11:05

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

20/7/2021

Pit B

3.6

16:05

Rain

0

0

0

20.9

26

1001

PGM-2500P (QRAE III)

 

21/7/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

21/7/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

21/7/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

21/7/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

26

1003

PGM-2500P (QRAE III)

 

21/7/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

21/7/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

21/7/2021

CHFC 8+38

2.5

8:55

Rain

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

21/7/2021

CHFC 8+38

2.5

13:55

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

21/7/2021

CHFC O+64

2.5

9:00

Rain

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

21/7/2021

CHFC O+64

2.5

14:00

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

21/7/2021

Pit D

1

9:15

Rain

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

21/7/2021

Pit D

1

14:15

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

21/7/2021

Pit C

8

9:25

Rain

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

21/7/2021

Pit C

8

14:25

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

21/7/2021

137 Pit C

7

9:45

Rain

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

21/7/2021

137 Pit C

7

14:45

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

21/7/2021

137 Pit B

8.6

9:55

Rain

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

21/7/2021

137 Pit B

8.6

14:55

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

21/7/2021

137 Pit A

8.3

10:05

Rain

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

21/7/2021

137 Pit A

8.3

15:05

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

21/7/2021

WPR1

2.8

10:15

Rain

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

21/7/2021

WPR1

2.8

15:15

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

21/7/2021

WPR2

3.5

10:25

Rain

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

21/7/2021

WPR2

3.5

15:25

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

21/7/2021

WPR3

2.8

10:45

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

21/7/2021

WPR3

2.8

15:45

Rain

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

21/7/2021

Pit A

5

10:55

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

21/7/2021

Pit A

5

15:55

Rain

0

0

0

20.9

27

1003

PGM-2500P (QRAE III)

 

21/7/2021

Pit B

3.6

11:05

Rain

0

0

0

20.9

27

1004

PGM-2500P (QRAE III)

 

21/7/2021

Pit B

3.6

16:05

Rain

0

0

0

20.9

27

1002

PGM-2500P (QRAE III)

 

22/7/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

28

1002

PGM-2500P (QRAE III)

 

22/7/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

31

1001

PGM-2500P (QRAE III)

 

22/7/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

22/7/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

29

1002

PGM-2500P (QRAE III)

 

22/7/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

31

1001

PGM-2500P (QRAE III)

 

22/7/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

22/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

30

1002

PGM-2500P (QRAE III)

 

22/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

22/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

30

1002

PGM-2500P (QRAE III)

 

22/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

22/7/2021

Pit D

1

9:15

Fine

0

0

0

20.9

30

1002

PGM-2500P (QRAE III)

 

22/7/2021

Pit D

1

14:15

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

22/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

30

1002

PGM-2500P (QRAE III)

 

22/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

22/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1002

PGM-2500P (QRAE III)

 

22/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

22/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1000

PGM-2500P (QRAE III)

 

22/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

22/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

22/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

22/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

30

1002

PGM-2500P (QRAE III)

 

22/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

22/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

30

1002

PGM-2500P (QRAE III)

 

22/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

22/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1002

PGM-2500P (QRAE III)

 

22/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

22/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

30

1002

PGM-2500P (QRAE III)

 

22/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

22/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

1002

PGM-2500P (QRAE III)

 

22/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

1000

PGM-2500P (QRAE III)

 

23/7/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

29

999

PGM-2500P (QRAE III)

 

23/7/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

23/7/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

33

996

PGM-2500P (QRAE III)

 

23/7/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

29

999

PGM-2500P (QRAE III)

 

23/7/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

23/7/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

33

996

PGM-2500P (QRAE III)

 

23/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

23/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

23/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

23/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

33

999

PGM-2500P (QRAE III)

 

23/7/2021

Pit D

1

9:15

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

23/7/2021

Pit D

1

14:15

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

23/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

23/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

23/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

23/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

23/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

23/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

999

PGM-2500P (QRAE III)

 

23/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

23/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

23/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

23/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

23/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

23/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

23/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

23/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

23/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

23/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

23/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

23/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

24/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

26

998

PGM-2500P (QRAE III)

 

24/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

24/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

996

PGM-2500P (QRAE III)

 

24/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

26

998

PGM-2500P (QRAE III)

 

24/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

29

997

PGM-2500P (QRAE III)

 

24/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

996

PGM-2500P (QRAE III)

 

24/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

24/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

24/7/2021

Pit D

2.5

9:15

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

Pit D

2.5

14:15

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

24/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

32

999

PGM-2500P (QRAE III)

 

24/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

24/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

24/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

24/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

24/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

24/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

24/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

24/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

24/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

26/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

999

PGM-2500P (QRAE III)

 

26/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

26/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

31

996

PGM-2500P (QRAE III)

 

26/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

999

PGM-2500P (QRAE III)

 

26/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

26/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

31

996

PGM-2500P (QRAE III)

 

26/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

995

PGM-2500P (QRAE III)

 

26/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

33

995

PGM-2500P (QRAE III)

 

26/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

26/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

33

995

PGM-2500P (QRAE III)

 

26/7/2021

Pit D

2.5

9:15

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

26/7/2021

Pit D

2.5

14:15

Fine

0

0

0

20.9

33

995

PGM-2500P (QRAE III)

 

26/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

26/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

33

995

PGM-2500P (QRAE III)

 

26/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

26/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

955

PGM-2500P (QRAE III)

 

26/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

26/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

995

PGM-2500P (QRAE III)

 

26/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

26/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

33

995

PGM-2500P (QRAE III)

 

26/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

26/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

33

995

PGM-2500P (QRAE III)

 

26/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

26/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

33

995

PGM-2500P (QRAE III)

 

26/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

26/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

33

995

PGM-2500P (QRAE III)

 

26/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

26/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

33

995

PGM-2500P (QRAE III)

 

26/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

26/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

33

995

PGM-2500P (QRAE III)

 

27/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

30

997

PGM-2500P (QRAE III)

 

27/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

34

995

PGM-2500P (QRAE III)

 

27/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

32

995

PGM-2500P (QRAE III)

 

27/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

30

997

PGM-2500P (QRAE III)

 

27/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

34

995

PGM-2500P (QRAE III)

 

27/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

32

995

PGM-2500P (QRAE III)

 

27/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

27/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

27/7/2021

Pit D

2.5

9:15

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

Pit D

2.5

14:15

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

27/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

27/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

27/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

27/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

27/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

27/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

27/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

27/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

27/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

32

997

PGM-2500P (QRAE III)

 

27/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

34

996

PGM-2500P (QRAE III)

 

28/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

28/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

33

996

PGM-2500P (QRAE III)

 

28/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

996

PGM-2500P (QRAE III)

 

28/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

31

997

PGM-2500P (QRAE III)

 

28/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

33

996

PGM-2500P (QRAE III)

 

28/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

996

PGM-2500P (QRAE III)

 

28/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

28/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

28/7/2021

Pit D

2.5

9:15

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

Pit D

2.5

14:15

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

28/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

28/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

28/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

28/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

28/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

28/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

28/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

28/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

28/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

998

PGM-2500P (QRAE III)

 

28/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

33

997

PGM-2500P (QRAE III)

 

29/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

29

1000

PGM-2500P (QRAE III)

 

29/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

29

1000

PGM-2500P (QRAE III)

 

29/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

28

998

PGM-2500P (QRAE III)

 

29/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

29

1000

PGM-2500P (QRAE III)

 

29/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

29

999

PGM-2500P (QRAE III)

 

29/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

28

998

PGM-2500P (QRAE III)

 

29/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

29/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

29/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

29/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

29/7/2021

Pit D

2.5

9:15

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

29/7/2021

Pit D

2.5

14:15

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

29/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

29/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

29/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

29/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

1001

PGM-2500P (QRAE III)

 

29/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

31

1001

PGM-2500P (QRAE III)

 

29/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

29/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1011

PGM-2500P (QRAE III)

 

29/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

29/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

29/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

29/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

29/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

29/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

29/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

29/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

29/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

29/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

29/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

30/7/2021

Area A

5.5

8:30

Rain

0

0

0

20.9

26

1002

PGM-2500P (QRAE III)

 

30/7/2021

Area A

5.5

13:30

Rain

0

0

0

20.9

29

1001

PGM-2500P (QRAE III)

 

30/7/2021

Area A

5.5

17:00

Rain

0

0

0

20.9

29

1000

PGM-2500P (QRAE III)

 

30/7/2021

Area B

2.5

8:45

Rain

0

0

0

20.9

26

1002

PGM-2500P (QRAE III)

 

30/7/2021

Area B

2.5

13:45

Rain

0

0

0

20.9

29

1001

PGM-2500P (QRAE III)

 

30/7/2021

Area B

2.5

16:45

Rain

0

0

0

20.9

29

1000

PGM-2500P (QRAE III)

 

30/7/2021

CHFC 8+38

2.5

8:55

Rain

0

0

0

20.9

29

1002

PGM-2500P (QRAE III)

 

30/7/2021

CHFC 8+38

2.5

13:55

Rain

0

0

0

20.9

30

1000

PGM-2500P (QRAE III)

 

30/7/2021

CHFC O+64

2.5

9:00

Rain

0

0

0

20.9

29

1002

PGM-2500P (QRAE III)

 

30/7/2021

CHFC O+64

2.5

14:00

Rain

0

0

0

20.9

30

1000

PGM-2500P (QRAE III)

 

30/7/2021

Pit D

2.5

9:15

Rain

0

0

0

20.9

29

1002

PGM-2500P (QRAE III)

 

30/7/2021

Pit D

2.5

14:15

Rain

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

30/7/2021

Pit C

8

9:25

Rain

0

0

0

20.9

29

1002

PGM-2500P (QRAE III)

 

30/7/2021

Pit C

8

14:25

Rain

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

30/7/2021

137 Pit C

7

9:45

Rain

0

0

0

20.9

29

1002

PGM-2500P (QRAE III)

 

30/7/2021

137 Pit C

7

14:45

Rain

0

0

0

20.9

30

1000

PGM-2500P (QRAE III)

 

30/7/2021

137 Pit B

8.6

9:55

Rain

0

0

0

20.9

29

1002

PGM-2500P (QRAE III)

 

30/7/2021

137 Pit B

8.6

14:55

Rain

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

30/7/2021

137 Pit A

8.3

10:05

Rain

0

0

0

20.9

29

1002

PGM-2500P (QRAE III)

 

30/7/2021

137 Pit A

8.3

15:05

Rain

0

0

0

20.9

30

1000

PGM-2500P (QRAE III)

 

30/7/2021

WPR1

2.8

10:15

Rain

0

0

0

20.9

29

1001

PGM-2500P (QRAE III)

 

30/7/2021

WPR1

2.8

15:15

Rain

0

0

0

20.9

30

1000

PGM-2500P (QRAE III)

 

30/7/2021

WPR2

3.5

10:25

Rain

0

0

0

20.9

29

1001

PGM-2500P (QRAE III)

 

30/7/2021

WPR2

3.5

15:25

Rain

0

0

0

20.9

30

1000

PGM-2500P (QRAE III)

 

30/7/2021

WPR3

2.8

10:45

Rain

0

0

0

20.9

29

1001

PGM-2500P (QRAE III)

 

30/7/2021

WPR3

2.8

15:45

Rain

0

0

0

20.9

30

1000

PGM-2500P (QRAE III)

 

30/7/2021

Pit A

5

10:55

Rain

0

0

0

20.9

29

1001

PGM-2500P (QRAE III)

 

30/7/2021

Pit A

5

15:55

Rain

0

0

0

20.9

30

1000

PGM-2500P (QRAE III)

 

30/7/2021

Pit B

3.6

11:05

Rain

0

0

0

20.9

29

1002

PGM-2500P (QRAE III)

 

30/7/2021

Pit B

3.6

16:05

Rain

0

0

0

20.9

30

1000

PGM-2500P (QRAE III)

 

31/7/2021

Area A

5.5

8:30

Fine

0

0

0

20.9

27

1001

PGM-2500P (QRAE III)

 

31/7/2021

Area A

5.5

13:30

Fine

0

0

0

20.9

31

1000

PGM-2500P (QRAE III)

 

31/7/2021

Area A

5.5

17:00

Fine

0

0

0

20.9

30

998

PGM-2500P (QRAE III)

 

31/7/2021

Area B

2.5

8:45

Fine

0

0

0

20.9

28

1001

PGM-2500P (QRAE III)

 

31/7/2021

Area B

2.5

13:45

Fine

0

0

0

20.9

31

1000

PGM-2500P (QRAE III)

 

31/7/2021

Area B

2.5

16:45

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

31/7/2021

CHFC 8+38

2.5

8:55

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

31/7/2021

CHFC 8+38

2.5

13:55

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

31/7/2021

CHFC O+64

2.5

9:00

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

31/7/2021

CHFC O+64

2.5

14:00

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

31/7/2021

Pit D

2.5

9:15

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

31/7/2021

Pit D

2.5

14:15

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

31/7/2021

Pit C

8

9:25

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

31/7/2021

Pit C

8

14:25

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

31/7/2021

137 Pit C

7

9:45

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

31/7/2021

137 Pit C

7

14:45

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

31/7/2021

137 Pit B

8.6

9:55

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

31/7/2021

137 Pit B

8.6

14:55

Fine

0

0

0

20.9

30

999

PGM-2500P (QRAE III)

 

31/7/2021

137 Pit A

8.3

10:05

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

31/7/2021

137 Pit A

8.3

15:05

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

31/7/2021

WPR1

2.8

10:15

Fine

0

0

0

20.9

30

1001

PGM-2500P (QRAE III)

 

31/7/2021

WPR1

2.8

15:15

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

31/7/2021

WPR2

3.5

10:25

Fine

0

0

0

20.9

31

1001

PGM-2500P (QRAE III)

 

31/7/2021

WPR2

3.5

15:25

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

31/7/2021

WPR3

2.8

10:45

Fine

0

0

0

20.9

31

1001

PGM-2500P (QRAE III)

 

31/7/2021

WPR3

2.8

15:45

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

31/7/2021

Pit A

5

10:55

Fine

0

0

0

20.9

31

1001

PGM-2500P (QRAE III)

 

31/7/2021

Pit A

5

15:55

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

31/7/2021

Pit B

3.6

11:05

Fine

0

0

0

20.9

31

1001

PGM-2500P (QRAE III)

 

31/7/2021

Pit B

3.6

16:05

Fine

0

0

0

20.9

31

999

PGM-2500P (QRAE III)

 

 

 


 

Date of Measurement

Sampling Location

Depth
(m)

Sampling time

Carbon Dioxide (%)

Measurement Equipment

3/5/2021

Area A

5.5

8:30

0.0416

MultiRAE Lite (PGM-6208)

3/5/2021

Area A

5.5

13:30

0.0417

MultiRAE Lite (PGM-6208)

3/5/2021

Area A

5.5

17:00

0.0420

MultiRAE Lite (PGM-6208)

3/5/2021

Area B

2.5

8:45

0.0418

MultiRAE Lite (PGM-6208)

3/5/2021

Area B

2.5

13:45

0.0420

MultiRAE Lite (PGM-6208)

3/5/2021

Area B

2.5

16:45

0.0420

MultiRAE Lite (PGM-6208)

3/5/2021

LF WF2

2.5

8:55

0.0411

MultiRAE Lite (PGM-6208)

3/5/2021

LF WF2

2.5

13:55

0.0419

MultiRAE Lite (PGM-6208)

3/5/2021

LF WF1

2.5

9:00

0.0415

MultiRAE Lite (PGM-6208)

3/5/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

3/5/2021

Pit C

8

9:20

0.0419

MultiRAE Lite (PGM-6208)

3/5/2021

Pit C

8

14:20

0.0417

MultiRAE Lite (PGM-6208)

3/5/2021

137 Pit C

7

9:35

0.0417

MultiRAE Lite (PGM-6208)

3/5/2021

137 Pit C

7

14:35

0.0422

MultiRAE Lite (PGM-6208)

3/5/2021

137 Pit B

8.6

9:45

0.0410

MultiRAE Lite (PGM-6208)

3/5/2021

137 Pit B

8.6

14:45

0.0417

MultiRAE Lite (PGM-6208)

3/5/2021

137 Pit A

8.3

9:55

0.0415

MultiRAE Lite (PGM-6208)

3/5/2021

137 Pit A

8.3

14:55

0.0411

MultiRAE Lite (PGM-6208)

3/5/2021

WPR1

2.8

10:05

0.0417

MultiRAE Lite (PGM-6208)

3/5/2021

WPR1

2.8

15:05

0.0416

MultiRAE Lite (PGM-6208)

3/5/2021

WPR2

2.8

10:15

0.0417

MultiRAE Lite (PGM-6208)

3/5/2021

WPR2

2.8

15:15

0.0414

MultiRAE Lite (PGM-6208)

3/5/2021

WPR4

4

10:25

0.0419

MultiRAE Lite (PGM-6208)

3/5/2021

WPR4

4

15:25

0.0411

MultiRAE Lite (PGM-6208)

3/5/2021

WPR3

2.8

10:45

0.0413

MultiRAE Lite (PGM-6208)

3/5/2021

WPR3

2.8

15:45

0.0418

MultiRAE Lite (PGM-6208)

3/5/2021

Pit A

5

10:55

0.0416

MultiRAE Lite (PGM-6208)

3/5/2021

Pit A

5

15:55

0.0414

MultiRAE Lite (PGM-6208)

3/5/2021

Pit B

3.6

11:05

0.0415

MultiRAE Lite (PGM-6208)

3/5/2021

Pit B

3.6

16:05

0.0415

MultiRAE Lite (PGM-6208)

4/5/2021

Area A

5.5

8:30

0.0417

MultiRAE Lite (PGM-6208)

4/5/2021

Area A

5.5

13:30

0.0416

MultiRAE Lite (PGM-6208)

4/5/2021

Area A

5.5

17:00

0.0422

MultiRAE Lite (PGM-6208)

4/5/2021

Area B

2.5

8:45

0.0415

MultiRAE Lite (PGM-6208)

4/5/2021

Area B

2.5

13:45

0.0430

MultiRAE Lite (PGM-6208)

4/5/2021

Area B

2.5

16:45

0.0415

MultiRAE Lite (PGM-6208)

4/5/2021

LF WF2

2.5

8:55

0.0420

MultiRAE Lite (PGM-6208)

4/5/2021

LF WF2

2.5

13:55

0.0412

MultiRAE Lite (PGM-6208)

4/5/2021

LF WF1

2.5

9:00

0.0418

MultiRAE Lite (PGM-6208)

4/5/2021

LF WF1

2.5

14:00

0.0416

MultiRAE Lite (PGM-6208)

4/5/2021

Pit C

8

9:20

0.0414

MultiRAE Lite (PGM-6208)

4/5/2021

Pit C

8

14:20

0.0417

MultiRAE Lite (PGM-6208)

4/5/2021

137 Pit C

7

9:35

0.0420

MultiRAE Lite (PGM-6208)

4/5/2021

137 Pit C

7

14:35

0.0413

MultiRAE Lite (PGM-6208)

4/5/2021

137 Pit B

8.6

9:45

0.0417

MultiRAE Lite (PGM-6208)

4/5/2021

137 Pit B

8.6

14:45

0.0409

MultiRAE Lite (PGM-6208)

4/5/2021

137 Pit A

8.3

9:55

0.0413

MultiRAE Lite (PGM-6208)

4/5/2021

137 Pit A

8.3

14:55

0.0418

MultiRAE Lite (PGM-6208)

4/5/2021

WPR1

2.8

10:05

0.0411

MultiRAE Lite (PGM-6208)

4/5/2021

WPR1

2.8

15:05

0.0419

MultiRAE Lite (PGM-6208)

4/5/2021

WPR2

2.8

10:15

0.0418

MultiRAE Lite (PGM-6208)

4/5/2021

WPR2

2.8

15:15

0.0420

MultiRAE Lite (PGM-6208)

4/5/2021

WPR4

4

10:25

0.0415

MultiRAE Lite (PGM-6208)

4/5/2021

WPR4

4

15:25

0.0416

MultiRAE Lite (PGM-6208)

4/5/2021

WPR3

2.8

10:45

0.0413

MultiRAE Lite (PGM-6208)

4/5/2021

WPR3

2.8

15:45

0.0417

MultiRAE Lite (PGM-6208)

4/5/2021

Pit A

5

10:55

0.0412

MultiRAE Lite (PGM-6208)

4/5/2021

Pit A

5

15:55

0.0416

MultiRAE Lite (PGM-6208)

4/5/2021

Pit B

3.6

11:05

0.0417

MultiRAE Lite (PGM-6208)

4/5/2021

Pit B

3.6

16:05

0.0424

MultiRAE Lite (PGM-6208)

5/5/2021

Area A

5.5

8:30

0.0417

MultiRAE Lite (PGM-6208)

5/5/2021

Area A

5.5

13:30

0.0424

MultiRAE Lite (PGM-6208)

5/5/2021

Area A

5.5

17:00

0.0414

MultiRAE Lite (PGM-6208)

5/5/2021

Area B

2.5

8:45

0.0420

MultiRAE Lite (PGM-6208)

5/5/2021

Area B

2.5

13:45

0.0410

MultiRAE Lite (PGM-6208)

5/5/2021

Area B

2.5

16:45

0.0415

MultiRAE Lite (PGM-6208)

5/5/2021

LF WF2

2.5

8:55

0.0417

MultiRAE Lite (PGM-6208)

5/5/2021

LF WF2

2.5

13:55

0.0404

MultiRAE Lite (PGM-6208)

5/5/2021

LF WF1

2.5

9:00

0.0420

MultiRAE Lite (PGM-6208)

5/5/2021

LF WF1

2.5

14:00

0.0418

MultiRAE Lite (PGM-6208)

5/5/2021

Pit C

8

9:20

0.0417

MultiRAE Lite (PGM-6208)

5/5/2021

Pit C

8

14:20

0.0415

MultiRAE Lite (PGM-6208)

5/5/2021

137 Pit C

7

9:35

0.0418

MultiRAE Lite (PGM-6208)

5/5/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

5/5/2021

137 Pit B

8.6

9:45

0.0415

MultiRAE Lite (PGM-6208)

5/5/2021

137 Pit B

8.6

14:45

0.0409

MultiRAE Lite (PGM-6208)

5/5/2021

137 Pit A

8.3

9:55

0.0417

MultiRAE Lite (PGM-6208)

5/5/2021

137 Pit A

8.3

14:55

0.0413

MultiRAE Lite (PGM-6208)

5/5/2021

WPR1

2.8

10:05

0.0415

MultiRAE Lite (PGM-6208)

5/5/2021

WPR1

2.8

15:05

0.0414

MultiRAE Lite (PGM-6208)

5/5/2021

WPR2

2.8

10:15

0.0415

MultiRAE Lite (PGM-6208)

5/5/2021

WPR2

2.8

15:15

0.0417

MultiRAE Lite (PGM-6208)

5/5/2021

WPR4

4

10:25

0.0416

MultiRAE Lite (PGM-6208)

5/5/2021

WPR4

4

15:25

0.0418

MultiRAE Lite (PGM-6208)

5/5/2021

WPR3

2.8

10:45

0.0419

MultiRAE Lite (PGM-6208)

5/5/2021

WPR3

2.8

15:45

0.0414

MultiRAE Lite (PGM-6208)

5/5/2021

Pit A

5

10:55

0.0420

MultiRAE Lite (PGM-6208)

5/5/2021

Pit A

5

15:55

0.0418

MultiRAE Lite (PGM-6208)

5/5/2021

Pit B

3.6

11:05

0.0421

MultiRAE Lite (PGM-6208)

5/5/2021

Pit B

3.6

16:05

0.0415

MultiRAE Lite (PGM-6208)

6/5/2021

Area A

5.5

8:30

0.0418

MultiRAE Lite (PGM-6208)

6/5/2021

Area A

5.5

13:30

0.0417

MultiRAE Lite (PGM-6208)

6/5/2021

Area A

5.5

17:00

0.0419

MultiRAE Lite (PGM-6208)

6/5/2021

Area B

2.5

8:45

0.0420

MultiRAE Lite (PGM-6208)

6/5/2021

Area B

2.5

13:45

0.0418

MultiRAE Lite (PGM-6208)

6/5/2021

Area B

2.5

16:45

0.0414

MultiRAE Lite (PGM-6208)

6/5/2021

LF WF2

2.5

8:55

0.0423

MultiRAE Lite (PGM-6208)

6/5/2021

LF WF2

2.5

13:55

0.0407

MultiRAE Lite (PGM-6208)

6/5/2021

LF WF1

2.5

9:00

0.0403

MultiRAE Lite (PGM-6208)

6/5/2021

LF WF1

2.5

14:00

0.0427

MultiRAE Lite (PGM-6208)

6/5/2021

Pit C

8

9:20

0.0406

MultiRAE Lite (PGM-6208)

6/5/2021

Pit C

8

14:20

0.0424

MultiRAE Lite (PGM-6208)

6/5/2021

137 Pit C

7

9:35

0.0412

MultiRAE Lite (PGM-6208)

6/5/2021

137 Pit C

7

14:35

0.0408

MultiRAE Lite (PGM-6208)

6/5/2021

137 Pit B

8.6

9:45

0.0419

MultiRAE Lite (PGM-6208)

6/5/2021

137 Pit B

8.6

14:45

0.0412

MultiRAE Lite (PGM-6208)

6/5/2021

137 Pit A

8.3

9:55

0.0409

MultiRAE Lite (PGM-6208)

6/5/2021

137 Pit A

8.3

14:55

0.0421

MultiRAE Lite (PGM-6208)

6/5/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

6/5/2021

WPR1

2.8

15:05

0.0420

MultiRAE Lite (PGM-6208)

6/5/2021

WPR2

2.8

10:15

0.0416

MultiRAE Lite (PGM-6208)

6/5/2021

WPR2

2.8

15:15

0.0414

MultiRAE Lite (PGM-6208)

6/5/2021

WPR4

4

10:25

0.0410

MultiRAE Lite (PGM-6208)

6/5/2021

WPR4

4

15:25

0.0428

MultiRAE Lite (PGM-6208)

6/5/2021

WPR3

2.8

10:45

0.0411

MultiRAE Lite (PGM-6208)

6/5/2021

WPR3

2.8

15:45

0.0425

MultiRAE Lite (PGM-6208)

6/5/2021

Pit A

5

10:55

0.0411

MultiRAE Lite (PGM-6208)

6/5/2021

Pit A

5

15:55

0.0411

MultiRAE Lite (PGM-6208)

6/5/2021

Pit B

3.6

11:05

0.0414

MultiRAE Lite (PGM-6208)

6/5/2021

Pit B

3.6

16:05

0.0413

MultiRAE Lite (PGM-6208)

7/5/2021

Area A

5.5

8:30

0.0411

MultiRAE Lite (PGM-6208)

7/5/2021

Area A

5.5

13:30

0.0412

MultiRAE Lite (PGM-6208)

7/5/2021

Area A

5.5

17:00

0.0419

MultiRAE Lite (PGM-6208)

7/5/2021

Area B

2.5

8:45

0.0408

MultiRAE Lite (PGM-6208)

7/5/2021

Area B

2.5

13:45

0.0431

MultiRAE Lite (PGM-6208)

7/5/2021

Area B

2.5

16:45

0.0420

MultiRAE Lite (PGM-6208)

7/5/2021

LF WF2

2.5

8:55

0.0415

MultiRAE Lite (PGM-6208)

7/5/2021

LF WF2

2.5

13:55

0.0411

MultiRAE Lite (PGM-6208)

7/5/2021

LF WF1

2.5

9:00

0.0412

MultiRAE Lite (PGM-6208)

7/5/2021

LF WF1

2.5

14:00

0.0422

MultiRAE Lite (PGM-6208)

7/5/2021

Pit C

8

9:20

0.0415

MultiRAE Lite (PGM-6208)

7/5/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

7/5/2021

137 Pit C

7

9:35

0.0407

MultiRAE Lite (PGM-6208)

7/5/2021

137 Pit C

7

14:35

0.0411

MultiRAE Lite (PGM-6208)

7/5/2021

137 Pit B

8.6

9:45

0.0412

MultiRAE Lite (PGM-6208)

7/5/2021

137 Pit B

8.6

14:45

0.0413

MultiRAE Lite (PGM-6208)

7/5/2021

137 Pit A

8.3

9:55

0.0415

MultiRAE Lite (PGM-6208)

7/5/2021

137 Pit A

8.3

14:55

0.0420

MultiRAE Lite (PGM-6208)

7/5/2021

WPR1

2.8

10:05

0.0425

MultiRAE Lite (PGM-6208)

7/5/2021

WPR1

2.8

15:05

0.0412

MultiRAE Lite (PGM-6208)

7/5/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

7/5/2021

WPR2

2.8

15:15

0.0420

MultiRAE Lite (PGM-6208)

7/5/2021

WPR4

4

10:25

0.0415

MultiRAE Lite (PGM-6208)

7/5/2021

WPR4

4

15:25

0.0412

MultiRAE Lite (PGM-6208)

7/5/2021

WPR3

2.8

10:45

0.0418

MultiRAE Lite (PGM-6208)

7/5/2021

WPR3

2.8

15:45

0.0419

MultiRAE Lite (PGM-6208)

7/5/2021

Pit A

5

10:55

0.0426

MultiRAE Lite (PGM-6208)

7/5/2021

Pit A

5

15:55

0.0430

MultiRAE Lite (PGM-6208)

7/5/2021

Pit B

3.6

11:05

0.0412

MultiRAE Lite (PGM-6208)

7/5/2021

Pit B

3.6

16:05

0.0404

MultiRAE Lite (PGM-6208)

8/5/2021

Area A

5.5

8:30

0.0412

MultiRAE Lite (PGM-6208)

8/5/2021

Area A

5.5

13:30

0.0411

MultiRAE Lite (PGM-6208)

8/5/2021

Area A

5.5

17:00

0.0422

MultiRAE Lite (PGM-6208)

8/5/2021

Area B

2.5

8:45

0.0423

MultiRAE Lite (PGM-6208)

8/5/2021

Area B

2.5

13:45

0.0421

MultiRAE Lite (PGM-6208)

8/5/2021

Area B

2.5

16:45

0.0414

MultiRAE Lite (PGM-6208)

8/5/2021

LF WF2

2.5

8:55

0.0426

MultiRAE Lite (PGM-6208)

8/5/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

8/5/2021

LF WF1

2.5

9:00

0.0415

MultiRAE Lite (PGM-6208)

8/5/2021

LF WF1

2.5

14:00

0.0417

MultiRAE Lite (PGM-6208)

8/5/2021

Pit C

8

9:20

0.0413

MultiRAE Lite (PGM-6208)

8/5/2021

Pit C

8

14:20

0.0426

MultiRAE Lite (PGM-6208)

8/5/2021

137 Pit C

7

9:35

0.0419

MultiRAE Lite (PGM-6208)

8/5/2021

137 Pit C

7

14:35

0.0422

MultiRAE Lite (PGM-6208)

8/5/2021

137 Pit B

8.6

9:45

0.0419

MultiRAE Lite (PGM-6208)

8/5/2021

137 Pit B

8.6

14:45

0.0415

MultiRAE Lite (PGM-6208)

8/5/2021

137 Pit A

8.3

9:55

0.0422

MultiRAE Lite (PGM-6208)

8/5/2021

137 Pit A

8.3

14:55

0.0417

MultiRAE Lite (PGM-6208)

8/5/2021

WPR1

2.8

10:05

0.0421

MultiRAE Lite (PGM-6208)

8/5/2021

WPR1

2.8

15:05

0.0416

MultiRAE Lite (PGM-6208)

8/5/2021

WPR2

2.8

10:15

0.0412

MultiRAE Lite (PGM-6208)

8/5/2021

WPR2

2.8

15:15

0.0416

MultiRAE Lite (PGM-6208)

8/5/2021

WPR4

4

10:25

0.0415

MultiRAE Lite (PGM-6208)

8/5/2021

WPR4

4

15:25

0.0422

MultiRAE Lite (PGM-6208)

8/5/2021

WPR3

2.8

10:45

0.0419

MultiRAE Lite (PGM-6208)

8/5/2021

WPR3

2.8

15:45

0.0423

MultiRAE Lite (PGM-6208)

8/5/2021

Pit A

5

10:55

0.0424

MultiRAE Lite (PGM-6208)

8/5/2021

Pit A

5

15:55

0.0423

MultiRAE Lite (PGM-6208)

8/5/2021

Pit B

3.6

11:05

0.0412

MultiRAE Lite (PGM-6208)

8/5/2021

Pit B

3.6

16:05

0.0418

MultiRAE Lite (PGM-6208)

10/5/2021

Area A

5.5

8:30

0.0411

MultiRAE Lite (PGM-6208)

10/5/2021

Area A

5.5

13:30

0.0419

MultiRAE Lite (PGM-6208)

10/5/2021

Area A

5.5

17:00

0.0421

MultiRAE Lite (PGM-6208)

10/5/2021

Area B

2.5

8:45

0.0426

MultiRAE Lite (PGM-6208)

10/5/2021

Area B

2.5

13:45

0.0418

MultiRAE Lite (PGM-6208)

10/5/2021

Area B

2.5

16:45

0.0415

MultiRAE Lite (PGM-6208)

10/5/2021

LF WF2

2.5

8:55

0.0416

MultiRAE Lite (PGM-6208)

10/5/2021

LF WF2

2.5

13:55

0.0417

MultiRAE Lite (PGM-6208)

10/5/2021

LF WF1

2.5

9:00

0.0422

MultiRAE Lite (PGM-6208)

10/5/2021

LF WF1

2.5

14:00

0.0420

MultiRAE Lite (PGM-6208)

10/5/2021

Pit C

8

9:20

0.0415

MultiRAE Lite (PGM-6208)

10/5/2021

Pit C

8

14:20

0.0413

MultiRAE Lite (PGM-6208)

10/5/2021

137 Pit C

7

9:35

0.0442

MultiRAE Lite (PGM-6208)

10/5/2021

137 Pit C

7

14:35

0.0424

MultiRAE Lite (PGM-6208)

10/5/2021

137 Pit B

8.6

9:45

0.0419

MultiRAE Lite (PGM-6208)

10/5/2021

137 Pit B

8.6

14:45

0.0418

MultiRAE Lite (PGM-6208)

10/5/2021

137 Pit A

8.3

9:55

0.0422

MultiRAE Lite (PGM-6208)

10/5/2021

137 Pit A

8.3

14:55

0.0409

MultiRAE Lite (PGM-6208)

10/5/2021

WPR2

2.8

10:15

0.0418

MultiRAE Lite (PGM-6208)

10/5/2021

WPR2

2.8

15:15

0.0426

MultiRAE Lite (PGM-6208)

10/5/2021

WPR4

4

10:25

0.0419

MultiRAE Lite (PGM-6208)

10/5/2021

WPR4

4

15:25

0.0411

MultiRAE Lite (PGM-6208)

10/5/2021

WPR3

2.8

10:45

0.0406

MultiRAE Lite (PGM-6208)

10/5/2021

WPR3

2.8

15:45

0.0427

MultiRAE Lite (PGM-6208)

10/5/2021

Pit A

5

10:55

0.0431

MultiRAE Lite (PGM-6208)

10/5/2021

Pit A

5

15:55

0.0424

MultiRAE Lite (PGM-6208)

10/5/2021

Pit B

3.6

11:05

0.0426

MultiRAE Lite (PGM-6208)

10/5/2021

Pit B

3.6

16:05

0.0421

MultiRAE Lite (PGM-6208)

11/5/2021

Area A

5.5

8:30

0.0411

MultiRAE Lite (PGM-6208)

11/5/2021

Area A

5.5

13:30

0.0418

MultiRAE Lite (PGM-6208)

11/5/2021

Area A

5.5

17:00

0.0419

MultiRAE Lite (PGM-6208)

11/5/2021

Area B

2.5

8:45

0.0418

MultiRAE Lite (PGM-6208)

11/5/2021

Area B

2.5

13:45

0.0414

MultiRAE Lite (PGM-6208)

11/5/2021

Area B

2.5

16:45

0.0415

MultiRAE Lite (PGM-6208)

11/5/2021

LF WF2

2.5

8:55

0.0411

MultiRAE Lite (PGM-6208)

11/5/2021

LF WF2

2.5

13:55

0.0412

MultiRAE Lite (PGM-6208)

11/5/2021

LF WF1

2.5

9:00

0.0415

MultiRAE Lite (PGM-6208)

11/5/2021

LF WF1

2.5

14:00

0.0415

MultiRAE Lite (PGM-6208)

11/5/2021

Pit C

8

9:20

0.0416

MultiRAE Lite (PGM-6208)

11/5/2021

Pit C

8

14:20

0.0417

MultiRAE Lite (PGM-6208)

11/5/2021

137 Pit C

7

9:35

0.0411

MultiRAE Lite (PGM-6208)

11/5/2021

137 Pit C

7

14:35

0.0409

MultiRAE Lite (PGM-6208)

11/5/2021

137 Pit B

8.6

9:45

0.0420

MultiRAE Lite (PGM-6208)

11/5/2021

137 Pit B

8.6

14:45

0.0410

MultiRAE Lite (PGM-6208)

11/5/2021

137 Pit A

8.3

9:55

0.0424

MultiRAE Lite (PGM-6208)

11/5/2021

137 Pit A

8.3

14:55

0.0435

MultiRAE Lite (PGM-6208)

11/5/2021

WPR2

2.8

10:15

0.0418

MultiRAE Lite (PGM-6208)

11/5/2021

WPR2

2.8

15:15

0.0419

MultiRAE Lite (PGM-6208)

11/5/2021

WPR4

4

10:25

0.0422

MultiRAE Lite (PGM-6208)

11/5/2021

WPR4

4

15:25

0.0420

MultiRAE Lite (PGM-6208)

11/5/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

11/5/2021

WPR3

2.8

15:45

0.0418

MultiRAE Lite (PGM-6208)

11/5/2021

Pit A

5

10:55

0.0429

MultiRAE Lite (PGM-6208)

11/5/2021

Pit A

5

15:55

0.0404

MultiRAE Lite (PGM-6208)

11/5/2021

Pit B

3.6

11:05

0.0414

MultiRAE Lite (PGM-6208)

11/5/2021

Pit B

3.6

16:05

0.0411

MultiRAE Lite (PGM-6208)

12/5/2021

Area A

5.5

8:30

0.0411

MultiRAE Lite (PGM-6208)

12/5/2021

Area A

5.5

13:30

0.0417

MultiRAE Lite (PGM-6208)

12/5/2021

Area A

5.5

17:00

0.0420

MultiRAE Lite (PGM-6208)

12/5/2021

Area B

2.5

8:45

0.0418

MultiRAE Lite (PGM-6208)

12/5/2021

Area B

2.5

13:45

0.0411

MultiRAE Lite (PGM-6208)

12/5/2021

Area B

2.5

16:45

0.0412

MultiRAE Lite (PGM-6208)

12/5/2021

LF WF2

2.5

8:55

0.0423

MultiRAE Lite (PGM-6208)

12/5/2021

LF WF2

2.5

13:55

0.0407

MultiRAE Lite (PGM-6208)

12/5/2021

LF WF1

2.5

9:00

0.0417

MultiRAE Lite (PGM-6208)

12/5/2021

LF WF1

2.5

14:00

0.0428

MultiRAE Lite (PGM-6208)

12/5/2021

Pit C

8

9:20

0.0431

MultiRAE Lite (PGM-6208)

12/5/2021

Pit C

8

14:20

0.0416

MultiRAE Lite (PGM-6208)

12/5/2021

137 Pit C

7

9:35

0.0428

MultiRAE Lite (PGM-6208)

12/5/2021

137 Pit C

7

14:35

0.0411

MultiRAE Lite (PGM-6208)

12/5/2021

137 Pit B

8.6

9:45

0.0415

MultiRAE Lite (PGM-6208)

12/5/2021

137 Pit B

8.6

14:45

0.0412

MultiRAE Lite (PGM-6208)

12/5/2021

137 Pit A

8.3

9:55

0.0412

MultiRAE Lite (PGM-6208)

12/5/2021

137 Pit A

8.3

14:55

0.0422

MultiRAE Lite (PGM-6208)

12/5/2021

WPR1

1.5

10:05

0.0410

MultiRAE Lite (PGM-6208)

12/5/2021

WPR1

1.5

15:05

0.0416

MultiRAE Lite (PGM-6208)

12/5/2021

WPR2

2.8

10:15

0.0421

MultiRAE Lite (PGM-6208)

12/5/2021

WPR2

2.8

15:15

0.0416

MultiRAE Lite (PGM-6208)

12/5/2021

WPR4

4

10:25

0.0424

MultiRAE Lite (PGM-6208)

12/5/2021

WPR4

4

15:25

0.0412

MultiRAE Lite (PGM-6208)

12/5/2021

WPR3

2.8

10:45

0.0413

MultiRAE Lite (PGM-6208)

12/5/2021

WPR3

2.8

15:45

0.0417

MultiRAE Lite (PGM-6208)

12/5/2021

Pit A

5

10:55

0.0420

MultiRAE Lite (PGM-6208)

12/5/2021

Pit A

5

15:55

0.0410

MultiRAE Lite (PGM-6208)

12/5/2021

Pit B

3.6

11:05

0.0431

MultiRAE Lite (PGM-6208)

12/5/2021

Pit B

3.6

16:05

0.0421

MultiRAE Lite (PGM-6208)

13/5/2021

Area A

5.5

8:30

0.0430

MultiRAE Lite (PGM-6208)

13/5/2021

Area A

5.5

13:30

0.0408

MultiRAE Lite (PGM-6208)

13/5/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

13/5/2021

Area B

2.5

8:45

0.0418

MultiRAE Lite (PGM-6208)

13/5/2021

Area B

2.5

13:45

0.0403

MultiRAE Lite (PGM-6208)

13/5/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

13/5/2021

LF WF2

2.5

8:55

0.0418

MultiRAE Lite (PGM-6208)

13/5/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

13/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

13/5/2021

LF WF1

2.5

14:00

0.0424

MultiRAE Lite (PGM-6208)

13/5/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

13/5/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

13/5/2021

137 Pit C

7

9:35

0.0413

MultiRAE Lite (PGM-6208)

13/5/2021

137 Pit C

7

14:35

0.0405

MultiRAE Lite (PGM-6208)

13/5/2021

137 Pit B

8.6

9:45

0.0405

MultiRAE Lite (PGM-6208)

13/5/2021

137 Pit B

8.6

14:45

0.0414

MultiRAE Lite (PGM-6208)

13/5/2021

137 Pit A

8.3

9:55

0.0415

MultiRAE Lite (PGM-6208)

13/5/2021

137 Pit A

8.3

14:55

0.0408

MultiRAE Lite (PGM-6208)

13/5/2021

WPR1

1.5

10:05

0.0415

MultiRAE Lite (PGM-6208)

13/5/2021

WPR1

1.5

15:05

0.0415

MultiRAE Lite (PGM-6208)

13/5/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

13/5/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

13/5/2021

WPR4

4

10:25

0.0412

MultiRAE Lite (PGM-6208)

13/5/2021

WPR4

4

15:25

0.0425

MultiRAE Lite (PGM-6208)

13/5/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

13/5/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

13/5/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

13/5/2021

Pit A

5

15:55

0.0415

MultiRAE Lite (PGM-6208)

13/5/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

13/5/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

14/5/2021

Area A

5.5

8:30

0.0414

MultiRAE Lite (PGM-6208)

14/5/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

14/5/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

14/5/2021

Area B

2.5

8:45

0.0408

MultiRAE Lite (PGM-6208)

14/5/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

14/5/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

14/5/2021

LF WF2

2.5

8:55

0.0405

MultiRAE Lite (PGM-6208)

14/5/2021

LF WF2

2.5

13:55

0.0415

MultiRAE Lite (PGM-6208)

14/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

14/5/2021

LF WF1

2.5

14:00

0.0411

MultiRAE Lite (PGM-6208)

14/5/2021

Pit C

8

9:20

0.0426

MultiRAE Lite (PGM-6208)

14/5/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

14/5/2021

137 Pit C

7

9:35

0.0403

MultiRAE Lite (PGM-6208)

14/5/2021

137 Pit C

7

14:35

0.0422

MultiRAE Lite (PGM-6208)

14/5/2021

137 Pit B

8.6

9:45

0.0415

MultiRAE Lite (PGM-6208)

14/5/2021

137 Pit B

8.6

14:45

0.0414

MultiRAE Lite (PGM-6208)

14/5/2021

137 Pit A

8.3

9:55

0.0405

MultiRAE Lite (PGM-6208)

14/5/2021

137 Pit A

8.3

14:55

0.0415

MultiRAE Lite (PGM-6208)

14/5/2021

WPR1

1.5

10:05

0.0415

MultiRAE Lite (PGM-6208)

14/5/2021

WPR1

1.5

15:05

0.0405

MultiRAE Lite (PGM-6208)

14/5/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

14/5/2021

WPR2

2.8

15:15

0.0425

MultiRAE Lite (PGM-6208)

14/5/2021

WPR4

4

10:25

0.0422

MultiRAE Lite (PGM-6208)

14/5/2021

WPR4

4

15:25

0.0421

MultiRAE Lite (PGM-6208)

14/5/2021

WPR3

2.8

10:45

0.0415

MultiRAE Lite (PGM-6208)

14/5/2021

WPR3

2.8

15:45

0.0414

MultiRAE Lite (PGM-6208)

14/5/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

14/5/2021

Pit A

5

15:55

0.0415

MultiRAE Lite (PGM-6208)

14/5/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

14/5/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

15/5/2021

Area A

5.5

8:30

0.0430

MultiRAE Lite (PGM-6208)

15/5/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

15/5/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

15/5/2021

Area B

2.5

8:45

0.0418

MultiRAE Lite (PGM-6208)

15/5/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

15/5/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

15/5/2021

LF WF2

2.5

8:55

0.0425

MultiRAE Lite (PGM-6208)

15/5/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

15/5/2021

LF WF1

2.5

9:00

0.0414

MultiRAE Lite (PGM-6208)

15/5/2021

LF WF1

2.5

14:00

0.0419

MultiRAE Lite (PGM-6208)

15/5/2021

Pit C

8

9:20

0.0422

MultiRAE Lite (PGM-6208)

15/5/2021

Pit C

8

14:20

0.0424

MultiRAE Lite (PGM-6208)

15/5/2021

137 Pit C

7

9:35

0.0413

MultiRAE Lite (PGM-6208)

15/5/2021

137 Pit C

7

14:35

0.0424

MultiRAE Lite (PGM-6208)

15/5/2021

137 Pit B

8.6

9:45

0.0415

MultiRAE Lite (PGM-6208)

15/5/2021

137 Pit B

8.6

14:45

0.0404

MultiRAE Lite (PGM-6208)

15/5/2021

137 Pit A

8.3

9:55

0.0409

MultiRAE Lite (PGM-6208)

15/5/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

15/5/2021

WPR1

0.6

10:05

0.0415

MultiRAE Lite (PGM-6208)

15/5/2021

WPR1

0.6

15:05

0.0415

MultiRAE Lite (PGM-6208)

15/5/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

15/5/2021

WPR2

2.8

15:15

0.0416

MultiRAE Lite (PGM-6208)

15/5/2021

WPR4

4

10:25

0.0412

MultiRAE Lite (PGM-6208)

15/5/2021

WPR4

4

15:25

0.0425

MultiRAE Lite (PGM-6208)

15/5/2021

WPR3

2.8

10:45

0.0410

MultiRAE Lite (PGM-6208)

15/5/2021

WPR3

2.8

15:45

0.0425

MultiRAE Lite (PGM-6208)

15/5/2021

Pit A

5

10:55

0.0415

MultiRAE Lite (PGM-6208)

15/5/2021

Pit A

5

15:55

0.0411

MultiRAE Lite (PGM-6208)

15/5/2021

Pit B

3.6

11:05

0.0410

MultiRAE Lite (PGM-6208)

15/5/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

17/5/2021

Area A

5.5

8:30

0.0417

MultiRAE Lite (PGM-6208)

17/5/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

17/5/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

17/5/2021

Area B

2.5

8:45

0.0415

MultiRAE Lite (PGM-6208)

17/5/2021

Area B

2.5

13:45

0.0414

MultiRAE Lite (PGM-6208)

17/5/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

17/5/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

17/5/2021

LF WF2

2.5

13:55

0.0415

MultiRAE Lite (PGM-6208)

17/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

17/5/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

17/5/2021

Pit C

8

9:20

0.0429

MultiRAE Lite (PGM-6208)

17/5/2021

Pit C

8

14:20

0.0412

MultiRAE Lite (PGM-6208)

17/5/2021

137 Pit C

7

9:35

0.0435

MultiRAE Lite (PGM-6208)

17/5/2021

137 Pit C

7

14:35

0.0403

MultiRAE Lite (PGM-6208)

17/5/2021

137 Pit B

8.6

9:45

0.0415

MultiRAE Lite (PGM-6208)

17/5/2021

137 Pit B

8.6

14:45

0.0414

MultiRAE Lite (PGM-6208)

17/5/2021

137 Pit A

8.3

9:55

0.0405

MultiRAE Lite (PGM-6208)

17/5/2021

137 Pit A

8.3

14:55

0.0417

MultiRAE Lite (PGM-6208)

17/5/2021

WPR1

0.6

10:05

0.0416

MultiRAE Lite (PGM-6208)

17/5/2021

WPR1

0.6

15:05

0.0421

MultiRAE Lite (PGM-6208)

17/5/2021

WPR2

2.8

10:15

0.0415

MultiRAE Lite (PGM-6208)

17/5/2021

WPR2

2.8

15:15

0.0417

MultiRAE Lite (PGM-6208)

17/5/2021

WPR4

4

10:25

0.0425

MultiRAE Lite (PGM-6208)

17/5/2021

WPR4

4

15:25

0.0417

MultiRAE Lite (PGM-6208)

17/5/2021

WPR3

2.8

10:45

0.0415

MultiRAE Lite (PGM-6208)

17/5/2021

WPR3

2.8

15:45

0.0421

MultiRAE Lite (PGM-6208)

17/5/2021

Pit A

5

10:55

0.0417

MultiRAE Lite (PGM-6208)

17/5/2021

Pit A

5

15:55

0.0410

MultiRAE Lite (PGM-6208)

17/5/2021

Pit B

3.6

11:05

0.0417

MultiRAE Lite (PGM-6208)

17/5/2021

Pit B

3.6

16:05

0.0417

MultiRAE Lite (PGM-6208)

18/5/2021

Area A

5.5

8:30

0.0418

MultiRAE Lite (PGM-6208)

18/5/2021

Area A

5.5

13:30

0.0417

MultiRAE Lite (PGM-6208)

18/5/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

18/5/2021

Area B

2.5

8:45

0.0424

MultiRAE Lite (PGM-6208)

18/5/2021

Area B

2.5

13:45

0.0425

MultiRAE Lite (PGM-6208)

18/5/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

18/5/2021

LF WF2

2.5

8:55

0.0411

MultiRAE Lite (PGM-6208)

18/5/2021

LF WF2

2.5

13:55

0.0418

MultiRAE Lite (PGM-6208)

18/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

18/5/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

18/5/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

18/5/2021

Pit C

8

14:20

0.0411

MultiRAE Lite (PGM-6208)

18/5/2021

137 Pit C

7

9:35

0.0435

MultiRAE Lite (PGM-6208)

18/5/2021

137 Pit C

7

14:35

0.0415

MultiRAE Lite (PGM-6208)

18/5/2021

137 Pit B

8.6

9:45

0.0412

MultiRAE Lite (PGM-6208)

18/5/2021

137 Pit B

8.6

14:45

0.0430

MultiRAE Lite (PGM-6208)

18/5/2021

137 Pit A

8.3

9:55

0.0415

MultiRAE Lite (PGM-6208)

18/5/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

18/5/2021

WPR1

0.6

10:05

0.0415

MultiRAE Lite (PGM-6208)

18/5/2021

WPR1

0.6

15:05

0.0405

MultiRAE Lite (PGM-6208)

18/5/2021

WPR2

2.8

10:15

0.0411

MultiRAE Lite (PGM-6208)

18/5/2021

WPR2

2.8

15:15

0.0421

MultiRAE Lite (PGM-6208)

18/5/2021

WPR4

4

10:25

0.0418

MultiRAE Lite (PGM-6208)

18/5/2021

WPR4

4

15:25

0.0420

MultiRAE Lite (PGM-6208)

18/5/2021

WPR3

2.8

10:45

0.0410

MultiRAE Lite (PGM-6208)

18/5/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

18/5/2021

Pit A

5

10:55

0.0418

MultiRAE Lite (PGM-6208)

18/5/2021

Pit A

5

15:55

0.0421

MultiRAE Lite (PGM-6208)

18/5/2021

Pit B

3.6

11:05

0.0415

MultiRAE Lite (PGM-6208)

18/5/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

20/5/2021

Area A

5.5

8:30

0.0420

MultiRAE Lite (PGM-6208)

20/5/2021

Area A

5.5

13:30

0.0430

MultiRAE Lite (PGM-6208)

20/5/2021

Area A

5.5

17:00

0.0410

MultiRAE Lite (PGM-6208)

20/5/2021

Area B

2.5

8:45

0.0414

MultiRAE Lite (PGM-6208)

20/5/2021

Area B

2.5

13:45

0.0415

MultiRAE Lite (PGM-6208)

20/5/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

20/5/2021

LF WF2

2.5

8:55

0.0405

MultiRAE Lite (PGM-6208)

20/5/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

20/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

20/5/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

20/5/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

20/5/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

20/5/2021

137 Pit C

7

9:35

0.0409

MultiRAE Lite (PGM-6208)

20/5/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

20/5/2021

137 Pit B

8.6

9:45

0.0445

MultiRAE Lite (PGM-6208)

20/5/2021

137 Pit B

8.6

14:45

0.0414

MultiRAE Lite (PGM-6208)

20/5/2021

137 Pit A

8.3

9:55

0.0409

MultiRAE Lite (PGM-6208)

20/5/2021

137 Pit A

8.3

14:55

0.0415

MultiRAE Lite (PGM-6208)

20/5/2021

WPR1

0.6

10:05

0.0410

MultiRAE Lite (PGM-6208)

20/5/2021

WPR1

0.6

15:05

0.0405

MultiRAE Lite (PGM-6208)

20/5/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

20/5/2021

WPR2

2.8

15:15

0.0420

MultiRAE Lite (PGM-6208)

20/5/2021

WPR4

4

10:25

0.0421

MultiRAE Lite (PGM-6208)

20/5/2021

WPR4

4

15:25

0.0425

MultiRAE Lite (PGM-6208)

20/5/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

20/5/2021

WPR3

2.8

15:45

0.0420

MultiRAE Lite (PGM-6208)

20/5/2021

Pit A

5

10:55

0.0425

MultiRAE Lite (PGM-6208)

20/5/2021

Pit A

5

15:55

0.0411

MultiRAE Lite (PGM-6208)

20/5/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

20/5/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

21/5/2021

Area A

5.5

8:30

0.0418

MultiRAE Lite (PGM-6208)

21/5/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

21/5/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

21/5/2021

Area B

2.5

8:45

0.0408

MultiRAE Lite (PGM-6208)

21/5/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

21/5/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

21/5/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

21/5/2021

LF WF2

2.5

13:55

0.0415

MultiRAE Lite (PGM-6208)

21/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

21/5/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

21/5/2021

Pit C

8

9:20

0.0421

MultiRAE Lite (PGM-6208)

21/5/2021

Pit C

8

14:20

0.0415

MultiRAE Lite (PGM-6208)

21/5/2021

137 Pit C

7

9:35

0.0435

MultiRAE Lite (PGM-6208)

21/5/2021

137 Pit C

7

14:35

0.0405

MultiRAE Lite (PGM-6208)

21/5/2021

137 Pit B

8.6

9:45

0.0421

MultiRAE Lite (PGM-6208)

21/5/2021

137 Pit B

8.6

14:45

0.0414

MultiRAE Lite (PGM-6208)

21/5/2021

137 Pit A

8.3

9:55

0.0409

MultiRAE Lite (PGM-6208)

21/5/2021

137 Pit A

8.3

14:55

0.0409

MultiRAE Lite (PGM-6208)

21/5/2021

WPR1

0.6

10:05

0.0415

MultiRAE Lite (PGM-6208)

21/5/2021

WPR1

0.6

15:05

0.0410

MultiRAE Lite (PGM-6208)

21/5/2021

WPR2

2.8

10:15

0.0421

MultiRAE Lite (PGM-6208)

21/5/2021

WPR2

2.8

15:15

0.0410

MultiRAE Lite (PGM-6208)

21/5/2021

WPR4

4

10:25

0.0425

MultiRAE Lite (PGM-6208)

21/5/2021

WPR4

4

15:25

0.0421

MultiRAE Lite (PGM-6208)

21/5/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

21/5/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

21/5/2021

Pit A

5

10:55

0.0411

MultiRAE Lite (PGM-6208)

21/5/2021

Pit A

5

15:55

0.0419

MultiRAE Lite (PGM-6208)

21/5/2021

Pit B

3.6

11:05

0.0418

MultiRAE Lite (PGM-6208)

21/5/2021

Pit B

3.6

16:05

0.0417

MultiRAE Lite (PGM-6208)

22/5/2021

Area A

5.5

8:30

0.0422

MultiRAE Lite (PGM-6208)

22/5/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

22/5/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

22/5/2021

Area B

2.5

8:45

0.0428

MultiRAE Lite (PGM-6208)

22/5/2021

Area B

2.5

13:45

0.0412

MultiRAE Lite (PGM-6208)

22/5/2021

Area B

2.5

16:45

0.0414

MultiRAE Lite (PGM-6208)

22/5/2021

LF WF2

2.5

8:55

0.0425

MultiRAE Lite (PGM-6208)

22/5/2021

LF WF2

2.5

13:55

0.0416

MultiRAE Lite (PGM-6208)

22/5/2021

LF WF1

2.5

9:00

0.0421

MultiRAE Lite (PGM-6208)

22/5/2021

LF WF1

2.5

14:00

0.0410

MultiRAE Lite (PGM-6208)

22/5/2021

Pit C

8

9:20

0.0422

MultiRAE Lite (PGM-6208)

22/5/2021

Pit C

8

14:20

0.0442

MultiRAE Lite (PGM-6208)

22/5/2021

137 Pit C

7

9:35

0.0435

MultiRAE Lite (PGM-6208)

22/5/2021

137 Pit C

7

14:35

0.0413

MultiRAE Lite (PGM-6208)

22/5/2021

137 Pit B

8.6

9:45

0.0424

MultiRAE Lite (PGM-6208)

22/5/2021

137 Pit B

8.6

14:45

0.0415

MultiRAE Lite (PGM-6208)

22/5/2021

137 Pit A

8.3

9:55

0.0425

MultiRAE Lite (PGM-6208)

22/5/2021

137 Pit A

8.3

14:55

0.0424

MultiRAE Lite (PGM-6208)

22/5/2021

WPR1

0.6

10:05

0.0410

MultiRAE Lite (PGM-6208)

22/5/2021

WPR1

0.6

15:05

0.0415

MultiRAE Lite (PGM-6208)

22/5/2021

WPR2

2.8

10:15

0.0415

MultiRAE Lite (PGM-6208)

22/5/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

22/5/2021

WPR4

4

10:25

0.0425

MultiRAE Lite (PGM-6208)

22/5/2021

WPR4

4

15:25

0.0415

MultiRAE Lite (PGM-6208)

22/5/2021

WPR3

2.8

10:45

0.0405

MultiRAE Lite (PGM-6208)

22/5/2021

WPR3

2.8

15:45

0.0414

MultiRAE Lite (PGM-6208)

22/5/2021

Pit A

5

10:55

0.0421

MultiRAE Lite (PGM-6208)

22/5/2021

Pit A

5

15:55

0.0415

MultiRAE Lite (PGM-6208)

22/5/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

22/5/2021

Pit B

3.6

16:05

0.0426

MultiRAE Lite (PGM-6208)

24/5/2021

Area A

5.5

8:30

0.0432

MultiRAE Lite (PGM-6208)

24/5/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

24/5/2021

Area A

5.5

17:00

0.0424

MultiRAE Lite (PGM-6208)

24/5/2021

Area B

2.5

8:45

0.0405

MultiRAE Lite (PGM-6208)

24/5/2021

Area B

2.5

13:45

0.0408

MultiRAE Lite (PGM-6208)

24/5/2021

Area B

2.5

16:45

0.0419

MultiRAE Lite (PGM-6208)

24/5/2021

LF WF2

2.5

8:55

0.0425

MultiRAE Lite (PGM-6208)

24/5/2021

LF WF2

2.5

13:55

0.0415

MultiRAE Lite (PGM-6208)

24/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

24/5/2021

LF WF1

2.5

14:00

0.0421

MultiRAE Lite (PGM-6208)

24/5/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

24/5/2021

Pit C

8

14:20

0.0410

MultiRAE Lite (PGM-6208)

24/5/2021

137 Pit C

7

9:35

0.0421

MultiRAE Lite (PGM-6208)

24/5/2021

137 Pit C

7

14:35

0.0415

MultiRAE Lite (PGM-6208)

24/5/2021

137 Pit B

8.6

9:45

0.0424

MultiRAE Lite (PGM-6208)

24/5/2021

137 Pit B

8.6

14:45

0.0415

MultiRAE Lite (PGM-6208)

24/5/2021

137 Pit A

8.3

9:55

0.0411

MultiRAE Lite (PGM-6208)

24/5/2021

137 Pit A

8.3

14:55

0.0429

MultiRAE Lite (PGM-6208)

24/5/2021

WPR1

2.8

10:05

0.0405

MultiRAE Lite (PGM-6208)

24/5/2021

WPR1

2.8

15:05

0.0411

MultiRAE Lite (PGM-6208)

24/5/2021

WPR2

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

24/5/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

24/5/2021

WPR4

4

10:25

0.0410

MultiRAE Lite (PGM-6208)

24/5/2021

WPR4

4

15:25

0.0425

MultiRAE Lite (PGM-6208)

24/5/2021

WPR3

2.8

10:45

0.0415

MultiRAE Lite (PGM-6208)

24/5/2021

WPR3

2.8

15:45

0.0414

MultiRAE Lite (PGM-6208)

24/5/2021

Pit A

5

10:55

0.0415

MultiRAE Lite (PGM-6208)

24/5/2021

Pit A

5

15:55

0.0411

MultiRAE Lite (PGM-6208)

24/5/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

24/5/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

25/5/2021

Area A

5.5

8:30

0.0421

MultiRAE Lite (PGM-6208)

25/5/2021

Area A

5.5

13:30

0.0430

MultiRAE Lite (PGM-6208)

25/5/2021

Area A

5.5

17:00

0.0405

MultiRAE Lite (PGM-6208)

25/5/2021

Area B

2.5

8:45

0.0421

MultiRAE Lite (PGM-6208)

25/5/2021

Area B

2.5

13:45

0.0411

MultiRAE Lite (PGM-6208)

25/5/2021

Area B

2.5

16:45

0.0420

MultiRAE Lite (PGM-6208)

25/5/2021

LF WF2

2.5

8:55

0.0425

MultiRAE Lite (PGM-6208)

25/5/2021

LF WF2

2.5

13:55

0.0415

MultiRAE Lite (PGM-6208)

25/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

25/5/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

25/5/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

25/5/2021

Pit C

8

14:20

0.0412

MultiRAE Lite (PGM-6208)

25/5/2021

137 Pit C

7

9:35

0.0413

MultiRAE Lite (PGM-6208)

25/5/2021

137 Pit C

7

14:35

0.0425

MultiRAE Lite (PGM-6208)

25/5/2021

137 Pit B

8.6

9:45

0.0414

MultiRAE Lite (PGM-6208)

25/5/2021

137 Pit B

8.6

14:45

0.0411

MultiRAE Lite (PGM-6208)

25/5/2021

137 Pit A

8.3

9:55

0.0425

MultiRAE Lite (PGM-6208)

25/5/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

25/5/2021

WPR1

2.8.

10:05

0.0410

MultiRAE Lite (PGM-6208)

25/5/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

25/5/2021

WPR2

2.8

10:15

0.0425

MultiRAE Lite (PGM-6208)

25/5/2021

WPR2

2.8

15:15

0.0412

MultiRAE Lite (PGM-6208)

25/5/2021

WPR4

4

10:25

0.0420

MultiRAE Lite (PGM-6208)

25/5/2021

WPR4

4

15:25

0.0412

MultiRAE Lite (PGM-6208)

25/5/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

25/5/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

26/5/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

26/5/2021

Pit A

5

15:55

0.0411

MultiRAE Lite (PGM-6208)

26/5/2021

Pit B

3.6

11:05

0.0416

MultiRAE Lite (PGM-6208)

26/5/2021

Pit B

3.6

16:05

0.0406

MultiRAE Lite (PGM-6208)

26/5/2021

Area A

5.5

8:30

0.0426

MultiRAE Lite (PGM-6208)

26/5/2021

Area A

5.5

13:30

0.0421

MultiRAE Lite (PGM-6208)

26/5/2021

Area A

5.5

17:00

0.0411

MultiRAE Lite (PGM-6208)

26/5/2021

Area B

2.5

8:45

0.0415

MultiRAE Lite (PGM-6208)

26/5/2021

Area B

2.5

13:45

0.0421

MultiRAE Lite (PGM-6208)

26/5/2021

Area B

2.5

16:45

0.0413

MultiRAE Lite (PGM-6208)

26/5/2021

LF WF2

2.5

8:55

0.0413

MultiRAE Lite (PGM-6208)

26/5/2021

LF WF2

2.5

13:55

0.0415

MultiRAE Lite (PGM-6208)

26/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

26/5/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

26/5/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

26/5/2021

Pit C

8

14:20

0.0412

MultiRAE Lite (PGM-6208)

26/5/2021

137 Pit C

7

9:35

0.0435

MultiRAE Lite (PGM-6208)

26/5/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

26/5/2021

137 Pit B

8.6

9:45

0.0409

MultiRAE Lite (PGM-6208)

26/5/2021

137 Pit B

8.6

14:45

0.0425

MultiRAE Lite (PGM-6208)

26/5/2021

137 Pit A

8.3

9:55

0.0409

MultiRAE Lite (PGM-6208)

26/5/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

26/5/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

26/5/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

26/5/2021

WPR2

2.8

10:15

0.0421

MultiRAE Lite (PGM-6208)

26/5/2021

WPR2

2.8

15:15

0.0410

MultiRAE Lite (PGM-6208)

26/5/2021

WPR4

4

10:25

0.0415

MultiRAE Lite (PGM-6208)

26/5/2021

WPR4

4

15:25

0.0411

MultiRAE Lite (PGM-6208)

26/5/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

26/5/2021

WPR3

2.8

15:45

0.0425

MultiRAE Lite (PGM-6208)

26/5/2021

Pit A

5

10:55

0.0415

MultiRAE Lite (PGM-6208)

26/5/2021

Pit A

5

15:55

0.0411

MultiRAE Lite (PGM-6208)

26/5/2021

Pit B

3.6

11:05

0.0416

MultiRAE Lite (PGM-6208)

26/5/2021

Pit B

3.6

16:05

0.0415

MultiRAE Lite (PGM-6208)

27/5/2021

Area A

5.5

8:30

0.0430

MultiRAE Lite (PGM-6208)

27/5/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

27/5/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

27/5/2021

Area B

2.5

8:45

0.0418

MultiRAE Lite (PGM-6208)

27/5/2021

Area B

2.5

13:45

0.0415

MultiRAE Lite (PGM-6208)

27/5/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

27/5/2021

LF WF2

2.5

8:55

0.0405

MultiRAE Lite (PGM-6208)

27/5/2021

LF WF2

2.5

13:55

0.0435

MultiRAE Lite (PGM-6208)

27/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

27/5/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

27/5/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

27/5/2021

Pit C

8

14:20

0.0420

MultiRAE Lite (PGM-6208)

27/5/2021

137 Pit C

7

9:35

0.0413

MultiRAE Lite (PGM-6208)

27/5/2021

137 Pit C

7

14:35

0.0430

MultiRAE Lite (PGM-6208)

27/5/2021

137 Pit B

8.6

9:45

0.0414

MultiRAE Lite (PGM-6208)

27/5/2021

137 Pit B

8.6

14:45

0.0415

MultiRAE Lite (PGM-6208)

27/5/2021

137 Pit A

8.3

9:55

0.0415

MultiRAE Lite (PGM-6208)

27/5/2021

137 Pit A

8.3

14:55

0.0424

MultiRAE Lite (PGM-6208)

27/5/2021

WPR1

1.5

10:05

0.0407

MultiRAE Lite (PGM-6208)

27/5/2021

WPR1

1.5

15:05

0.0425

MultiRAE Lite (PGM-6208)

27/5/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

27/5/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

27/5/2021

WPR4

4

10:25

0.0412

MultiRAE Lite (PGM-6208)

27/5/2021

WPR4

4

15:25

0.0412

MultiRAE Lite (PGM-6208)

27/5/2021

WPR3

2.8

10:45

0.0405

MultiRAE Lite (PGM-6208)

27/5/2021

WPR3

2.8

15:45

0.0417

MultiRAE Lite (PGM-6208)

27/5/2021

Pit A

5

10:55

0.0425

MultiRAE Lite (PGM-6208)

27/5/2021

Pit A

5

15:55

0.0417

MultiRAE Lite (PGM-6208)

27/5/2021

Pit B

3.6

11:05

0.0416

MultiRAE Lite (PGM-6208)

27/5/2021

Pit B

3.6

16:05

0.0412

MultiRAE Lite (PGM-6208)

28/5/2021

Area A

5.5

8:30

0.0438

MultiRAE Lite (PGM-6208)

28/5/2021

Area A

5.5

13:30

0.0412

MultiRAE Lite (PGM-6208)

28/5/2021

Area A

5.5

17:00

0.0410

MultiRAE Lite (PGM-6208)

28/5/2021

Area B

2.5

8:45

0.0409

MultiRAE Lite (PGM-6208)

28/5/2021

Area B

2.5

13:45

0.0415

MultiRAE Lite (PGM-6208)

28/5/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

28/5/2021

LF WF2

2.5

8:55

0.0418

MultiRAE Lite (PGM-6208)

28/5/2021

LF WF2

2.5

13:55

0.0415

MultiRAE Lite (PGM-6208)

28/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

28/5/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

28/5/2021

Pit C

8

9:20

0.0409

MultiRAE Lite (PGM-6208)

28/5/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

28/5/2021

137 Pit C

7

9:35

0.0415

MultiRAE Lite (PGM-6208)

28/5/2021

137 Pit C

7

14:35

0.0418

MultiRAE Lite (PGM-6208)

28/5/2021

137 Pit B

8.6

9:45

0.0415

MultiRAE Lite (PGM-6208)

28/5/2021

137 Pit B

8.6

14:45

0.0420

MultiRAE Lite (PGM-6208)

28/5/2021

137 Pit A

8.3

9:55

0.0419

MultiRAE Lite (PGM-6208)

28/5/2021

137 Pit A

8.3

14:55

0.0418

MultiRAE Lite (PGM-6208)

28/5/2021

WPR1

2.8

10:05

0.0420

MultiRAE Lite (PGM-6208)

28/5/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

28/5/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

28/5/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

28/5/2021

WPR4

4

10:25

0.0421

MultiRAE Lite (PGM-6208)

28/5/2021

WPR4

4

15:25

0.0425

MultiRAE Lite (PGM-6208)

28/5/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

28/5/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

28/5/2021

Pit A

5

10:55

0.0405

MultiRAE Lite (PGM-6208)

28/5/2021

Pit A

5

15:55

0.0415

MultiRAE Lite (PGM-6208)

28/5/2021

Pit B

3.6

11:05

0.0421

MultiRAE Lite (PGM-6208)

28/5/2021

Pit B

3.6

16:05

0.0408

MultiRAE Lite (PGM-6208)

29/5/2021

Area A

5.5

8:30

0.0430

MultiRAE Lite (PGM-6208)

29/5/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

29/5/2021

Area A

5.5

17:00

0.0407

MultiRAE Lite (PGM-6208)

29/5/2021

Area B

2.5

8:45

0.0424

MultiRAE Lite (PGM-6208)

29/5/2021

Area B

2.5

13:45

0.0412

MultiRAE Lite (PGM-6208)

29/5/2021

Area B

2.5

16:45

0.0413

MultiRAE Lite (PGM-6208)

29/5/2021

LF WF2

2.5

8:55

0.0421

MultiRAE Lite (PGM-6208)

29/5/2021

LF WF2

2.5

13:55

0.0415

MultiRAE Lite (PGM-6208)

29/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

29/5/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

29/5/2021

Pit C

8

9:20

0.0421

MultiRAE Lite (PGM-6208)

29/5/2021

Pit C

8

14:20

0.0411

MultiRAE Lite (PGM-6208)

29/5/2021

137 Pit C

7

9:35

0.0415

MultiRAE Lite (PGM-6208)

29/5/2021

137 Pit C

7

14:35

0.0419

MultiRAE Lite (PGM-6208)

29/5/2021

137 Pit B

8.6

9:45

0.0417

MultiRAE Lite (PGM-6208)

29/5/2021

137 Pit B

8.6

14:45

0.0423

MultiRAE Lite (PGM-6208)

29/5/2021

137 Pit A

8.3

9:55

0.0422

MultiRAE Lite (PGM-6208)

29/5/2021

137 Pit A

8.3

14:55

0.0419

MultiRAE Lite (PGM-6208)

29/5/2021

WPR1

2.8

10:05

0.0414

MultiRAE Lite (PGM-6208)

29/5/2021

WPR1

2.8

15:05

0.0411

MultiRAE Lite (PGM-6208)

29/5/2021

WPR2

2.8

10:15

0.0420

MultiRAE Lite (PGM-6208)

29/5/2021

WPR2

2.8

15:15

0.0421

MultiRAE Lite (PGM-6208)

29/5/2021

WPR4

4

10:25

0.0415

MultiRAE Lite (PGM-6208)

29/5/2021

WPR4

4

15:25

0.0421

MultiRAE Lite (PGM-6208)

29/5/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

29/5/2021

WPR3

2.8

15:45

0.0421

MultiRAE Lite (PGM-6208)

29/5/2021

Pit A

5

10:55

0.0416

MultiRAE Lite (PGM-6208)

29/5/2021

Pit A

5

15:55

0.0428

MultiRAE Lite (PGM-6208)

29/5/2021

Pit B

3.6

11:05

0.0410

MultiRAE Lite (PGM-6208)

29/5/2021

Pit B

3.6

16:05

0.0415

MultiRAE Lite (PGM-6208)

31/5/2021

Area A

5.5

8:30

0.0418

MultiRAE Lite (PGM-6208)

31/5/2021

Area A

5.5

13:30

0.0431

MultiRAE Lite (PGM-6208)

31/5/2021

Area A

5.5

17:00

0.0412

MultiRAE Lite (PGM-6208)

31/5/2021

Area B

2.5

8:45

0.0415

MultiRAE Lite (PGM-6208)

31/5/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

31/5/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

31/5/2021

LF WF2

2.5

8:55

0.0415

MultiRAE Lite (PGM-6208)

31/5/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

31/5/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

31/5/2021

LF WF1

2.5

14:00

0.0409

MultiRAE Lite (PGM-6208)

31/5/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

31/5/2021

Pit C

8

14:20

0.0415

MultiRAE Lite (PGM-6208)

31/5/2021

137 Pit C

7

9:35

0.0413

MultiRAE Lite (PGM-6208)

31/5/2021

137 Pit C

7

14:35

0.0421

MultiRAE Lite (PGM-6208)

31/5/2021

137 Pit B

8.6

9:45

0.0421

MultiRAE Lite (PGM-6208)

31/5/2021

137 Pit B

8.6

14:45

0.0422

MultiRAE Lite (PGM-6208)

31/5/2021

137 Pit A

8.3

9:55

0.0416

MultiRAE Lite (PGM-6208)

31/5/2021

137 Pit A

8.3

14:55

0.0419

MultiRAE Lite (PGM-6208)

31/5/2021

WPR1

2.8

10:05

0.0420

MultiRAE Lite (PGM-6208)

31/5/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

31/5/2021

WPR2

2.8

10:15

0.0416

MultiRAE Lite (PGM-6208)

31/5/2021

WPR2

2.8

15:15

0.0419

MultiRAE Lite (PGM-6208)

31/5/2021

WPR4

4

10:25

0.0429

MultiRAE Lite (PGM-6208)

31/5/2021

WPR4

4

15:25

0.0411

MultiRAE Lite (PGM-6208)

31/5/2021

WPR3

2.8

10:45

0.0406

MultiRAE Lite (PGM-6208)

31/5/2021

WPR3

2.8

15:45

0.0414

MultiRAE Lite (PGM-6208)

31/5/2021

Pit A

5

10:55

0.0429

MultiRAE Lite (PGM-6208)

31/5/2021

Pit A

5

15:55

0.0410

MultiRAE Lite (PGM-6208)

31/5/2021

Pit B

3.6

11:05

0.0415

MultiRAE Lite (PGM-6208)

31/5/2021

Pit B

3.6

16:05

0.0411

MultiRAE Lite (PGM-6208)

1/6/2021

Area A

5.5

8:30

0.0417

MultiRAE Lite (PGM-6208)

1/6/2021

Area A

5.5

13:30

0.0422

MultiRAE Lite (PGM-6208)

1/6/2021

Area A

5.5

17:00

0.0419

MultiRAE Lite (PGM-6208)

1/6/2021

Area B

2.5

8:45

0.0404

MultiRAE Lite (PGM-6208)

1/6/2021

Area B

2.5

13:45

0.0412

MultiRAE Lite (PGM-6208)

1/6/2021

Area B

2.5

16:45

0.0422

MultiRAE Lite (PGM-6208)

1/6/2021

LF WF2

2.5

8:55

0.0418

MultiRAE Lite (PGM-6208)

1/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

1/6/2021

LF WF1

2.5

9:00

0.0422

MultiRAE Lite (PGM-6208)

1/6/2021

LF WF1

2.5

14:00

0.0426

MultiRAE Lite (PGM-6208)

1/6/2021

Pit C

8

9:20

0.0419

MultiRAE Lite (PGM-6208)

1/6/2021

Pit C

8

14:20

0.0420

MultiRAE Lite (PGM-6208)

1/6/2021

137 Pit C

7

9:35

0.0429

MultiRAE Lite (PGM-6208)

1/6/2021

137 Pit C

7

14:35

0.0409

MultiRAE Lite (PGM-6208)

1/6/2021

137 Pit B

8.6

9:45

0.0420

MultiRAE Lite (PGM-6208)

1/6/2021

137 Pit B

8.6

14:45

0.0410

MultiRAE Lite (PGM-6208)

1/6/2021

137 Pit A

8.3

9:55

0.0412

MultiRAE Lite (PGM-6208)

1/6/2021

137 Pit A

8.3

14:55

0.0417

MultiRAE Lite (PGM-6208)

1/6/2021

WPR1

1.5

10:05

0.0426

MultiRAE Lite (PGM-6208)

1/6/2021

WPR1

1.5

15:05

0.0406

MultiRAE Lite (PGM-6208)

1/6/2021

WPR2

2.8

10:15

0.0418

MultiRAE Lite (PGM-6208)

1/6/2021

WPR2

2.8

15:15

0.0414

MultiRAE Lite (PGM-6208)

1/6/2021

WPR4

4

10:25

0.0420

MultiRAE Lite (PGM-6208)

1/6/2021

WPR4

4

15:25

0.0411

MultiRAE Lite (PGM-6208)

1/6/2021

WPR3

2.8

10:45

0.0429

MultiRAE Lite (PGM-6208)

1/6/2021

WPR3

2.8

15:45

0.0403

MultiRAE Lite (PGM-6208)

1/6/2021

Pit A

5

10:55

0.0415

MultiRAE Lite (PGM-6208)

1/6/2021

Pit A

5

15:55

0.0416

MultiRAE Lite (PGM-6208)

1/6/2021

Pit B

3.6

11:05

0.0423

MultiRAE Lite (PGM-6208)

1/6/2021

Pit B

3.6

16:05

0.0419

MultiRAE Lite (PGM-6208)

2/6/2021

Area A

5.5

8:30

0.0430

MultiRAE Lite (PGM-6208)

2/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

2/6/2021

Area A

5.5

17:00

0.0407

MultiRAE Lite (PGM-6208)

2/6/2021

Area B

2.5

8:45

0.0415

MultiRAE Lite (PGM-6208)

2/6/2021

Area B

2.5

13:45

0.0414

MultiRAE Lite (PGM-6208)

2/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

2/6/2021

LF WF2

2.5

8:55

0.0415

MultiRAE Lite (PGM-6208)

2/6/2021

LF WF2

2.5

13:55

0.0408

MultiRAE Lite (PGM-6208)

2/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

2/6/2021

LF WF1

2.5

14:00

0.0419

MultiRAE Lite (PGM-6208)

2/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

2/6/2021

Pit C

8

14:20

0.0412

MultiRAE Lite (PGM-6208)

2/6/2021

137 Pit C

7

9:35

0.0405

MultiRAE Lite (PGM-6208)

2/6/2021

137 Pit C

7

14:35

0.0420

MultiRAE Lite (PGM-6208)

2/6/2021

137 Pit B

8.6

9:45

0.0414

MultiRAE Lite (PGM-6208)

2/6/2021

137 Pit B

8.6

14:45

0.0415

MultiRAE Lite (PGM-6208)

2/6/2021

137 Pit A

8.3

9:55

0.0408

MultiRAE Lite (PGM-6208)

2/6/2021

137 Pit A

8.3

14:55

0.0422

MultiRAE Lite (PGM-6208)

2/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

2/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

2/6/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

2/6/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

2/6/2021

WPR4

4

10:25

0.0412

MultiRAE Lite (PGM-6208)

2/6/2021

WPR4

4

15:25

0.0415

MultiRAE Lite (PGM-6208)

2/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

2/6/2021

WPR3

2.8

15:45

0.0425

MultiRAE Lite (PGM-6208)

2/6/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

2/6/2021

Pit A

5

15:55

0.0414

MultiRAE Lite (PGM-6208)

2/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

2/6/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

3/6/2021

Area A

5.5

8:30

0.0408

MultiRAE Lite (PGM-6208)

3/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

3/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

3/6/2021

Area B

2.5

8:45

0.0404

MultiRAE Lite (PGM-6208)

3/6/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

3/6/2021

Area B

2.5

16:45

0.0424

MultiRAE Lite (PGM-6208)

3/6/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

3/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

3/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

3/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

3/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

3/6/2021

Pit C

8

14:20

0.0412

MultiRAE Lite (PGM-6208)

3/6/2021

137 Pit C

7

9:35

0.0435

MultiRAE Lite (PGM-6208)

3/6/2021

137 Pit C

7

14:35

0.0421

MultiRAE Lite (PGM-6208)

3/6/2021

137 Pit B

8.6

9:45

0.0429

MultiRAE Lite (PGM-6208)

3/6/2021

137 Pit B

8.6

14:45

0.0401

MultiRAE Lite (PGM-6208)

3/6/2021

137 Pit A

8.3

9:55

0.0405

MultiRAE Lite (PGM-6208)

3/6/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

3/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

3/6/2021

WPR1

2.8

15:05

0.0407

MultiRAE Lite (PGM-6208)

3/6/2021

WPR2

2.8

10:15

0.0413

MultiRAE Lite (PGM-6208)

3/6/2021

WPR2

2.8

15:15

0.0428

MultiRAE Lite (PGM-6208)

3/6/2021

WPR4

4

10:25

0.0425

MultiRAE Lite (PGM-6208)

3/6/2021

WPR4

4

15:25

0.0403

MultiRAE Lite (PGM-6208)

3/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

3/6/2021

WPR3

2.8

15:45

0.0426

MultiRAE Lite (PGM-6208)

3/6/2021

Pit A

5

10:55

0.0406

MultiRAE Lite (PGM-6208)

3/6/2021

Pit A

5

15:55

0.0422

MultiRAE Lite (PGM-6208)

3/6/2021

Pit B

3.6

11:05

0.0418

MultiRAE Lite (PGM-6208)

3/6/2021

Pit B

3.6

16:05

0.0406

MultiRAE Lite (PGM-6208)

4/6/2021

Area A

5.5

8:30

0.0414

MultiRAE Lite (PGM-6208)

4/6/2021

Area A

5.5

13:30

0.0427

MultiRAE Lite (PGM-6208)

4/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

4/6/2021

Area B

2.5

8:45

0.0414

MultiRAE Lite (PGM-6208)

4/6/2021

Area B

2.5

13:45

0.0431

MultiRAE Lite (PGM-6208)

4/6/2021

Area B

2.5

16:45

0.0419

MultiRAE Lite (PGM-6208)

4/6/2021

LF WF2

2.5

8:55

0.0428

MultiRAE Lite (PGM-6208)

4/6/2021

LF WF2

2.5

13:55

0.0405

MultiRAE Lite (PGM-6208)

4/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

4/6/2021

LF WF1

2.5

14:00

0.0416

MultiRAE Lite (PGM-6208)

4/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

4/6/2021

Pit C

8

14:20

0.0412

MultiRAE Lite (PGM-6208)

4/6/2021

137 Pit C

7

9:35

0.0413

MultiRAE Lite (PGM-6208)

4/6/2021

137 Pit C

7

14:35

0.0425

MultiRAE Lite (PGM-6208)

4/6/2021

137 Pit B

8.6

9:45

0.0409

MultiRAE Lite (PGM-6208)

4/6/2021

137 Pit B

8.6

14:45

0.0442

MultiRAE Lite (PGM-6208)

4/6/2021

137 Pit A

8.3

9:55

0.0409

MultiRAE Lite (PGM-6208)

4/6/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

4/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

4/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

4/6/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

4/6/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

4/6/2021

WPR4

4

10:25

0.0425

MultiRAE Lite (PGM-6208)

4/6/2021

WPR4

4

15:25

0.0412

MultiRAE Lite (PGM-6208)

4/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

4/6/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

4/6/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

4/6/2021

Pit A

5

15:55

0.0415

MultiRAE Lite (PGM-6208)

4/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

4/6/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

5/6/2021

Area A

5.5

8:30

0.0405

MultiRAE Lite (PGM-6208)

5/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

5/6/2021

Area A

5.5

17:00

0.0407

MultiRAE Lite (PGM-6208)

5/6/2021

Area B

2.5

8:45

0.0421

MultiRAE Lite (PGM-6208)

5/6/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

5/6/2021

Area B

2.5

16:45

0.0418

MultiRAE Lite (PGM-6208)

5/6/2021

LF WF2

2.5

8:55

0.0405

MultiRAE Lite (PGM-6208)

5/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

5/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

5/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

5/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

5/6/2021

Pit C

8

14:20

0.0424

MultiRAE Lite (PGM-6208)

5/6/2021

137 Pit C

7

9:35

0.0413

MultiRAE Lite (PGM-6208)

5/6/2021

137 Pit C

7

14:35

0.0415

MultiRAE Lite (PGM-6208)

5/6/2021

137 Pit B

8.6

9:45

0.0407

MultiRAE Lite (PGM-6208)

5/6/2021

137 Pit B

8.6

14:45

0.0414

MultiRAE Lite (PGM-6208)

5/6/2021

137 Pit A

8.3

9:55

0.0405

MultiRAE Lite (PGM-6208)

5/6/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

5/6/2021

WPR1

2.8

10:05

0.0415

MultiRAE Lite (PGM-6208)

5/6/2021

WPR1

2.8

15:05

0.0410

MultiRAE Lite (PGM-6208)

5/6/2021

WPR2

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

5/6/2021

WPR2

2.8

15:15

0.0421

MultiRAE Lite (PGM-6208)

5/6/2021

WPR4

4

10:25

0.0422

MultiRAE Lite (PGM-6208)

5/6/2021

WPR4

4

15:25

0.0415

MultiRAE Lite (PGM-6208)

5/6/2021

WPR3

2.8

10:45

0.0417

MultiRAE Lite (PGM-6208)

5/6/2021

WPR3

2.8

15:45

0.0420

MultiRAE Lite (PGM-6208)

5/6/2021

Pit A

5

10:55

0.0416

MultiRAE Lite (PGM-6208)

5/6/2021

Pit A

5

15:55

0.0412

MultiRAE Lite (PGM-6208)

5/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

5/6/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

7/6/2021

Area A

5.5

8:30

0.0416

MultiRAE Lite (PGM-6208)

7/6/2021

Area A

5.5

13:30

0.0418

MultiRAE Lite (PGM-6208)

7/6/2021

Area A

5.5

17:00

0.0430

MultiRAE Lite (PGM-6208)

7/6/2021

Area B

2.5

8:45

0.0420

MultiRAE Lite (PGM-6208)

7/6/2021

Area B

2.5

13:45

0.0414

MultiRAE Lite (PGM-6208)

7/6/2021

Area B

2.5

16:45

0.0419

MultiRAE Lite (PGM-6208)

7/6/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

7/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

7/6/2021

LF WF1

2.5

9:00

0.0427

MultiRAE Lite (PGM-6208)

7/6/2021

LF WF1

2.5

14:00

0.0421

MultiRAE Lite (PGM-6208)

7/6/2021

Pit C

8

9:20

0.0412

MultiRAE Lite (PGM-6208)

7/6/2021

Pit C

8

14:20

0.0426

MultiRAE Lite (PGM-6208)

7/6/2021

137 Pit C

7

9:35

0.0415

MultiRAE Lite (PGM-6208)

7/6/2021

137 Pit C

7

14:35

0.0422

MultiRAE Lite (PGM-6208)

7/6/2021

137 Pit B

8.6

9:45

0.0429

MultiRAE Lite (PGM-6208)

7/6/2021

137 Pit B

8.6

14:45

0.0414

MultiRAE Lite (PGM-6208)

7/6/2021

137 Pit A

8.3

9:55

0.0419

MultiRAE Lite (PGM-6208)

7/6/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

7/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

7/6/2021

WPR1

2.8

15:05

0.0408

MultiRAE Lite (PGM-6208)

7/6/2021

WPR2

2.8

10:15

0.0419

MultiRAE Lite (PGM-6208)

7/6/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

7/6/2021

WPR4

4

10:25

0.0425

MultiRAE Lite (PGM-6208)

7/6/2021

WPR4

4

15:25

0.0410

MultiRAE Lite (PGM-6208)

7/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

7/6/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

7/6/2021

Pit A

5

10:55

0.0451

MultiRAE Lite (PGM-6208)

7/6/2021

Pit A

5

15:55

0.0425

MultiRAE Lite (PGM-6208)

7/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

7/6/2021

Pit B

3.6

16:05

0.0413

MultiRAE Lite (PGM-6208)

8/6/2021

Area A

5.5

8:30

0.0419

MultiRAE Lite (PGM-6208)

8/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

8/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

8/6/2021

Area B

2.5

8:45

0.0408

MultiRAE Lite (PGM-6208)

8/6/2021

Area B

2.5

13:45

0.0415

MultiRAE Lite (PGM-6208)

8/6/2021

Area B

2.5

16:45

0.0414

MultiRAE Lite (PGM-6208)

8/6/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

8/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

8/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

8/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

8/6/2021

Pit C

8

9:20

0.0412

MultiRAE Lite (PGM-6208)

8/6/2021

Pit C

8

14:20

0.0410

MultiRAE Lite (PGM-6208)

8/6/2021

137 Pit C

7

9:35

0.0415

MultiRAE Lite (PGM-6208)

8/6/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

8/6/2021

137 Pit B

8.6

9:45

0.0424

MultiRAE Lite (PGM-6208)

8/6/2021

137 Pit B

8.6

14:45

0.0415

MultiRAE Lite (PGM-6208)

8/6/2021

137 Pit A

8.3

9:55

0.0405

MultiRAE Lite (PGM-6208)

8/6/2021

137 Pit A

8.3

14:55

0.0426

MultiRAE Lite (PGM-6208)

8/6/2021

WPR1

2.8

10:05

0.0420

MultiRAE Lite (PGM-6208)

8/6/2021

WPR1

2.8

15:05

0.0410

MultiRAE Lite (PGM-6208)

8/6/2021

WPR2

2.8

10:15

0.0408

MultiRAE Lite (PGM-6208)

8/6/2021

WPR2

2.8

15:15

0.0416

MultiRAE Lite (PGM-6208)

8/6/2021

WPR4

4

10:25

0.0419

MultiRAE Lite (PGM-6208)

8/6/2021

WPR4

4

15:25

0.0408

MultiRAE Lite (PGM-6208)

8/6/2021

WPR3

2.8

10:45

0.0415

MultiRAE Lite (PGM-6208)

8/6/2021

WPR3

2.8

15:45

0.0416

MultiRAE Lite (PGM-6208)

9/6/2021

Pit A

5

10:55

0.0405

MultiRAE Lite (PGM-6208)

9/6/2021

Pit A

5

15:55

0.0418

MultiRAE Lite (PGM-6208)

9/6/2021

Pit B

3.6

11:05

0.0422

MultiRAE Lite (PGM-6208)

9/6/2021

Pit B

3.6

16:05

0.0427

MultiRAE Lite (PGM-6208)

9/6/2021

Area A

5.5

8:30

0.0418

MultiRAE Lite (PGM-6208)

9/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

9/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

9/6/2021

Area B

2.5

8:45

0.0415

MultiRAE Lite (PGM-6208)

9/6/2021

Area B

2.5

13:45

0.0423

MultiRAE Lite (PGM-6208)

9/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

9/6/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

9/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

9/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

9/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

9/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

9/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

9/6/2021

137 Pit C

7

9:35

0.0414

MultiRAE Lite (PGM-6208)

9/6/2021

137 Pit C

7

14:35

0.0413

MultiRAE Lite (PGM-6208)

9/6/2021

137 Pit B

8.6

9:45

0.0409

MultiRAE Lite (PGM-6208)

9/6/2021

137 Pit B

8.6

14:45

0.0415

MultiRAE Lite (PGM-6208)

9/6/2021

137 Pit A

8.3

9:55

0.0409

MultiRAE Lite (PGM-6208)

9/6/2021

137 Pit A

8.3

14:55

0.0415

MultiRAE Lite (PGM-6208)

9/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

9/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

9/6/2021

WPR2

2.8

10:15

0.0409

MultiRAE Lite (PGM-6208)

9/6/2021

WPR2

2.8

15:15

0.0421

MultiRAE Lite (PGM-6208)

9/6/2021

WPR4

4

10:25

0.0419

MultiRAE Lite (PGM-6208)

9/6/2021

WPR4

4

15:25

0.0425

MultiRAE Lite (PGM-6208)

9/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

9/6/2021

WPR3

2.8

15:45

0.0411

MultiRAE Lite (PGM-6208)

10/6/2021

Pit A

5

10:55

0.0480

MultiRAE Lite (PGM-6208)

10/6/2021

Pit A

5

15:55

0.0426

MultiRAE Lite (PGM-6208)

10/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

10/6/2021

Pit B

3.6

16:05

0.0406

MultiRAE Lite (PGM-6208)

10/6/2021

Area A

5.5

8:30

0.0416

MultiRAE Lite (PGM-6208)

10/6/2021

Area A

5.5

13:30

0.0422

MultiRAE Lite (PGM-6208)

10/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

10/6/2021

Area B

2.5

8:45

0.0428

MultiRAE Lite (PGM-6208)

10/6/2021

Area B

2.5

13:45

0.0431

MultiRAE Lite (PGM-6208)

10/6/2021

Area B

2.5

16:45

0.0406

MultiRAE Lite (PGM-6208)

10/6/2021

LF WF2

2.5

8:55

0.0411

MultiRAE Lite (PGM-6208)

10/6/2021

LF WF2

2.5

13:55

0.0420

MultiRAE Lite (PGM-6208)

10/6/2021

LF WF1

2.5

9:00

0.0418

MultiRAE Lite (PGM-6208)

10/6/2021

LF WF1

2.5

14:00

0.0412

MultiRAE Lite (PGM-6208)

10/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

10/6/2021

Pit C

8

14:20

0.0412

MultiRAE Lite (PGM-6208)

10/6/2021

137 Pit C

7

9:35

0.0415

MultiRAE Lite (PGM-6208)

10/6/2021

137 Pit C

7

14:35

0.0413

MultiRAE Lite (PGM-6208)

10/6/2021

137 Pit B

8.6

9:45

0.0413

MultiRAE Lite (PGM-6208)

10/6/2021

137 Pit B

8.6

14:45

0.0419

MultiRAE Lite (PGM-6208)

10/6/2021

137 Pit A

8.3

9:55

0.0415

MultiRAE Lite (PGM-6208)

10/6/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

10/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

10/6/2021

WPR1

2.8

15:05

0.0421

MultiRAE Lite (PGM-6208)

10/6/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

10/6/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

10/6/2021

WPR4

4

10:25

0.0425

MultiRAE Lite (PGM-6208)

10/6/2021

WPR4

4

15:25

0.0412

MultiRAE Lite (PGM-6208)

10/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

10/6/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

10/6/2021

Pit A

5

10:55

0.0416

MultiRAE Lite (PGM-6208)

10/6/2021

Pit A

5

15:55

0.0415

MultiRAE Lite (PGM-6208)

10/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

10/6/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

11/6/2021

Area A

5.5

8:30

0.0430

MultiRAE Lite (PGM-6208)

11/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

11/6/2021

Area A

5.5

17:00

0.0427

MultiRAE Lite (PGM-6208)

11/6/2021

Area B

2.5

8:45

0.0418

MultiRAE Lite (PGM-6208)

11/6/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

11/6/2021

Area B

2.5

16:45

0.0421

MultiRAE Lite (PGM-6208)

11/6/2021

LF WF2

2.5

8:55

0.0415

MultiRAE Lite (PGM-6208)

11/6/2021

LF WF2

2.5

13:55

0.0408

MultiRAE Lite (PGM-6208)

11/6/2021

LF WF1

2.5

9:00

0.0412

MultiRAE Lite (PGM-6208)

11/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

11/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

11/6/2021

Pit C

8

14:20

0.0422

MultiRAE Lite (PGM-6208)

11/6/2021

137 Pit C

7

9:35

0.0412

MultiRAE Lite (PGM-6208)

11/6/2021

137 Pit C

7

14:35

0.0417

MultiRAE Lite (PGM-6208)

11/6/2021

137 Pit B

8.6

9:45

0.0430

MultiRAE Lite (PGM-6208)

11/6/2021

137 Pit B

8.6

14:45

0.0411

MultiRAE Lite (PGM-6208)

11/6/2021

137 Pit A

8.3

9:55

0.0415

MultiRAE Lite (PGM-6208)

11/6/2021

137 Pit A

8.3

14:55

0.0421

MultiRAE Lite (PGM-6208)

11/6/2021

WPR1

2.8

10:05

0.0418

MultiRAE Lite (PGM-6208)

11/6/2021

WPR1

2.8

15:05

0.0426

MultiRAE Lite (PGM-6208)

11/6/2021

WPR2

2.8

10:15

0.0415

MultiRAE Lite (PGM-6208)

11/6/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

11/6/2021

WPR4

4

10:25

0.0420

MultiRAE Lite (PGM-6208)

11/6/2021

WPR4

4

15:25

0.0415

MultiRAE Lite (PGM-6208)

11/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

11/6/2021

WPR3

2.8

15:45

0.0413

MultiRAE Lite (PGM-6208)

11/6/2021

Pit A

5

10:55

0.0406

MultiRAE Lite (PGM-6208)

11/6/2021

Pit A

5

15:55

0.0421

MultiRAE Lite (PGM-6208)

11/6/2021

Pit B

3.6

11:05

0.0418

MultiRAE Lite (PGM-6208)

11/6/2021

Pit B

3.6

16:05

0.0426

MultiRAE Lite (PGM-6208)

12/6/2021

Area A

5.5

8:30

0.0412

MultiRAE Lite (PGM-6208)

12/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

12/6/2021

Area A

5.5

17:00

0.0412

MultiRAE Lite (PGM-6208)

12/6/2021

Area B

2.5

8:45

0.0424

MultiRAE Lite (PGM-6208)

12/6/2021

Area B

2.5

13:45

0.0418

MultiRAE Lite (PGM-6208)

12/6/2021

Area B

2.5

16:45

0.0418

MultiRAE Lite (PGM-6208)

12/6/2021

LF WF2

2.5

8:55

0.0427

MultiRAE Lite (PGM-6208)

12/6/2021

LF WF2

2.5

13:55

0.0418

MultiRAE Lite (PGM-6208)

12/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

12/6/2021

LF WF1

2.5

14:00

0.0419

MultiRAE Lite (PGM-6208)

12/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

12/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

12/6/2021

137 Pit C

7

9:35

0.0413

MultiRAE Lite (PGM-6208)

12/6/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

12/6/2021

137 Pit B

8.6

9:45

0.0424

MultiRAE Lite (PGM-6208)

12/6/2021

137 Pit B

8.6

14:45

0.0414

MultiRAE Lite (PGM-6208)

12/6/2021

137 Pit A

8.3

9:55

0.0480

MultiRAE Lite (PGM-6208)

12/6/2021

137 Pit A

8.3

14:55

0.0416

MultiRAE Lite (PGM-6208)

12/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

12/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

12/6/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

12/6/2021

WPR2

2.8

15:15

0.0418

MultiRAE Lite (PGM-6208)

12/6/2021

WPR4

4

10:25

0.0410

MultiRAE Lite (PGM-6208)

12/6/2021

WPR4

4

15:25

0.0425

MultiRAE Lite (PGM-6208)

12/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

12/6/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

12/6/2021

Pit A

5

10:55

0.0422

MultiRAE Lite (PGM-6208)

12/6/2021

Pit A

5

15:55

0.0421

MultiRAE Lite (PGM-6208)

12/6/2021

Pit B

3.6

11:05

0.0413

MultiRAE Lite (PGM-6208)

12/6/2021

Pit B

3.6

16:05

0.0427

MultiRAE Lite (PGM-6208)

15/6/2021

Area A

5.5

8:30

0.0422

MultiRAE Lite (PGM-6208)

15/6/2021

Area A

5.5

13:30

0.0426

MultiRAE Lite (PGM-6208)

15/6/2021

Area A

5.5

17:00

0.0413

MultiRAE Lite (PGM-6208)

15/6/2021

Area B

2.5

8:45

0.0429

MultiRAE Lite (PGM-6208)

15/6/2021

Area B

2.5

13:45

0.0428

MultiRAE Lite (PGM-6208)

15/6/2021

Area B

2.5

16:45

0.0417

MultiRAE Lite (PGM-6208)

15/6/2021

LF WF2

2.5

8:55

0.0414

MultiRAE Lite (PGM-6208)

15/6/2021

LF WF2

2.5

13:55

0.0410

MultiRAE Lite (PGM-6208)

15/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

15/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

15/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

15/6/2021

Pit C

8

14:20

0.0410

MultiRAE Lite (PGM-6208)

15/6/2021

137 Pit C

7

9:35

0.0418

MultiRAE Lite (PGM-6208)

15/6/2021

137 Pit C

7

14:35

0.0415

MultiRAE Lite (PGM-6208)

15/6/2021

137 Pit B

8.6

9:45

0.0415

MultiRAE Lite (PGM-6208)

15/6/2021

137 Pit B

8.6

14:45

0.0414

MultiRAE Lite (PGM-6208)

15/6/2021

137 Pit A

8.3

9:55

0.0415

MultiRAE Lite (PGM-6208)

15/6/2021

137 Pit A

8.3

14:55

0.0421

MultiRAE Lite (PGM-6208)

15/6/2021

WPR1

2.8

10:05

0.0416

MultiRAE Lite (PGM-6208)

15/6/2021

WPR1

2.8

15:05

0.0416

MultiRAE Lite (PGM-6208)

15/6/2021

WPR2

2.8

10:15

0.0416

MultiRAE Lite (PGM-6208)

15/6/2021

WPR2

2.8

15:15

0.0417

MultiRAE Lite (PGM-6208)

15/6/2021

WPR4

4

10:25

0.0418

MultiRAE Lite (PGM-6208)

15/6/2021

WPR4

4

15:25

0.0418

MultiRAE Lite (PGM-6208)

15/6/2021

WPR3

2.8

10:45

0.0423

MultiRAE Lite (PGM-6208)

15/6/2021

WPR3

2.8

15:45

0.0414

MultiRAE Lite (PGM-6208)

15/6/2021

Pit A

5

10:55

0.0418

MultiRAE Lite (PGM-6208)

15/6/2021

Pit A

5

15:55

0.0410

MultiRAE Lite (PGM-6208)

15/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

15/6/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

16/6/2021

Area A

5.5

8:30

0.0430

MultiRAE Lite (PGM-6208)

16/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

16/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

16/6/2021

Area B

2.5

8:45

0.0424

MultiRAE Lite (PGM-6208)

16/6/2021

Area B

2.5

13:45

0.0423

MultiRAE Lite (PGM-6208)

16/6/2021

Area B

2.5

16:45

0.0412

MultiRAE Lite (PGM-6208)

16/6/2021

LF WF2

2.5

8:55

0.0418

MultiRAE Lite (PGM-6208)

16/6/2021

LF WF2

2.5

13:55

0.0423

MultiRAE Lite (PGM-6208)

16/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

16/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

16/6/2021

Pit C

8

9:20

0.0422

MultiRAE Lite (PGM-6208)

16/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

16/6/2021

137 Pit C

7

9:35

0.0435

MultiRAE Lite (PGM-6208)

16/6/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

16/6/2021

137 Pit B

8.6

9:45

0.0414

MultiRAE Lite (PGM-6208)

16/6/2021

137 Pit B

8.6

14:45

0.0425

MultiRAE Lite (PGM-6208)

16/6/2021

137 Pit A

8.3

9:55

0.0426

MultiRAE Lite (PGM-6208)

16/6/2021

137 Pit A

8.3

14:55

0.0415

MultiRAE Lite (PGM-6208)

16/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

16/6/2021

WPR1

2.8

15:05

0.0411

MultiRAE Lite (PGM-6208)

16/6/2021

WPR2

2.8

10:15

0.0422

MultiRAE Lite (PGM-6208)

16/6/2021

WPR2

2.8

15:15

0.0428

MultiRAE Lite (PGM-6208)

16/6/2021

WPR4

4

10:25

0.0421

MultiRAE Lite (PGM-6208)

16/6/2021

WPR4

4

15:25

0.0407

MultiRAE Lite (PGM-6208)

16/6/2021

WPR3

2.8

10:45

0.0418

MultiRAE Lite (PGM-6208)

16/6/2021

WPR3

2.8

15:45

0.0411

MultiRAE Lite (PGM-6208)

16/6/2021

Pit A

5

10:55

0.0415

MultiRAE Lite (PGM-6208)

16/6/2021

Pit A

5

15:55

0.0407

MultiRAE Lite (PGM-6208)

16/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

16/6/2021

Pit B

3.6

16:05

0.0426

MultiRAE Lite (PGM-6208)

17/6/2021

Area A

5.5

8:30

0.0426

MultiRAE Lite (PGM-6208)

17/6/2021

Area A

5.5

13:30

0.0422

MultiRAE Lite (PGM-6208)

17/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

17/6/2021

Area B

2.5

8:45

0.0408

MultiRAE Lite (PGM-6208)

17/6/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

17/6/2021

Area B

2.5

16:45

0.0414

MultiRAE Lite (PGM-6208)

17/6/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

17/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

17/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

17/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

17/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

17/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

17/6/2021

137 Pit C

7

9:35

0.0409

MultiRAE Lite (PGM-6208)

17/6/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

17/6/2021

137 Pit B

8.6

9:45

0.0419

MultiRAE Lite (PGM-6208)

17/6/2021

137 Pit B

8.6

14:45

0.0414

MultiRAE Lite (PGM-6208)

17/6/2021

137 Pit A

8.3

9:55

0.0415

MultiRAE Lite (PGM-6208)

17/6/2021

137 Pit A

8.3

14:55

0.0415

MultiRAE Lite (PGM-6208)

17/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

17/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

17/6/2021

WPR2

2.8

10:15

0.0417

MultiRAE Lite (PGM-6208)

17/6/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

17/6/2021

WPR4

0.6

10:25

0.0410

MultiRAE Lite (PGM-6208)

17/6/2021

WPR4

0.6

15:25

0.0425

MultiRAE Lite (PGM-6208)

17/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

17/6/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

17/6/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

17/6/2021

Pit A

5

15:55

0.0415

MultiRAE Lite (PGM-6208)

17/6/2021

Pit B

3.6

11:05

0.0421

MultiRAE Lite (PGM-6208)

17/6/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

18/6/2021

Area A

5.5

8:30

0.0420

MultiRAE Lite (PGM-6208)

18/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

18/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

18/6/2021

Area B

2.5

8:45

0.0408

MultiRAE Lite (PGM-6208)

18/6/2021

Area B

2.5

13:45

0.0414

MultiRAE Lite (PGM-6208)

18/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

18/6/2021

LF WF2

2.5

8:55

0.0418

MultiRAE Lite (PGM-6208)

18/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

18/6/2021

LF WF1

2.5

9:00

0.0419

MultiRAE Lite (PGM-6208)

18/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

18/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

18/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

18/6/2021

137 Pit C

7

9:35

0.0413

MultiRAE Lite (PGM-6208)

18/6/2021

137 Pit C

7

14:35

0.0435

MultiRAE Lite (PGM-6208)

18/6/2021

137 Pit B

8.6

9:45

0.0419

MultiRAE Lite (PGM-6208)

18/6/2021

137 Pit B

8.6

14:45

0.0415

MultiRAE Lite (PGM-6208)

18/6/2021

137 Pit A

8.3

9:55

0.0419

MultiRAE Lite (PGM-6208)

18/6/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

18/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

18/6/2021

WPR1

2.8

15:05

0.0413

MultiRAE Lite (PGM-6208)

18/6/2021

WPR2

2.8

10:15

0.0415

MultiRAE Lite (PGM-6208)

18/6/2021

WPR2

2.8

15:15

0.0416

MultiRAE Lite (PGM-6208)

18/6/2021

WPR4

0.4

10:25

0.0412

MultiRAE Lite (PGM-6208)

18/6/2021

WPR4

0.4

15:25

0.0415

MultiRAE Lite (PGM-6208)

18/6/2021

WPR3

2.8

10:45

0.0424

MultiRAE Lite (PGM-6208)

18/6/2021

WPR3

2.8

15:45

0.0413

MultiRAE Lite (PGM-6208)

18/6/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

18/6/2021

Pit A

5

15:55

0.0415

MultiRAE Lite (PGM-6208)

18/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

18/6/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

19/6/2021

Area A

5.5

8:30

0.0419

MultiRAE Lite (PGM-6208)

19/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

19/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

19/6/2021

Area B

2.5

8:45

0.0408

MultiRAE Lite (PGM-6208)

19/6/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

19/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

19/6/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

19/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

19/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

19/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

19/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

19/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

19/6/2021

137 Pit C

7

9:35

0.0435

MultiRAE Lite (PGM-6208)

19/6/2021

137 Pit C

7

14:35

0.0415

MultiRAE Lite (PGM-6208)

19/6/2021

137 Pit B

8.6

9:45

0.0424

MultiRAE Lite (PGM-6208)

19/6/2021

137 Pit B

8.6

14:45

0.0415

MultiRAE Lite (PGM-6208)

19/6/2021

137 Pit A

8.3

9:55

0.0409

MultiRAE Lite (PGM-6208)

19/6/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

19/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

19/6/2021

WPR1

2.8

15:05

0.0405

MultiRAE Lite (PGM-6208)

19/6/2021

WPR2

0.3

10:15

0.0419

MultiRAE Lite (PGM-6208)

19/6/2021

WPR2

0.3

15:15

0.0416

MultiRAE Lite (PGM-6208)

19/6/2021

WPR4

0.4

10:25

0.0412

MultiRAE Lite (PGM-6208)

19/6/2021

WPR4

0.4

15:25

0.0415

MultiRAE Lite (PGM-6208)

19/6/2021

WPR3

2.8

10:45

0.0410

MultiRAE Lite (PGM-6208)

19/6/2021

WPR3

2.8

15:45

0.0416

MultiRAE Lite (PGM-6208)

19/6/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

19/6/2021

Pit A

5

15:55

0.0416

MultiRAE Lite (PGM-6208)

19/6/2021

Pit B

3.6

11:05

0.0419

MultiRAE Lite (PGM-6208)

19/6/2021

Pit B

3.6

16:05

0.0421

MultiRAE Lite (PGM-6208)

21/6/2021

Area A

5.5

8:30

0.0421

MultiRAE Lite (PGM-6208)

21/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

21/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

21/6/2021

Area B

2.5

8:45

0.0408

MultiRAE Lite (PGM-6208)

21/6/2021

Area B

2.5

13:45

0.0414

MultiRAE Lite (PGM-6208)

21/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

21/6/2021

LF WF2

2.5

8:55

0.0418

MultiRAE Lite (PGM-6208)

21/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

21/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

21/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

21/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

21/6/2021

Pit C

8

14:20

0.0419

MultiRAE Lite (PGM-6208)

21/6/2021

137 Pit C

7

9:35

0.0423

MultiRAE Lite (PGM-6208)

21/6/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

21/6/2021

137 Pit B

8.6

9:45

0.0426

MultiRAE Lite (PGM-6208)

21/6/2021

137 Pit B

8.6

14:45

0.0410

MultiRAE Lite (PGM-6208)

21/6/2021

137 Pit A

8.3

9:55

0.0421

MultiRAE Lite (PGM-6208)

21/6/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

21/6/2021

WPR1

2.8

10:05

0.0416

MultiRAE Lite (PGM-6208)

21/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

21/6/2021

WPR2

0.3

10:15

0.0410

MultiRAE Lite (PGM-6208)

21/6/2021

WPR2

0.3

15:15

0.0426

MultiRAE Lite (PGM-6208)

21/6/2021

WPR4

0.4

10:25

0.0431

MultiRAE Lite (PGM-6208)

21/6/2021

WPR4

0.4

15:25

0.0428

MultiRAE Lite (PGM-6208)

21/6/2021

WPR3

2.8

10:45

0.0415

MultiRAE Lite (PGM-6208)

21/6/2021

WPR3

2.8

15:45

0.0424

MultiRAE Lite (PGM-6208)

21/6/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

21/6/2021

Pit A

5

15:55

0.0405

MultiRAE Lite (PGM-6208)

21/6/2021

Pit B

3.6

11:05

0.0410

MultiRAE Lite (PGM-6208)

21/6/2021

Pit B

3.6

16:05

0.0412

MultiRAE Lite (PGM-6208)

22/6/2021

Area A

5.5

8:30

0.0420

MultiRAE Lite (PGM-6208)

22/6/2021

Area A

5.5

13:30

0.0426

MultiRAE Lite (PGM-6208)

22/6/2021

Area A

5.5

17:00

0.0408

MultiRAE Lite (PGM-6208)

22/6/2021

Area B

2.5

8:45

0.0424

MultiRAE Lite (PGM-6208)

22/6/2021

Area B

2.5

13:45

0.0411

MultiRAE Lite (PGM-6208)

22/6/2021

Area B

2.5

16:45

0.0431

MultiRAE Lite (PGM-6208)

22/6/2021

LF WF2

2.5

8:55

0.0429

MultiRAE Lite (PGM-6208)

22/6/2021

LF WF2

2.5

13:55

0.0406

MultiRAE Lite (PGM-6208)

22/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

22/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

22/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

22/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

22/6/2021

137 Pit C

7

9:35

0.0430

MultiRAE Lite (PGM-6208)

22/6/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

22/6/2021

137 Pit B

8.6

9:45

0.0419

MultiRAE Lite (PGM-6208)

22/6/2021

137 Pit B

8.6

14:45

0.0411

MultiRAE Lite (PGM-6208)

22/6/2021

137 Pit A

8.3

9:55

0.0405

MultiRAE Lite (PGM-6208)

22/6/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

22/6/2021

WPR1

2.8

10:05

0.0405

MultiRAE Lite (PGM-6208)

22/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

22/6/2021

WPR2

0.3

10:15

0.0415

MultiRAE Lite (PGM-6208)

22/6/2021

WPR2

0.3

15:15

0.0415

MultiRAE Lite (PGM-6208)

22/6/2021

WPR4

0.4

10:25

0.0425

MultiRAE Lite (PGM-6208)

22/6/2021

WPR4

0.4

15:25

0.0421

MultiRAE Lite (PGM-6208)

22/6/2021

WPR3

2.8

10:45

0.0426

MultiRAE Lite (PGM-6208)

22/6/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

22/6/2021

Pit A

5

10:55

0.0416

MultiRAE Lite (PGM-6208)

22/6/2021

Pit A

5

15:55

0.0410

MultiRAE Lite (PGM-6208)

22/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

22/6/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

23/6/2021

Area A

5.5

8:30

0.0430

MultiRAE Lite (PGM-6208)

23/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

23/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

23/6/2021

Area B

2.5

8:45

0.0425

MultiRAE Lite (PGM-6208)

23/6/2021

Area B

2.5

13:45

0.0414

MultiRAE Lite (PGM-6208)

23/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

23/6/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

23/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

23/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

23/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

23/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

23/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

23/6/2021

137 Pit C

7

9:35

0.0423

MultiRAE Lite (PGM-6208)

23/6/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

23/6/2021

137 Pit B

8.6

9:45

0.0424

MultiRAE Lite (PGM-6208)

23/6/2021

137 Pit B

8.6

14:45

0.0415

MultiRAE Lite (PGM-6208)

23/6/2021

137 Pit A

8.3

9:55

0.0405

MultiRAE Lite (PGM-6208)

23/6/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

23/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

23/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

23/6/2021

WPR2

0.3

10:15

0.0410

MultiRAE Lite (PGM-6208)

23/6/2021

WPR2

0.3

15:15

0.0415

MultiRAE Lite (PGM-6208)

23/6/2021

WPR4

0.4

10:25

0.0425

MultiRAE Lite (PGM-6208)

23/6/2021

WPR4

0.4

15:25

0.0415

MultiRAE Lite (PGM-6208)

23/6/2021

WPR3

2.8

10:45

0.0410

MultiRAE Lite (PGM-6208)

23/6/2021

WPR3

2.8

15:45

0.0423

MultiRAE Lite (PGM-6208)

23/6/2021

Pit A

5

10:55

0.0426

MultiRAE Lite (PGM-6208)

23/6/2021

Pit A

5

15:55

0.0410

MultiRAE Lite (PGM-6208)

23/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

23/6/2021

Pit B

3.6

16:05

0.0413

MultiRAE Lite (PGM-6208)

24/6/2021

Area A

5.5

8:30

0.0438

MultiRAE Lite (PGM-6208)

24/6/2021

Area A

5.5

13:30

0.0421

MultiRAE Lite (PGM-6208)

24/6/2021

Area A

5.5

17:00

0.0408

MultiRAE Lite (PGM-6208)

24/6/2021

Area B

2.5

8:45

0.0418

MultiRAE Lite (PGM-6208)

24/6/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

24/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

24/6/2021

LF WF2

2.5

8:55

0.0415

MultiRAE Lite (PGM-6208)

24/6/2021

LF WF2

2.5

13:55

0.0424

MultiRAE Lite (PGM-6208)

24/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

24/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

24/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

24/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

24/6/2021

137 Pit C

7

9:35

0.0431

MultiRAE Lite (PGM-6208)

24/6/2021

137 Pit C

7

14:35

0.0401

MultiRAE Lite (PGM-6208)

24/6/2021

137 Pit B

8.6

9:45

0.0425

MultiRAE Lite (PGM-6208)

24/6/2021

137 Pit B

8.6

14:45

0.0410

MultiRAE Lite (PGM-6208)

24/6/2021

137 Pit A

8.3

9:55

0.0415

MultiRAE Lite (PGM-6208)

24/6/2021

137 Pit A

8.3

14:55

0.0415

MultiRAE Lite (PGM-6208)

24/6/2021

WPR1

2.8

10:05

0.0416

MultiRAE Lite (PGM-6208)

24/6/2021

WPR1

2.8

15:05

0.0424

MultiRAE Lite (PGM-6208)

24/6/2021

WPR2

0.3

10:15

0.0410

MultiRAE Lite (PGM-6208)

24/6/2021

WPR2

0.3

15:15

0.0406

MultiRAE Lite (PGM-6208)

24/6/2021

WPR4

0.4

10:25

0.0420

MultiRAE Lite (PGM-6208)

24/6/2021

WPR4

0.4

15:25

0.0410

MultiRAE Lite (PGM-6208)

24/6/2021

WPR3

2.8

10:45

0.0424

MultiRAE Lite (PGM-6208)

24/6/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

24/6/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

24/6/2021

Pit A

5

15:55

0.0415

MultiRAE Lite (PGM-6208)

24/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

24/6/2021

Pit B

3.6

16:05

0.0421

MultiRAE Lite (PGM-6208)

25/6/2021

Area A

5.5

8:30

0.0426

MultiRAE Lite (PGM-6208)

25/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

25/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

25/6/2021

Area B

2.5

8:45

0.0408

MultiRAE Lite (PGM-6208)

25/6/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

25/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

25/6/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

25/6/2021

LF WF2

2.5

13:55

0.0416

MultiRAE Lite (PGM-6208)

25/6/2021

LF WF1

2.5

9:00

0.0422

MultiRAE Lite (PGM-6208)

25/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

25/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

25/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

25/6/2021

137 Pit C

7

9:35

0.0435

MultiRAE Lite (PGM-6208)

25/6/2021

137 Pit C

7

14:35

0.0401

MultiRAE Lite (PGM-6208)

25/6/2021

137 Pit B

8.6

9:45

0.0409

MultiRAE Lite (PGM-6208)

25/6/2021

137 Pit B

8.6

14:45

0.0415

MultiRAE Lite (PGM-6208)

25/6/2021

137 Pit A

8.3

9:55

0.0419

MultiRAE Lite (PGM-6208)

25/6/2021

137 Pit A

8.3

14:55

0.0415

MultiRAE Lite (PGM-6208)

25/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

25/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

25/6/2021

WPR2

0.3

10:15

0.0415

MultiRAE Lite (PGM-6208)

25/6/2021

WPR2

0.3

15:15

0.0415

MultiRAE Lite (PGM-6208)

25/6/2021

WPR4

0.4

10:25

0.0410

MultiRAE Lite (PGM-6208)

25/6/2021

WPR4

0.4

15:25

0.0412

MultiRAE Lite (PGM-6208)

25/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

25/6/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

25/6/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

25/6/2021

Pit A

5

15:55

0.0415

MultiRAE Lite (PGM-6208)

25/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

25/6/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

26/6/2021

Area A

5.5

8:30

0.0426

MultiRAE Lite (PGM-6208)

26/6/2021

Area A

5.5

13:30

0.0413

MultiRAE Lite (PGM-6208)

26/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

26/6/2021

Area B

2.5

8:45

0.0426

MultiRAE Lite (PGM-6208)

26/6/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

26/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

26/6/2021

LF WF2

2.5

8:55

0.0418

MultiRAE Lite (PGM-6208)

26/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

26/6/2021

LF WF1

2.5

9:00

0.0403

MultiRAE Lite (PGM-6208)

26/6/2021

LF WF1

2.5

14:00

0.0426

MultiRAE Lite (PGM-6208)

26/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

26/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

26/6/2021

137 Pit C

7

9:35

0.0431

MultiRAE Lite (PGM-6208)

26/6/2021

137 Pit C

7

14:35

0.0424

MultiRAE Lite (PGM-6208)

26/6/2021

137 Pit B

8.6

9:45

0.0410

MultiRAE Lite (PGM-6208)

26/6/2021

137 Pit B

8.6

14:45

0.0411

MultiRAE Lite (PGM-6208)

26/6/2021

137 Pit A

8.3

9:55

0.0425

MultiRAE Lite (PGM-6208)

26/6/2021

137 Pit A

8.3

14:55

0.0426

MultiRAE Lite (PGM-6208)

26/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

26/6/2021

WPR1

2.8

15:05

0.0406

MultiRAE Lite (PGM-6208)

26/6/2021

WPR2

0.3

10:15

0.0423

MultiRAE Lite (PGM-6208)

26/6/2021

WPR2

0.3

15:15

0.0415

MultiRAE Lite (PGM-6208)

26/6/2021

WPR4

0.4

10:25

0.0410

MultiRAE Lite (PGM-6208)

26/6/2021

WPR4

0.4

15:25

0.0422

MultiRAE Lite (PGM-6208)

26/6/2021

WPR3

2.8

10:45

0.0412

MultiRAE Lite (PGM-6208)

26/6/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

26/6/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

26/6/2021

Pit A

5

15:55

0.0423

MultiRAE Lite (PGM-6208)

26/6/2021

Pit B

3.6

11:05

0.0416

MultiRAE Lite (PGM-6208)

26/6/2021

Pit B

3.6

16:05

0.0427

MultiRAE Lite (PGM-6208)

28/6/2021

Area A

5.5

8:30

0.0430

MultiRAE Lite (PGM-6208)

28/6/2021

Area A

5.5

13:30

0.0418

MultiRAE Lite (PGM-6208)

28/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

28/6/2021

Area B

2.5

8:45

0.0414

MultiRAE Lite (PGM-6208)

28/6/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

28/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

28/6/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

28/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

28/6/2021

LF WF1

2.5

9:00

0.0419

MultiRAE Lite (PGM-6208)

28/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

28/6/2021

Pit C

8

9:20

0.0409

MultiRAE Lite (PGM-6208)

28/6/2021

Pit C

8

14:20

0.0414

MultiRAE Lite (PGM-6208)

28/6/2021

137 Pit C

7

9:35

0.0409

MultiRAE Lite (PGM-6208)

28/6/2021

137 Pit C

7

14:35

0.0404

MultiRAE Lite (PGM-6208)

28/6/2021

137 Pit B

8.6

9:45

0.0413

MultiRAE Lite (PGM-6208)

28/6/2021

137 Pit B

8.6

14:45

0.0424

MultiRAE Lite (PGM-6208)

28/6/2021

137 Pit A

8.3

9:55

0.0429

MultiRAE Lite (PGM-6208)

28/6/2021

137 Pit A

8.3

14:55

0.0408

MultiRAE Lite (PGM-6208)

28/6/2021

WPR1

2.8

10:05

0.0417

MultiRAE Lite (PGM-6208)

28/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

28/6/2021

WPR2

0.3

10:15

0.0415

MultiRAE Lite (PGM-6208)

28/6/2021

WPR2

0.3

15:15

0.0410

MultiRAE Lite (PGM-6208)

28/6/2021

WPR4

0.4

10:25

0.0418

MultiRAE Lite (PGM-6208)

28/6/2021

WPR4

0.4

15:25

0.0412

MultiRAE Lite (PGM-6208)

28/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

28/6/2021

WPR3

2.8

15:45

0.0424

MultiRAE Lite (PGM-6208)

28/6/2021

Pit A

5

10:55

0.0413

MultiRAE Lite (PGM-6208)

28/6/2021

Pit A

5

15:55

0.0426

MultiRAE Lite (PGM-6208)

28/6/2021

Pit B

3.6

11:05

0.0418

MultiRAE Lite (PGM-6208)

28/6/2021

Pit B

3.6

16:05

0.0418

MultiRAE Lite (PGM-6208)

29/6/2021

Area A

5.5

8:30

0.0429

MultiRAE Lite (PGM-6208)

29/6/2021

Area A

5.5

13:30

0.0406

MultiRAE Lite (PGM-6208)

29/6/2021

Area A

5.5

17:00

0.0410

MultiRAE Lite (PGM-6208)

29/6/2021

Area B

2.5

8:45

0.0430

MultiRAE Lite (PGM-6208)

29/6/2021

Area B

2.5

13:45

0.0422

MultiRAE Lite (PGM-6208)

29/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

29/6/2021

LF WF2

2.5

8:55

0.0418

MultiRAE Lite (PGM-6208)

29/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

29/6/2021

LF WF1

2.5

9:00

0.0409

MultiRAE Lite (PGM-6208)

29/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

29/6/2021

Pit C

8

9:20

0.0420

MultiRAE Lite (PGM-6208)

29/6/2021

Pit C

8

14:20

0.0411

MultiRAE Lite (PGM-6208)

29/6/2021

137 Pit C

7

9:35

0.0435

MultiRAE Lite (PGM-6208)

29/6/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

29/6/2021

137 Pit B

8.6

9:45

0.0418

MultiRAE Lite (PGM-6208)

29/6/2021

137 Pit B

8.6

14:45

0.0419

MultiRAE Lite (PGM-6208)

29/6/2021

137 Pit A

8.3

9:55

0.0415

MultiRAE Lite (PGM-6208)

29/6/2021

137 Pit A

8.3

14:55

0.0414

MultiRAE Lite (PGM-6208)

29/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

29/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

29/6/2021

WPR2

2

10:15

0.0417

MultiRAE Lite (PGM-6208)

29/6/2021

WPR2

2

15:15

0.0417

MultiRAE Lite (PGM-6208)

29/6/2021

WPR4

0.4

10:25

0.0425

MultiRAE Lite (PGM-6208)

29/6/2021

WPR4

0.4

15:25

0.0415

MultiRAE Lite (PGM-6208)

29/6/2021

WPR3

2.8

10:45

0.0410

MultiRAE Lite (PGM-6208)

29/6/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

29/6/2021

Pit A

5

10:55

0.0420

MultiRAE Lite (PGM-6208)

29/6/2021

Pit A

5

15:55

0.0415

MultiRAE Lite (PGM-6208)

29/6/2021

Pit B

3.6

11:05

0.0411

MultiRAE Lite (PGM-6208)

29/6/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

30/6/2021

Area A

5.5

8:30

0.0430

MultiRAE Lite (PGM-6208)

30/6/2021

Area A

5.5

13:30

0.0410

MultiRAE Lite (PGM-6208)

30/6/2021

Area A

5.5

17:00

0.0417

MultiRAE Lite (PGM-6208)

30/6/2021

Area B

2.5

8:45

0.0408

MultiRAE Lite (PGM-6208)

30/6/2021

Area B

2.5

13:45

0.0413

MultiRAE Lite (PGM-6208)

30/6/2021

Area B

2.5

16:45

0.0416

MultiRAE Lite (PGM-6208)

30/6/2021

LF WF2

2.5

8:55

0.0408

MultiRAE Lite (PGM-6208)

30/6/2021

LF WF2

2.5

13:55

0.0413

MultiRAE Lite (PGM-6208)

30/6/2021

LF WF1

2.5

9:00

0.0419

MultiRAE Lite (PGM-6208)

30/6/2021

LF WF1

2.5

14:00

0.0414

MultiRAE Lite (PGM-6208)

30/6/2021

Pit C

8

9:20

0.0409

MultiRAE Lite (PGM-6208)

30/6/2021

Pit C

8

14:20

0.0420

MultiRAE Lite (PGM-6208)

30/6/2021

137 Pit C

7

9:35

0.0413

MultiRAE Lite (PGM-6208)

30/6/2021

137 Pit C

7

14:35

0.0414

MultiRAE Lite (PGM-6208)

30/6/2021

137 Pit B

8.6

9:45

0.0409

MultiRAE Lite (PGM-6208)

30/6/2021

137 Pit B

8.6

14:45

0.0414

MultiRAE Lite (PGM-6208)

30/6/2021

137 Pit A

8.3

9:55

0.0419

MultiRAE Lite (PGM-6208)

30/6/2021

137 Pit A

8.3

14:55

0.0415

MultiRAE Lite (PGM-6208)

30/6/2021

WPR1

2.8

10:05

0.0410

MultiRAE Lite (PGM-6208)

30/6/2021

WPR1

2.8

15:05

0.0415

MultiRAE Lite (PGM-6208)

30/6/2021

WPR2

2.8

10:15

0.0410

MultiRAE Lite (PGM-6208)

30/6/2021

WPR2

2.8

15:15

0.0415

MultiRAE Lite (PGM-6208)

30/6/2021

WPR4

4

10:25

0.0410

MultiRAE Lite (PGM-6208)

30/6/2021

WPR4

4

15:25

0.0412

MultiRAE Lite (PGM-6208)

30/6/2021

WPR3

2.8

10:45

0.0414

MultiRAE Lite (PGM-6208)

30/6/2021

WPR3

2.8

15:45

0.0415

MultiRAE Lite (PGM-6208)

30/6/2021

Pit A

5

10:55

0.0410

MultiRAE Lite (PGM-6208)

30/6/2021

Pit A

5

15:55

0.0413

MultiRAE Lite (PGM-6208)

30/6/2021

Pit B

3.6

11:05

0.0426

MultiRAE Lite (PGM-6208)

30/6/2021

Pit B

3.6

16:05

0.0416

MultiRAE Lite (PGM-6208)

2/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

2/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

3/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

WPR3

2.5

10:45

0.0400

MultiRAE Lite (PGM-6208)

5/7/2021

WPR3

2.5

15:45

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

6/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

7/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

8/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

9/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

10/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Pit D

1

9:15

0.0400

MultiRAE Lite (PGM-6208)

12/7/2021

Pit D

1

14:15

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Pit D

1

9:15

0.0400

MultiRAE Lite (PGM-6208)

13/7/2021

Pit D

1

14:15

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Pit D

1

9:15

0.0400

MultiRAE Lite (PGM-6208)

14/7/2021

Pit D

1

14:15

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Pit D

1

9:15

0.0400

MultiRAE Lite (PGM-6208)

15/7/2021

Pit D

1

14:15

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Pit D

1

9:15

0.0400

MultiRAE Lite (PGM-6208)

16/7/2021

Pit D

1

14:15

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Pit D

1

9:15

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Pit D

1

14:15

0.0400

MultiRAE Lite (PGM-6208)

17/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Pit D

1

9:15

0.0400

MultiRAE Lite (PGM-6208)

19/7/2021

Pit D

1

14:15

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Pit D

1

9:15

0.0400

MultiRAE Lite (PGM-6208)

20/7/2021

Pit D

1

14:15

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Pit D

1

9:15

0.0400

MultiRAE Lite (PGM-6208)

21/7/2021

Pit D

1

14:15

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Pit D

1

9:15

0.0400

MultiRAE Lite (PGM-6208)

22/7/2021

Pit D

1

14:15

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Pit D

1

9:15

0.0400

MultiRAE Lite (PGM-6208)

23/7/2021

Pit D

1

14:15

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Pit D

2.5

9:15

0.0400

MultiRAE Lite (PGM-6208)

24/7/2021

Pit D

2.5

14:15

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Pit D

2.5

9:15

0.0400

MultiRAE Lite (PGM-6208)

26/7/2021

Pit D

2.5

14:15

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Pit D

2.5

9:15

0.0400

MultiRAE Lite (PGM-6208)

27/7/2021

Pit D

2.5

14:15

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Pit D

2.5

9:15

0.0400

MultiRAE Lite (PGM-6208)

28/7/2021

Pit D

2.5

14:15

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Pit D

2.5

9:15

0.0400

MultiRAE Lite (PGM-6208)

29/7/2021

Pit D

2.5

14:15

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Pit D

2.5

9:15

0.0400

MultiRAE Lite (PGM-6208)

30/7/2021

Pit D

2.5

14:15

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Area A

5.5

8:30

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Area A

5.5

13:30

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Area A

5.5

17:00

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Area B

2.5

8:45

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Area B

2.5

13:45

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Area B

2.5

16:45

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

LF WF2

2.5

8:55

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

LF WF2

2.5

13:55

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

LF WF1

2.5

9:00

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

LF WF1

2.5

14:00

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Pit C

8

9:25

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Pit C

8

14:25

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

137 Pit C

7

9:45

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

137 Pit C

7

14:45

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

137 Pit B

8.6

9:55

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

137 Pit B

8.6

14:55

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

137 Pit A

8.3

10:05

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

137 Pit A

8.3

15:05

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

WPR1

2.8

10:15

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

WPR1

2.8

15:15

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

WPR2

3.5

10:25

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

WPR2

3.5

15:25

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

WPR3

2.8

10:45

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

WPR3

2.8

15:45

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Pit A

5

10:55

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Pit A

5

15:55

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Pit B

3.6

11:05

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Pit B

3.6

16:05

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Pit D

2.5

9:15

0.0400

MultiRAE Lite (PGM-6208)

31/7/2021

Pit D

2.5

14:15

0.0400

MultiRAE Lite (PGM-6208)



 

 

 

 

 

 

 

 

 

Appendix I

 

Complaint Log and Regulatory Compliance Proforma

 


 

Statistical Summary of Environmental Complaints

 

 

Reporting Period

Environmental Complaint Statistics

Frequency

Cumulative

Complaint Nature

1 May 2021-

31 July 2021

1

3

One project-related environmental complaint was received and the site condition of the concerned area was reviewed by ET. ET noted that although there was no excavation works on-going or scheduled recently, clearance works and works that create disturbance to ground surface were previously conducted. To prevent the muddy water discharge from the construction site, the contractor has implemented and enhanced the mitigation measures to cater for any upcoming rainstorms or heavy precipitation from the site. Sandbags are placed along the site boundary and submersible pump is provided to direct the runoff to the wastewater treatment tank before reusing or discharging into the designated discharge point. Cement application to exposed earth within the site was also observed during the inspection on 13 August 2021, which was being implemented to prevent erosion caused by the precipitation. The temporarily exposed slope and areas were covered by tarpaulin.

 

 

Statistical Summary of Environmental Summons

 

 

Reporting Period

Environmental Summons Statistics

Frequency

Cumulative

Details

1 May 2021-

31 July 2021

0

0

N/A

 

 

Statistical Summary of Environmental Prosecution

 

 

Reporting Period

Environmental Prosecution Statistics

Frequency

Cumulative

Details

1 May 2021-

31 July 2021

0

0

N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Appendix J

 

Noise Impact Monitoring Result



Monitoring Data for NSR4 Creative Secondary School

Date

Time

Weather

Leq-5min, dB(A)

Leq-30min, dB(A)

Leq30

(min)

L10

dB(A)

 

Limit Level, dB(A)*

 

Adjusted Measured Level dB(A)**

Reading (1)

Reading (2)

Reading (3)

Reading (4)

Reading (5)

Reading (6)

Leq30

(min)

L90

dB(A)

07/05/2021*

11:45

-

12:15

Sunny

68.7

68.1

69.2

65.4

66.8

67.7

67.8

71.4

58.6

65.0

64.6

13/05/2021

14:07

-

14:37

Sunny

65.6

67.9

67.3

68.4

67.9

69.1

67.8

71.4

58.2

70.0

--

21/05/2021*

11:15

-

11:45

Sunny

67.1

68.7

67.8

66.0

68.7

68.2

67.8

71.5

59.9

65.0

64.7

26/05/2021*

11:58

-

12:28

Sunny

67.8

66.3

69.3

68.3

68.3

67.3

68.0

72.5

61.1

65.0

64.9

03/06/2021

11:35

-

12:05

Sunny

67.5

70.4

70.2

69.7

65.8

64.8

68.6

71.8

61.2

70.0

--

10/06/2021

11:22

-

11:52

cloudy

66.7

66.3

68.3

67.5

67.1

66.6

67.1

70.5

59.8

70.0

--

19/06/2021

11:48

-

12:18

Sunny

65.4

67.3

66.9

67.9

65.8

66.8

66.8

70.1

57.6

70.0

--

25/06/2021

14:02

-

14:32

cloudy

68.5

69.1

68.7

69.4

67.6

67.1

68.5

71.9

61.1

70.0

--

02/07/2021

09:20

-

09:50

cloudy

68.3

68.7

69.2

68.6

68.9

67.4

68.6

71.9

60.8

70.0

--

08/07/2021

11:18

-

11:48

Sunny

67.4

69.6

65.5

67.9

68.6

68.0

68.0

71.5

58.7

70.0

--

16/07/2021

11:03

-

11:33

Sunny

67.6

68.6

67.4

69.0

66.6

67.9

67.9

71.1

60.7

70.0

--

20/07/2021

11:10

-

11:40

cloudy

66.7

68.3

69.7

69.0

68.0

68.9

68.5

71.2

63.5

70.0

--

28/07/2021

11:16

-

11:46

Sunny

66.0

69.1

65.5

69.4

68.7

68.1

68.0

71.4

60.2

70.0

--

 

Remarks:

*NSR4 was appointed as a Hong Kong Diploma of Secondary Education Examination (HKDSE) examination centre from 03rd to 15th May, 2021 in the reporting period. Examinations were scheduled in the reporting month on 21st and 26th May, 2021. Hence the noise limit level was 65.0 dB(A) on 07th, 21st and 26th May, 2021. The noise limit level was 70 dB(A) for other impact monitoring dates. DSE examination schedule and Academic School Calendar can be found in Appendix O.

** Adjusted Measured Level = 10*log(10^(0.1*measured level) -10^(0.1*baseline level during examination))

** Adjusted Measured Level on 07/05/2021, 21/05/2021 and 26/05/2021 = 10*log(10^(0.1*measured level)-10^(65.0))

 

 

 

 

  

 


 

 

 

 

 

 

Appendix K

 

Academic School Calendar


 

Sourced from:

https://1e833fb1-5af5-4de8-901ff9aeda4354b2.filesusr.com/ugd/611a22_ea5d81f9881541de9c3c7049ba46860d.pdf

 

 


DSE Examination Schedule using NSR4 as Examinatiion Centre - Sourced from Creative Secondary School

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

Appendix L

 

Exceedance Report(s)